Watershed - Upper St. Croix and Eau Claire Rivers (SC18)
Upper St. Croix and Eau Claire Rivers Watershed

Details

The Upper St. Croix and Eau Claire Rivers Watershed is relatively large and extends from south central Douglas County into southeastern Bayfield County. The watershed is 177,850 acres in size and contains 153 miles of streams and rivers, 7,654 acres of lakes and 13,694 acres of wetlands. The watershed is dominated by forest (67%) and is ranked low for nonpoint source issues affecting groundwater. All of the St. Croix drainage from above the Gordon dam is included in this watershed. An abundance of lakes is present .

Date  2010

Ecological Landscapes for Upper St. Croix and Eau Claire Rivers Watershed

Ecological Landscapes

The Upper St. Croix and Eau Claire Rivers Watershed is located primarily in the Northwest Sands Ecological Landscape which is a large glacial outwash system consisting of two major landforms: flat plains or terraces along glacial meltwater channels, and pitted or "collapsed" outwash plains containing kettle lakes. Soils are deep sands, low in organic material and nutrients. Historic vegetation at the time of the General Land Office survey was dominantly jack pine and scrub oak forest and barrens. White and red pine forests were also a sizable component of the Ecological Landscape. Numerous barrens occurred in the southwest half of the Ecological Landscape, and a few large barrens within the northeast half. Most of the trees in the barrens were jack pine, but oak savannas also occurred in the south central part of the Ecological Landscape. Current vegetation is a mix of forest, agriculture, and grassland with some wetlands in the river valleys. Pine, aspen-birch and oak equally (27% each) dominate the forested area of the Ecological Landscape. The maple-basswood, spruce-fir, and lowland hardwood forest type groups occupy small percentages of the Ecological Landscape. Within the open lands, there is a relatively large proportion of grassland and shrub land, a small but locally significant amount of emergent/wet meadow and open water, and very little row-crop agriculture.

Date  2010

Watershed Documents
Watershed Grants
Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Barnes Lake
Status
Complete

Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.

Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.

Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.

Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Bass Lake
Status
Complete

Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.

Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.

Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.

Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Birch Lake
Status
Complete

Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.

Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.

Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.

Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Blue Lake
Status
Complete

Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.

Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.

Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.

Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Bony Lake
Status
Complete

Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.

Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.

Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.

Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Breakfast Lake
Status
Complete

Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.

Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.

Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.

Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Cole Creek
Status
Complete

Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.

Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.

Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.

Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Connor Lake
Status
Complete

Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.

Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.

Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.

Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Cranberry Lake
Status
Complete

Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.

Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.

Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.

Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Devils Lake
Status
Complete

Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.

Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.

Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.

Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Ducetts Lakes
Status
Complete

Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.

Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.

Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.

Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
East Eightmile Lake
Status
Complete

Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.

Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.

Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.

Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Eau Claire River
Status
Complete

Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.

Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.

Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.

Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Control
Date
3/15/2021
Waters Involved
Eau Claire River
Status
Complete

Town Of Barnes: Aquatic Species Established Population Control:
The Town of Barnes (Bayfield County) is continuing an aquatic plant management project to control the population of Eurasian Watermilfoil in Tomahawk Lake and Sand Bar Lakes, and the population of Curly-Leaf Pondweed in Upper and Middle Eau Claire Lakes. The project also increases education regarding Aquatic Invasive Species with additional signage and brochures with maps indicating areas of infestation on each lake, to be distributed at business outlets, boat landings and via direct mail.

Specific project activities include:
1) Contain existing AIS populations within the waterbodies that currently have known populations. 2) Prevent the spread of AIS to other waterbodies. 3) Enhance educational efforts to Barnes community and visitors. 4) Update the APM plan.

Project final deliverables include:
1) Maps and spreadsheets documenting BAISS activity by grid. 2) Aquatic plant point-intercept survey reports and aquatic plant files. 3) Updated DNR approved aquatic plant management plan. 4) Volunteer monitoring summary will be provided along with new discoveries and entered into SWIMS. 4) CBCW watercraft inspection data entered into SWIMS. 5) Samples of education outreach along with a summary of contacts as a result of efforts. 6) Summary of outreach effort, including number of organizations and people contacted and volunteer recruitment or donations as a result.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by regional staff.




Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Ellison Lake
Status
Complete

Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.

Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.

Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.

Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
George Lake
Status
Complete

Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.

Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.

Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.

Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Hay Lake
Status
Complete

Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.

Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.

Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.

Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Henderson Lake
Status
Complete

Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.

Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.

Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.

Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Hills Mill Creek
Status
Complete

Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.

Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.

Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.

Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Idlewild Lake
Status
Complete

Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.

Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.

Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.

Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Island Lake
Status
Complete

Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.

Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.

Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.

Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Kelly Lake
Status
Complete

Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.

Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.

Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.

Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Little Island Lake
Status
Complete

Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.

Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.

Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.

Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Lower Eau Claire Lake
Status
Complete

Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.

Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.

Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.

Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Middle Eau Claire Lake
Status
Complete

Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.

Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.

Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.

Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Control
Date
3/15/2021
Waters Involved
Middle Eau Claire Lake
Status
Complete

Town Of Barnes: Aquatic Species Established Population Control:
The Town of Barnes (Bayfield County) is continuing an aquatic plant management project to control the population of Eurasian Watermilfoil in Tomahawk Lake and Sand Bar Lakes, and the population of Curly-Leaf Pondweed in Upper and Middle Eau Claire Lakes. The project also increases education regarding Aquatic Invasive Species with additional signage and brochures with maps indicating areas of infestation on each lake, to be distributed at business outlets, boat landings and via direct mail.

Specific project activities include:
1) Contain existing AIS populations within the waterbodies that currently have known populations. 2) Prevent the spread of AIS to other waterbodies. 3) Enhance educational efforts to Barnes community and visitors. 4) Update the APM plan.

Project final deliverables include:
1) Maps and spreadsheets documenting BAISS activity by grid. 2) Aquatic plant point-intercept survey reports and aquatic plant files. 3) Updated DNR approved aquatic plant management plan. 4) Volunteer monitoring summary will be provided along with new discoveries and entered into SWIMS. 4) CBCW watercraft inspection data entered into SWIMS. 5) Samples of education outreach along with a summary of contacts as a result of efforts. 6) Summary of outreach effort, including number of organizations and people contacted and volunteer recruitment or donations as a result.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by regional staff.




Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Mimi Lake
Status
Complete

Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.

Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.

Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.

Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Muck Lake
Status
Complete

Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.

Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.

Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.

Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Mulligan Creek
Status
Complete

Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.

Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.

Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.

Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Control
Date
3/15/2021
Waters Involved
Mulligan Creek
Status
Complete

Town Of Barnes: Aquatic Species Established Population Control:
The Town of Barnes (Bayfield County) is continuing an aquatic plant management project to control the population of Eurasian Watermilfoil in Tomahawk Lake and Sand Bar Lakes, and the population of Curly-Leaf Pondweed in Upper and Middle Eau Claire Lakes. The project also increases education regarding Aquatic Invasive Species with additional signage and brochures with maps indicating areas of infestation on each lake, to be distributed at business outlets, boat landings and via direct mail.

Specific project activities include:
1) Contain existing AIS populations within the waterbodies that currently have known populations. 2) Prevent the spread of AIS to other waterbodies. 3) Enhance educational efforts to Barnes community and visitors. 4) Update the APM plan.

Project final deliverables include:
1) Maps and spreadsheets documenting BAISS activity by grid. 2) Aquatic plant point-intercept survey reports and aquatic plant files. 3) Updated DNR approved aquatic plant management plan. 4) Volunteer monitoring summary will be provided along with new discoveries and entered into SWIMS. 4) CBCW watercraft inspection data entered into SWIMS. 5) Samples of education outreach along with a summary of contacts as a result of efforts. 6) Summary of outreach effort, including number of organizations and people contacted and volunteer recruitment or donations as a result.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by regional staff.




Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Ole Lake
Status
Complete

Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.

Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.

Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.

Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Otter Creek
Status
Complete

Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.

Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.

Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.

Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Ounce River
Status
Complete

Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.

Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.

Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.

Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Pickerel Lake
Status
Complete

Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.

Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.

Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.

Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Priest Lake
Status
Complete

Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.

Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.

Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.

Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Robinson Lake
Status
Complete

Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.

Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.

Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.

Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Sand Bar Lake
Status
Complete

Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.

Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.

Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.

Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Control
Date
3/15/2021
Waters Involved
Sand Bar Lake
Status
Complete

Town Of Barnes: Aquatic Species Established Population Control:
The Town of Barnes (Bayfield County) is continuing an aquatic plant management project to control the population of Eurasian Watermilfoil in Tomahawk Lake and Sand Bar Lakes, and the population of Curly-Leaf Pondweed in Upper and Middle Eau Claire Lakes. The project also increases education regarding Aquatic Invasive Species with additional signage and brochures with maps indicating areas of infestation on each lake, to be distributed at business outlets, boat landings and via direct mail.

Specific project activities include:
1) Contain existing AIS populations within the waterbodies that currently have known populations. 2) Prevent the spread of AIS to other waterbodies. 3) Enhance educational efforts to Barnes community and visitors. 4) Update the APM plan.

Project final deliverables include:
1) Maps and spreadsheets documenting BAISS activity by grid. 2) Aquatic plant point-intercept survey reports and aquatic plant files. 3) Updated DNR approved aquatic plant management plan. 4) Volunteer monitoring summary will be provided along with new discoveries and entered into SWIMS. 4) CBCW watercraft inspection data entered into SWIMS. 5) Samples of education outreach along with a summary of contacts as a result of efforts. 6) Summary of outreach effort, including number of organizations and people contacted and volunteer recruitment or donations as a result.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by regional staff.




Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Shunenberg Lake
Status
Complete

Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.

Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.

Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.

Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Smith Lake
Status
Complete

Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.

Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.

Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.

Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Control
Date
4/1/2011
Waters Involved
St Croix Flowage
Status
Complete

Gordon/St. Croix Flowage Association: St. Croix Flowage Apm Plan - 3 Year Continued Implementation Project: Gordon-St. Croix Flowage Association is sponsoring a 3-year project to implement approved activities from its Aquatic Plant Management Plan. Activities include EWM and CLP chemical treatment; 2,4-d residual monitoring; turion density monitoring; annual pre- and post-treatment aquatic plant surveys; Purple Loosestrife control; wild rice monitoring/reporting; AIS monitoring and watercraft inspection program; public meetings and outreach; and annual reporting. The project requires the following project updates annually: technical report with subsequent year\2019s treatment/harvesting plan and communication (i.e. meeting or letter) with lake group.

Deliverables include monitoring results reports for activities listed above and I & E products. This information will be provided in an annual progress and final report with pre- and post-treatment monitoring results and treatment plans for the next year.

Special Conditions: All monitoring and management should follow approved recommendations within the Horseshoe Lake Aquatic Plant Management Plan, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citiizen Lake Monitoring Network protocols, as specified by the Department.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Sweet Lake
Status
Complete

Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.

Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.

Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.

Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Tars Creek
Status
Complete

Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.

Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.

Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.

Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Tars Pond
Status
Complete

Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.

Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.

Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.

Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Tomahawk Lake
Status
Complete

Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.

Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.

Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.

Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Control
Date
4/15/2017
Waters Involved
Tomahawk Lake
Status
Complete

Town Of Barnes: Established Population Control For Sand Bar & Tomahawk: The Town of Barnes is sponsoring a three-year project to implement their approved aquatic plant management activities. Activities include: large-scale EWM herbicide control on Tomahawk and Sand Bar Lakes; herbicide concentration monitoring; DASH removal; aquatic plant monitoring; and substantial volunteer monitoring, education and outreach..

Final deliverables include: summaries and reports of each grant activity, as described in the application; submission of collected data, evaluation, and results; and examples of education and outreach materials.

This scope does not supersede or negate activities described in the grant application and proposal.


Grant Details
Aquatic Invasives Control
Date
3/15/2021
Waters Involved
Tomahawk Lake
Status
Complete

Town Of Barnes: Aquatic Species Established Population Control:
The Town of Barnes (Bayfield County) is continuing an aquatic plant management project to control the population of Eurasian Watermilfoil in Tomahawk Lake and Sand Bar Lakes, and the population of Curly-Leaf Pondweed in Upper and Middle Eau Claire Lakes. The project also increases education regarding Aquatic Invasive Species with additional signage and brochures with maps indicating areas of infestation on each lake, to be distributed at business outlets, boat landings and via direct mail.

Specific project activities include:
1) Contain existing AIS populations within the waterbodies that currently have known populations. 2) Prevent the spread of AIS to other waterbodies. 3) Enhance educational efforts to Barnes community and visitors. 4) Update the APM plan.

Project final deliverables include:
1) Maps and spreadsheets documenting BAISS activity by grid. 2) Aquatic plant point-intercept survey reports and aquatic plant files. 3) Updated DNR approved aquatic plant management plan. 4) Volunteer monitoring summary will be provided along with new discoveries and entered into SWIMS. 4) CBCW watercraft inspection data entered into SWIMS. 5) Samples of education outreach along with a summary of contacts as a result of efforts. 6) Summary of outreach effort, including number of organizations and people contacted and volunteer recruitment or donations as a result.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by regional staff.




Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Totagatic River
Status
Complete

Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.

Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.

Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.

Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Turtle Lake
Status
Complete

Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.

Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.

Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.

Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Twin Lake
Status
Complete

Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.

Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.

Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.

Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Un Spring
Status
Complete

Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.

Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.

Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.

Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Unnamed
Status
Complete

Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.

Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.

Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.

Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Control
Date
3/15/2021
Waters Involved
Unnamed
Status
Complete

Town Of Barnes: Aquatic Species Established Population Control:
The Town of Barnes (Bayfield County) is continuing an aquatic plant management project to control the population of Eurasian Watermilfoil in Tomahawk Lake and Sand Bar Lakes, and the population of Curly-Leaf Pondweed in Upper and Middle Eau Claire Lakes. The project also increases education regarding Aquatic Invasive Species with additional signage and brochures with maps indicating areas of infestation on each lake, to be distributed at business outlets, boat landings and via direct mail.

Specific project activities include:
1) Contain existing AIS populations within the waterbodies that currently have known populations. 2) Prevent the spread of AIS to other waterbodies. 3) Enhance educational efforts to Barnes community and visitors. 4) Update the APM plan.

Project final deliverables include:
1) Maps and spreadsheets documenting BAISS activity by grid. 2) Aquatic plant point-intercept survey reports and aquatic plant files. 3) Updated DNR approved aquatic plant management plan. 4) Volunteer monitoring summary will be provided along with new discoveries and entered into SWIMS. 4) CBCW watercraft inspection data entered into SWIMS. 5) Samples of education outreach along with a summary of contacts as a result of efforts. 6) Summary of outreach effort, including number of organizations and people contacted and volunteer recruitment or donations as a result.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by regional staff.




Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Upper Eau Claire Lake
Status
Complete

Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.

Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.

Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.

Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Control
Date
3/15/2021
Waters Involved
Upper Eau Claire Lake
Status
Complete

Town Of Barnes: Aquatic Species Established Population Control:
The Town of Barnes (Bayfield County) is continuing an aquatic plant management project to control the population of Eurasian Watermilfoil in Tomahawk Lake and Sand Bar Lakes, and the population of Curly-Leaf Pondweed in Upper and Middle Eau Claire Lakes. The project also increases education regarding Aquatic Invasive Species with additional signage and brochures with maps indicating areas of infestation on each lake, to be distributed at business outlets, boat landings and via direct mail.

Specific project activities include:
1) Contain existing AIS populations within the waterbodies that currently have known populations. 2) Prevent the spread of AIS to other waterbodies. 3) Enhance educational efforts to Barnes community and visitors. 4) Update the APM plan.

Project final deliverables include:
1) Maps and spreadsheets documenting BAISS activity by grid. 2) Aquatic plant point-intercept survey reports and aquatic plant files. 3) Updated DNR approved aquatic plant management plan. 4) Volunteer monitoring summary will be provided along with new discoveries and entered into SWIMS. 4) CBCW watercraft inspection data entered into SWIMS. 5) Samples of education outreach along with a summary of contacts as a result of efforts. 6) Summary of outreach effort, including number of organizations and people contacted and volunteer recruitment or donations as a result.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by regional staff.




Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
West Eightmile Lake
Status
Complete

Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.

Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.

Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.

Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
West Fork Totagatic River
Status
Complete

Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.

Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.

Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.

Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Williamson Creek
Status
Complete

Town Of Barnes: Barnes Area Lakes, Eau Claire Chain Of Lakes Education, Prevention & Containment 2011-2013 Project: The Town of Barnes is sponsoring a 3-year project to implement approved activities from the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans including chemical treatment of EWM on Sandbar Lake, annual pre- and post-treatment aquatic plant surveys, EWM monitoring on Tomahawk and Sandbar Lakes, revegetatation of Tomahawk Lake, and town-wide watercraft inspection and I & E activities.

Specific project tasks include: 1) Chemical control of EWM on Sandbar Lake; 2) Pre- and post-treatment aquatic plant surveys; 3) AIS monitoring; 4) AIS Early Detection Rapid Response Plan Development; 5) Replant Tomahawk Lake with native aquatic plant species; 6) Implement watercraft inspection program; 7) Lake user education, workshops, and outreach publications; 8) AIS sign condition evaluation; 9) CLMN sampling including DO and Temperature profiles for Tomahawk and Sandbar Lakes.

Deliverables include annual EWM management progress reports with aquatic plant survey results; watercraft inspection data collection and entry in SWIMS database; signage condition report; photos or examples of educational tools, publications, presentations developed, and summary of attendance, successes and challenges; Early Detection Rapid Response plans for additional AIS; and Plan update, as necessary.

Special Conditions: Surveys, monitoring, and management must follow approved recommendations within the Tomahawk & Sandbar Lakes Aquatic Plant Management Plans, WDNR\2019s Aquatic Plant Management in Wisconsin guidance, and/or Citizen Lake Monitoring Network protocols, as specified by the Department.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Early Detection and Response
Date
1/1/2023
Waters Involved
Eau Claire River
Status
Complete

Town Of Barnes: 2023-2025 Lower Eau Claire Lake Curly-Leaf Pondweed Management Project: The Town of Barnes is sponsoring an AIS rapid response project for 2023-2025 Lower Eau Claire Lake Curly-Leaf Pondweed Management Project.

Project final deliverables include: 1) Development of aquatic plant management plan for Lower Eau Claire Lake 2) Approval of WDNR Mechanical Harvesting permit 3) Development of newsletters, social media posts, and public meetings 4) CLMN AIS monitoring results, and bed mapping data for CLP. 5) Year end reports, schedules, and total CLP harvested by BAISS boat. 6) Maps, GIS files, and final reports of professional whole-lake CLP mapping


Specific project activities include: 1) Plan and implement Aquatic Management Plan 2) Permit application submission 3) Outreach and education to stakeholders/partners of Lower Eau Claire Lake. 4) Completion of CLMN AIS Monitoring protocols, and targeted mapping of CLP. 5) DASH removal of CLP by BAISS Boat. 6) Professional AIS monitoring


Special Conditions: Final Reports need to be reviewed and approved. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of annual reports, final reports, survey data and all maps and GIS prior to submission of grantee\2019s final payment request. All relevant data must be entered into DNR\2019s SWIMS database.



This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.



Grant Details
Aquatic Invasives Early Detection and Response
Date
1/1/2008
Waters Involved
Flat Lake
Status
Complete

Sawyer County: Callahan/Mud Lakes Ewm Control: The Callahan Lake Protective Association in cooperation with Sawyer County Land Conservation Department (Project Sponsor) will conduct an early season herbicide treatment on 16 acres of Eurasian Water Milfoil (EWM). EWM was discovered in 2005 and there is approximately 30 acres within the 585 combined lake acreage.

The project includes the following goals: 1. An early season herbicide treatment on 16 acres of EWM in high traffic areas in Callahan Lake to control the spread. 2. Placement of educational signs at all boat landings. 3. Monitor the EWM throughout the year to determine efficacy of the herbicide treatment and to continue the mapping of EWM. 4. Educate lake association members about EWM, herbicide treatments, other control measures through newsletter articles and trainings.

Project deliverables include: 1. The outcome of the treatment described should show evidence of declining EWM populations in treated areas with no negative effect on native aquatic vegetation and animal species. 2. EWM will be mapped prior to treatment and after treatment. The lake will be surveyed for EWM at one month and three month intervals after the herbicide treatment to determine efficacy of the treatment and regrowth.

Specific conditions for this Project: 1. The Department of Natural Resources recommends that the lake association apply for an AIS education, prevention and planning grant to begin working on a future lake management plan, or an Aquatic plant management plan focusing on future management of EWM. This would include a more detailed evaluation of the aquatic plant community (pre and post monitoring point intercept plant survey). 2. The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.


Grant Details
Aquatic Invasives Early Detection and Response
Date
7/15/2011
Waters Involved
George Lake
Status
Complete

Town Of Barnes: George Lake Ewm Response 2011 - 2014: The Town of Barnes is sponsoring a four-year Eurasian watermilfoil response project on George Lake, Bayfield County, to do the following activities: community information and education; improved signage; aquatic plant survey and management plan; and Eurasian watermilfoil management (e.g. manual removal, herbicide treatment) and monitoring. This project may include monitoring nearby lakes.

Project deliverables include: 1) A project report summarizing information/education, management, and monitoring activities; 2) Pre-post treatment and other monitoring data/results; 3) Aquatic Plant Management Plan, if necessary.

This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Early Detection and Response
Date
1/1/2023
Waters Involved
Lower Eau Claire Lake
Status
Complete

Town Of Barnes: 2023-2025 Lower Eau Claire Lake Curly-Leaf Pondweed Management Project: The Town of Barnes is sponsoring an AIS rapid response project for 2023-2025 Lower Eau Claire Lake Curly-Leaf Pondweed Management Project.

Project final deliverables include: 1) Development of aquatic plant management plan for Lower Eau Claire Lake 2) Approval of WDNR Mechanical Harvesting permit 3) Development of newsletters, social media posts, and public meetings 4) CLMN AIS monitoring results, and bed mapping data for CLP. 5) Year end reports, schedules, and total CLP harvested by BAISS boat. 6) Maps, GIS files, and final reports of professional whole-lake CLP mapping


Specific project activities include: 1) Plan and implement Aquatic Management Plan 2) Permit application submission 3) Outreach and education to stakeholders/partners of Lower Eau Claire Lake. 4) Completion of CLMN AIS Monitoring protocols, and targeted mapping of CLP. 5) DASH removal of CLP by BAISS Boat. 6) Professional AIS monitoring


Special Conditions: Final Reports need to be reviewed and approved. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of annual reports, final reports, survey data and all maps and GIS prior to submission of grantee\2019s final payment request. All relevant data must be entered into DNR\2019s SWIMS database.



This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.



Grant Details
Aquatic Invasives Early Detection and Response
Date
7/1/2012
Waters Involved
Middle Eau Claire Lake
Status
Complete

Town Of Barnes: Middle Eau Claire Lake Clp Early Detection/Response 2012-2016: The Town of Barnes is sponsoring a four-year curlyleaf pondweed response project on Middle Eau Claire, Bayfield County, to do the following activities: community information and education; improved signage; aquatic plant survey and management plan; and curlyleaf pondweed management (e.g. manual removal, herbicide treatment) and monitoring. This project may include monitoring nearby lakes and/or management planning.

Project deliverables include: 1) A project report summarizing information/education, management, and monitoring activities; 2) Pre-post treatment and other monitoring data/results; 3) Aquatic Plant Management Plan, if necessary.

This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Early Detection and Response
Date
7/23/2007
Waters Involved
Saint Croix River
Status
Complete

Douglas County Lwcd: St. Croix/Gordon Flowage Rapid Response Project: Douglas County in partnership with the Gordon/St. Croix Flowage Association is sponsoring an Aquatic Invasive Species Rapid Response (RR). The project will focus on eliminating a pioneering population of Eurasian watermilfoil at the Gordon Dam Couny Park boat landing..

Project activities include:
1) A whole-lake point-intercept survey, funded by a separate grant
2) SCUBA removal of Eurasian watermilfoil and monitoring
3) Chemical treatments, under the guidance of WDNR Aquatic Plant Manager Frank Koshere

Project deliverables include:
1) Final report describing the findings of the surveys and treatment tools, GPS locations, and guidance for continued control actions.

Specific conditions for this project:
- Final report needs Dept review and approval

Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Aquatic Invasives Early Detection and Response
Date
7/1/2013
Waters Involved
Saint Croix River
Status
Complete

University Of Wisconsin-Superior: Upper St. Croix Lk Yellow Iris Early Detection/Response 2013-2015: The University of Wisconsin \2013 Superior is sponsoring a 3 year yellow iris response project to be run through the Lake Superior Research Institute. The project will focus on yellow iris on Upper St. Croix Lake and includes the following activities: project coordination; community information and education; wild rice re-seeding; and yellow iris manual removal) and pre/post monitoring.

Project deliverables include: 1) A project report summarizing information/education, management, and monitoring activities; 2) Pre-post treatment and other monitoring data/results; 3) Aquatic Plant Management Plan, if necessary.

Special condition: A chemical control permit must be applied for if management shifts to herbicide techniques.

This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Early Detection and Response
Date
7/23/2007
Waters Involved
St Croix Flowage
Status
Complete

Douglas County Lwcd: St. Croix/Gordon Flowage Rapid Response Project: Douglas County in partnership with the Gordon/St. Croix Flowage Association is sponsoring an Aquatic Invasive Species Rapid Response (RR). The project will focus on eliminating a pioneering population of Eurasian watermilfoil at the Gordon Dam Couny Park boat landing..

Project activities include:
1) A whole-lake point-intercept survey, funded by a separate grant
2) SCUBA removal of Eurasian watermilfoil and monitoring
3) Chemical treatments, under the guidance of WDNR Aquatic Plant Manager Frank Koshere

Project deliverables include:
1) Final report describing the findings of the surveys and treatment tools, GPS locations, and guidance for continued control actions.

Specific conditions for this project:
- Final report needs Dept review and approval

Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Aquatic Invasives Early Detection and Response
Date
7/1/2013
Waters Involved
Unnamed
Status
Complete

University Of Wisconsin-Superior: Upper St. Croix Lk Yellow Iris Early Detection/Response 2013-2015: The University of Wisconsin \2013 Superior is sponsoring a 3 year yellow iris response project to be run through the Lake Superior Research Institute. The project will focus on yellow iris on Upper St. Croix Lake and includes the following activities: project coordination; community information and education; wild rice re-seeding; and yellow iris manual removal) and pre/post monitoring.

Project deliverables include: 1) A project report summarizing information/education, management, and monitoring activities; 2) Pre-post treatment and other monitoring data/results; 3) Aquatic Plant Management Plan, if necessary.

Special condition: A chemical control permit must be applied for if management shifts to herbicide techniques.

This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Early Detection and Response
Date
7/1/2012
Waters Involved
Upper Eau Claire Lake
Status
Complete

Town Of Barnes: Upper Eau Claire Lake Clp Early Detection/Response 2012-2016: The Town of Barnes is sponsoring a four-year curlyleaf pondweed response project on Upper Eau Claire, Bayfield County, to do the following activities: community information and education; improved signage; aquatic plant survey and management plan; and curlyleaf pondweed management (e.g. manual removal, herbicide treatment) and monitoring. This project may include monitoring nearby lakes and/or management planning.

Project deliverables include: 1) A project report summarizing information/education, management, and monitoring activities; 2) Pre-post treatment and other monitoring data/results; 3) Aquatic Plant Management Plan, if necessary.

This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Early Detection and Response
Date
7/1/2013
Waters Involved
Upper Saint Croix Lake
Status
Complete

University Of Wisconsin-Superior: Upper St. Croix Lk Yellow Iris Early Detection/Response 2013-2015: The University of Wisconsin \2013 Superior is sponsoring a 3 year yellow iris response project to be run through the Lake Superior Research Institute. The project will focus on yellow iris on Upper St. Croix Lake and includes the following activities: project coordination; community information and education; wild rice re-seeding; and yellow iris manual removal) and pre/post monitoring.

Project deliverables include: 1) A project report summarizing information/education, management, and monitoring activities; 2) Pre-post treatment and other monitoring data/results; 3) Aquatic Plant Management Plan, if necessary.

Special condition: A chemical control permit must be applied for if management shifts to herbicide techniques.

This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Anderson Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Arnold Creek
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Barnes Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Bass Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Beauregard Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Big Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Birch Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Bird Sanctuary Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Black Fox Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Blue Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Blue Springs
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Bois Brule River
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Bony Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Boot Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Breakfast Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Buckety Creek
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Carlson Creek
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Catherine Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Cedar Island Ponds
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Cole Creek
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Connor Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Cranberry Creek
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Cranberry Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Crotte Creek
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Deer Print Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2005
Waters Involved
Devils Lake
Status
Complete

Town Of Barnes: Barnes Eurasian Water Milfoil 2005 Project: The Town of Barnes is sponsoring an aquatic invasive species (AIS) project for 2005 to address concerns about Eurasian Water Milfoil (EWM) in two area lakes and the potential for it's spread to other lakes in the area. The project includes 27 lakes in two counties and three townships. 10 of these lakes have public access including one of the infested lakes and the three main lakes in the Eau Claire Chain.

Project objectives include: 1. Watercraft inspection in accordance with the "Clean Boats, Clean Waters" program, on all lakes with public access. 2. A public education and information campaign focused on the threat posed by EWM and what the public can do to prevent its spread.
3. Three (June, July, & August) comprehensive aquatic plant surveys to be done on 27 lakes. Special emphasis will be given to the lakes with public access and the Eau Claire Chain lakes.

A part time seasonal coordinator will be hired to direct volunteer support and facilitate the project. Two seasonal aquatic plant surveyors will be hired to facilitate the aquatic plant surveys on the Eau Claire Chain. Volunteers will be used to conduct all other lake surveys.

A final report shall be completed including: 1. A list of lakes named in the project with and without AIS.
2. Maps showing locations of any known aquatic invasive species. 3. Aquatic plant surveys results.
4. Watercraft inspection summary including total time spent and number of people reached. 5. Preliminary findings associated with the CBCW surveys. 6. Education and informational materials.
7. Photos of boat landing signs at the four public access points. 8. Proposed management plan for future EWM management and control. *In addition, all CBCW program activities will be reported in accordance with CBCW guidelines.

Special conditions for this project: *The project sponsor shall immediately report any potential new EWM infestation to Frank Koshere (715/392-0807) or Dave Blumer (715/635-4078).


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Devils Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Ducetts Lakes
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
East Eightmile Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2005
Waters Involved
Eau Claire River
Status
Complete

Town Of Barnes: Barnes Eurasian Water Milfoil 2005 Project: The Town of Barnes is sponsoring an aquatic invasive species (AIS) project for 2005 to address concerns about Eurasian Water Milfoil (EWM) in two area lakes and the potential for it's spread to other lakes in the area. The project includes 27 lakes in two counties and three townships. 10 of these lakes have public access including one of the infested lakes and the three main lakes in the Eau Claire Chain.

Project objectives include: 1. Watercraft inspection in accordance with the "Clean Boats, Clean Waters" program, on all lakes with public access. 2. A public education and information campaign focused on the threat posed by EWM and what the public can do to prevent its spread.
3. Three (June, July, & August) comprehensive aquatic plant surveys to be done on 27 lakes. Special emphasis will be given to the lakes with public access and the Eau Claire Chain lakes.

A part time seasonal coordinator will be hired to direct volunteer support and facilitate the project. Two seasonal aquatic plant surveyors will be hired to facilitate the aquatic plant surveys on the Eau Claire Chain. Volunteers will be used to conduct all other lake surveys.

A final report shall be completed including: 1. A list of lakes named in the project with and without AIS.
2. Maps showing locations of any known aquatic invasive species. 3. Aquatic plant surveys results.
4. Watercraft inspection summary including total time spent and number of people reached. 5. Preliminary findings associated with the CBCW surveys. 6. Education and informational materials.
7. Photos of boat landing signs at the four public access points. 8. Proposed management plan for future EWM management and control. *In addition, all CBCW program activities will be reported in accordance with CBCW guidelines.

Special conditions for this project: *The project sponsor shall immediately report any potential new EWM infestation to Frank Koshere (715/392-0807) or Dave Blumer (715/635-4078).


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Eau Claire River
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Eau Claire River Flowage
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Ellison Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Ericson Creek
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Flamang Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Flat Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
George Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Hay Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Henderson Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
High Life Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Hills Mill Creek
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Hopkins Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Horseshoe Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Idlewild Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Island Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Jack Pine Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Kelly Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Island Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Simms Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Loon Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lord Creek
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lower Eau Claire Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lower Eau Claire Lake
Status
Proposed

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lower Ox Creek
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lower Ox Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lucius Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lund Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
McDougal Springs
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Metzger Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2005
Waters Involved
Middle Eau Claire Lake
Status
Complete

Town Of Barnes: Barnes Eurasian Water Milfoil 2005 Project: The Town of Barnes is sponsoring an aquatic invasive species (AIS) project for 2005 to address concerns about Eurasian Water Milfoil (EWM) in two area lakes and the potential for it's spread to other lakes in the area. The project includes 27 lakes in two counties and three townships. 10 of these lakes have public access including one of the infested lakes and the three main lakes in the Eau Claire Chain.

Project objectives include: 1. Watercraft inspection in accordance with the "Clean Boats, Clean Waters" program, on all lakes with public access. 2. A public education and information campaign focused on the threat posed by EWM and what the public can do to prevent its spread.
3. Three (June, July, & August) comprehensive aquatic plant surveys to be done on 27 lakes. Special emphasis will be given to the lakes with public access and the Eau Claire Chain lakes.

A part time seasonal coordinator will be hired to direct volunteer support and facilitate the project. Two seasonal aquatic plant surveyors will be hired to facilitate the aquatic plant surveys on the Eau Claire Chain. Volunteers will be used to conduct all other lake surveys.

A final report shall be completed including: 1. A list of lakes named in the project with and without AIS.
2. Maps showing locations of any known aquatic invasive species. 3. Aquatic plant surveys results.
4. Watercraft inspection summary including total time spent and number of people reached. 5. Preliminary findings associated with the CBCW surveys. 6. Education and informational materials.
7. Photos of boat landing signs at the four public access points. 8. Proposed management plan for future EWM management and control. *In addition, all CBCW program activities will be reported in accordance with CBCW guidelines.

Special conditions for this project: *The project sponsor shall immediately report any potential new EWM infestation to Frank Koshere (715/392-0807) or Dave Blumer (715/635-4078).


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Middle Eau Claire Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Mimi Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Mirror Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Moose Branch Flowage
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Moose River
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Muck Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Mud Creek
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Mud Creek Springs
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Mud Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2005
Waters Involved
Mulligan Creek
Status
Complete

Town Of Barnes: Barnes Eurasian Water Milfoil 2005 Project: The Town of Barnes is sponsoring an aquatic invasive species (AIS) project for 2005 to address concerns about Eurasian Water Milfoil (EWM) in two area lakes and the potential for it's spread to other lakes in the area. The project includes 27 lakes in two counties and three townships. 10 of these lakes have public access including one of the infested lakes and the three main lakes in the Eau Claire Chain.

Project objectives include: 1. Watercraft inspection in accordance with the "Clean Boats, Clean Waters" program, on all lakes with public access. 2. A public education and information campaign focused on the threat posed by EWM and what the public can do to prevent its spread.
3. Three (June, July, & August) comprehensive aquatic plant surveys to be done on 27 lakes. Special emphasis will be given to the lakes with public access and the Eau Claire Chain lakes.

A part time seasonal coordinator will be hired to direct volunteer support and facilitate the project. Two seasonal aquatic plant surveyors will be hired to facilitate the aquatic plant surveys on the Eau Claire Chain. Volunteers will be used to conduct all other lake surveys.

A final report shall be completed including: 1. A list of lakes named in the project with and without AIS.
2. Maps showing locations of any known aquatic invasive species. 3. Aquatic plant surveys results.
4. Watercraft inspection summary including total time spent and number of people reached. 5. Preliminary findings associated with the CBCW surveys. 6. Education and informational materials.
7. Photos of boat landing signs at the four public access points. 8. Proposed management plan for future EWM management and control. *In addition, all CBCW program activities will be reported in accordance with CBCW guidelines.

Special conditions for this project: *The project sponsor shall immediately report any potential new EWM infestation to Frank Koshere (715/392-0807) or Dave Blumer (715/635-4078).


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Mulligan Creek
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Murray Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Ole Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
One Mile Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Otter Creek
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Ounce River
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Paradise Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Pickerel Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Plate Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Priest Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Robinson Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Rock Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Rush Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Saint Croix River
Status
Complete

Gordon/St. Croix Flowage Association: Gordon/St. Croix Flowage Ais Prevention & Education Project: The Gordon St. Croix Flowage Association is sponsoring an AIS prevention project including monitoring of launches by boat inspections, an aquatic plant survey, & construction of a kiosk to inform the public of AIS. A consultant will be hired for administration; a part-time supervisor will be hired to train, schedule, & oversee paid & volunteer workers; an aquatic plant survey will be completed with the assistance of UW-Stevens Point.

Activities include:
1. Public landing boat inspections & boater education from Memorial Day weekend to Labor Day weekend and fishing opener weekend.
2. Aquatic plant survey using the Point Intercept Survey method; aquatic macrophyte samples to be sent to a herbarium for identification
3. Construction of an information kiosk at the landing to increase boater awareness of AIS.

Project deliverables include a comprehensive report including:
1) Documentation of donated time & services related to grant administration. 2) AIS related brochures & educational materials 3) Verification of inspector & monitor training including agendas & attendance lists. 4) Watercraft inspection reports including time & number of people reached & CB/CW survey results. 5) Aquatic plant survey report including supporting graphs & maps. 6) Photos of the educational kiosk.

Special conditions: The project sponsor shall immediately contact the DNR in the event of a new AIS infestation.

This scope summarizes the grant application and does not supersede application specifics. Data, records, and reports, must be submitted to the Department in a format specified by the Lake Coordinator. If a consultant is to provide the final report, it is recommended the Grantee provide the Lake Coordinator a draft for comment. DNR will receive both paper and electronic copies of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Saint Croix River
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Saint Croix River
Status
Complete

Village Of Solon Springs: Ais Control For Evasion Of Watermilfoil: The Village of Solon Springs is sponsoring an AIS project on Upper St. Croix Lake which includes monitoring of boat launches by boat inspectors; educating boaters about AIS & prevention; public education through the use of trained volunteers going door to door informing lakeshore property owners about AIS; placing articles in newsletters & local newspapers; presenting AIS information at local meeting of civic & government groups.

The public boat landing inspection program will run from Memorial Day weekend through Labor Day weekend. A part-time supervisor will be hired to train, schedule, & oversee paid & volunteer workers.

Deliverables include a comprehensive report including: 1) Documentation of donated time & services related to grant administration. 2) Watercraft inspection report including time & number of people reached; CB/lCW survey results; survey results will be entered into a CB/CW database. 3) Copies of newsletters, educational materials, & brochures used at the boat landings or distributed to the public. 6) Agenda & minutes of civic or government meetings where AIS presentations are made. 7) AIS related materials generated or paid for by this grant.

Special conditions: The project sponsor shall immediately contact the DNR in the event of a new AIS infestation.

This scope summarizes the scope provided in the grant application & does not supersede application specifics. Data, records, & reports, including GIS-based maps & digital images, must be submitted to the Department in a format specified by the Lake Coordinator. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment. DNR to receive both paper & electronic copies of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Saint Croix River
Status
Complete

Upper St Croix Lake Association: Eurasian Watermilfoil Monitoring On Upper St. Croix & Headwaters: The Village of Solon Springs is sponsoring a continuation of their AIS project on Upper St. Croix Lake.

Activities include: 1) Hiring a part-time supervisor to train, schedule, & oversee paid & volunteer workers; 2) Monitoring of boat launches by boat inspectors from Memorial Day weekend through Labor Day weekend.; 3) Educating boaters about AIS & prevention; 4) Public education through use of trained volunteers going door to door informing lakeshore property owners about AIS; 5) Placing articles in newsletters & newspapers; presenting AIS information at local meeting of civic & government groups.

Deliverables include a paper and electronic copy of final report including: 1) Watercraft inspection report including time and number of people reached; CB/CW survey results; results will be entered into the DNR CB/CW database; 2) Copies of newsletters, educational materials, & brochures used at the boat landings or distributed to the public; 3) Agenda & minutes of civic or government meetings where AIS presentations are made; 4) AIS related materials generated or paid for by this grant.

Special conditions for this project: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.

This scope summarizes the scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. If the Grantee is developing the final report a draft report/deliverables should be submitted to the regional Lake Coordinator. DNR to receive both paper and electronic.pdf copies of the final report


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Saint Croix River
Status
Complete

Upper St Croix Lake Association: Ais Education, Prevention & Monitoring On Upper St. Croix Lake & Headwaters Of St. Croix River: The Upper St. Croix Lake Association is sponsoring an AIS prevention and education project including a Clean Boat/Clean Water inspection program at three public boat landings, lake resident education, education workshop, newsletter & brochure distribution, and periodic monitoring for invasive aquatic plants around Upper St. Croix Lake.

Deliverables include a paper and electronic copy of comprehensive Report including: 1) Final Report summarizing accomplishments of the project including watercraft inspection and lake monitoring reports detailing time and number of people reached; 2) CB/CW survey results; daily results will be entered into the DNR CB/CW database; 3) Verification of lake-resident/public education, workshops, and/or inspector training (agendas and attendance lists); 4) Copies of brochures, educational materials, and mailings; 5) Aquatic plant monitoring results including boat and shoreline observations of any detected aquatic invasive species with maps; 6) Report on Purple Loosestrife control program; 7) AIS related materials generated or paid for by this grant.

Special project conditions: Sponsor shall immediately contact the DNR if a new aquatic invasive species is found.

This scope summarizes the project detail in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. If consultant is to provide final report, it is recommended that Grantee withhold final payment to consultant pending DNR comment on report adequacy.


Grant Details
Aquatic Invasives Education
Date
10/1/2010
Waters Involved
Saint Croix River
Status
Complete

Upper St Croix Lake Association: Ais Education, Prevention & Monitoring On Upper St. Croix Lk & Headwaters Of St. Croix River: The Upper St. Croix Lake Association is sponsoring an AIS prevention and education project including a Clean Boat/Clean Water inspection program at three public boat landings, lake resident education, education workshop, newsletter & brochure distribution, and periodic monitoring for invasive aquatic plants around Upper St. Croix Lake.

Deliverables include: 1) A summary of accomplishments/progress of the project including watercraft inspection and lake monitoring report detailing total time and number of people reached; 2) CB/CW survey results; daily results must be entered into the DNR CB/CW database; 3) Verification of lake-resident/public education, workshops, and/or inspector training such as agendas and attendance lists; 4) Outreach report including copies of news releases, brochures, educational materials, and mailings. 5) Report on aquatic plant monitoring results including boat and shoreline observations of any detected aquatic invasive species with appropriate maps; 6) Report on Purple Loosestrife control program; 7) AIS related materials generated or paid for by this grant.

Special conditions for this project: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report. If consultant is to provide final report, it is recommended that Grantee provide AIS Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant.


Grant Details
Aquatic Invasives Education
Date
10/1/2013
Waters Involved
Saint Croix River
Status
Complete

Upper St Croix Lake Association: Ais Education, Prevention & Monitoring Project: Upper St. Croix Lake Association is sponsoring a watercraft inspection, monitoring, and community outreach/education project. Project activities include watercraft inspection at 3 boat landings; AIS monitoring throughout the lake; and a community outreach/education partnership with the local school. The deliverables include all watercraft inspection data entered into SWIMS and a summary of other project activities and any examples of education materials developed.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, reports, and education materials, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional lake coordinator.


Grant Details
Aquatic Invasives Education
Date
2/15/2015
Waters Involved
Saint Croix River
Status
Complete

Upper St Croix Lake Association: Ais Control & Cbcw Project: Upper St. Croix Lake Association is sponsoring a project to complete CBCW at three landings, AIS education & outreach, and support ongoing purple loosestrife control efforts around the lake. The final deliverables include: all CBCW data entered into SWIMS and a project report summarizing education and outreach, planning and control activities. The specific objectives, metrics, and deliverables for the listed activities are included in the application and supporting materials, and this scope is not intended to replace or supersede those documents


Grant Details
Aquatic Invasives Education
Date
2/15/2016
Waters Involved
Saint Croix River
Status
Complete

Gordon/St. Croix Flowage Association: St. Croix Flowage Ewm Survey & Treatment Follow-Up: Gordon St. Croix Flowage Association is sponsoring a project to better understand most recent EWM control and plan for a future management strategy.

The Project includes: aquatic plant and AIS monitoring, including evaluating the effectiveness of 2015 management; management planning; volunteer AIS monitoring, including shoreland surveys; and education/outreach, including a Kids on the Flowage event in partnership with local school districts.

Deliverables include: entered data, monitoring results and maps, 2016 and 2017 APM Plans, and education/outreach summary with examples of materials developed.

The specific objectives, metrics, and deliverables for the listed activities are included in the application and supporting materials, and this scope is not intended to replace or supersede those documents. The Department may request quarterly progress reports.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Sand Bar Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Sand Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Sheosh Creek
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Shunenberg Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Simms Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2005
Waters Involved
Smith Lake
Status
Complete

Town Of Barnes: Barnes Eurasian Water Milfoil 2005 Project: The Town of Barnes is sponsoring an aquatic invasive species (AIS) project for 2005 to address concerns about Eurasian Water Milfoil (EWM) in two area lakes and the potential for it's spread to other lakes in the area. The project includes 27 lakes in two counties and three townships. 10 of these lakes have public access including one of the infested lakes and the three main lakes in the Eau Claire Chain.

Project objectives include: 1. Watercraft inspection in accordance with the "Clean Boats, Clean Waters" program, on all lakes with public access. 2. A public education and information campaign focused on the threat posed by EWM and what the public can do to prevent its spread.
3. Three (June, July, & August) comprehensive aquatic plant surveys to be done on 27 lakes. Special emphasis will be given to the lakes with public access and the Eau Claire Chain lakes.

A part time seasonal coordinator will be hired to direct volunteer support and facilitate the project. Two seasonal aquatic plant surveyors will be hired to facilitate the aquatic plant surveys on the Eau Claire Chain. Volunteers will be used to conduct all other lake surveys.

A final report shall be completed including: 1. A list of lakes named in the project with and without AIS.
2. Maps showing locations of any known aquatic invasive species. 3. Aquatic plant surveys results.
4. Watercraft inspection summary including total time spent and number of people reached. 5. Preliminary findings associated with the CBCW surveys. 6. Education and informational materials.
7. Photos of boat landing signs at the four public access points. 8. Proposed management plan for future EWM management and control. *In addition, all CBCW program activities will be reported in accordance with CBCW guidelines.

Special conditions for this project: *The project sponsor shall immediately report any potential new EWM infestation to Frank Koshere (715/392-0807) or Dave Blumer (715/635-4078).


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Smith Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Spring Creek
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Spring Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
St Croix Flowage
Status
Complete

Gordon/St. Croix Flowage Association: Gordon/St. Croix Flowage Ais Prevention & Education Project: The Gordon St. Croix Flowage Association is sponsoring an AIS prevention project including monitoring of launches by boat inspections, an aquatic plant survey, & construction of a kiosk to inform the public of AIS. A consultant will be hired for administration; a part-time supervisor will be hired to train, schedule, & oversee paid & volunteer workers; an aquatic plant survey will be completed with the assistance of UW-Stevens Point.

Activities include:
1. Public landing boat inspections & boater education from Memorial Day weekend to Labor Day weekend and fishing opener weekend.
2. Aquatic plant survey using the Point Intercept Survey method; aquatic macrophyte samples to be sent to a herbarium for identification
3. Construction of an information kiosk at the landing to increase boater awareness of AIS.

Project deliverables include a comprehensive report including:
1) Documentation of donated time & services related to grant administration. 2) AIS related brochures & educational materials 3) Verification of inspector & monitor training including agendas & attendance lists. 4) Watercraft inspection reports including time & number of people reached & CB/CW survey results. 5) Aquatic plant survey report including supporting graphs & maps. 6) Photos of the educational kiosk.

Special conditions: The project sponsor shall immediately contact the DNR in the event of a new AIS infestation.

This scope summarizes the grant application and does not supersede application specifics. Data, records, and reports, must be submitted to the Department in a format specified by the Lake Coordinator. If a consultant is to provide the final report, it is recommended the Grantee provide the Lake Coordinator a draft for comment. DNR will receive both paper and electronic copies of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
St Croix Flowage
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
St Croix Flowage
Status
Complete

Gordon/St. Croix Flowage Association: Gordon/St. Croix Flowage Ais Prevention, Education, & Planning Project: The Gordon/St. Croix Flowage Association is sponsoring a continuing AIS prevention & education project including a boat inspection program at three public boat landings and resorts; training boat monitors; educating public about AIS and prevention; surveys for invasive aquatic plants; conduct a flowage management survey, and a cooperative effort with outside organizations for kiosk support. A consulting firm will be hired to recruit, train, schedule, and oversee paid and volunteer workers.

Deliverables include a paper and electronic copy of final Report including: 1) Final Report summarizing accomplishments of the project including sign construction. 2) Verification of training of inspectors and monitors such as agendas and attendance lists. 3) Watercraft inspection report including time & number of people reached; CB/CW survey results; results will be entered into the CB/CW database. 4) Report on aquatic sampling & shoreline monitoring observations of any detected aquatic invasive species with appropriate maps. 5) Copy of mailings/printed education materials. 6) AIS related materials generated or paid for by this grant.

Special conditions: The project sponsor shall immediately contact the DNR in the event of a new AIS infestation.

This scope summarizes the scope provided in the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide DNR Lake Coordinator with a draft report. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant.


Grant Details
Aquatic Invasives Education
Date
2/15/2016
Waters Involved
St Croix Flowage
Status
Complete

Gordon/St. Croix Flowage Association: St. Croix Flowage Ewm Survey & Treatment Follow-Up: Gordon St. Croix Flowage Association is sponsoring a project to better understand most recent EWM control and plan for a future management strategy.

The Project includes: aquatic plant and AIS monitoring, including evaluating the effectiveness of 2015 management; management planning; volunteer AIS monitoring, including shoreland surveys; and education/outreach, including a Kids on the Flowage event in partnership with local school districts.

Deliverables include: entered data, monitoring results and maps, 2016 and 2017 APM Plans, and education/outreach summary with examples of materials developed.

The specific objectives, metrics, and deliverables for the listed activities are included in the application and supporting materials, and this scope is not intended to replace or supersede those documents. The Department may request quarterly progress reports.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Sucker Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Sunfish Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Sweet Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Swenson Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Tars Creek
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Tars Pond
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Tomahawk Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Totagatic River
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Turtle Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Twin Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Un Spring
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2005
Waters Involved
Unnamed
Status
Complete

Town Of Barnes: Barnes Eurasian Water Milfoil 2005 Project: The Town of Barnes is sponsoring an aquatic invasive species (AIS) project for 2005 to address concerns about Eurasian Water Milfoil (EWM) in two area lakes and the potential for it's spread to other lakes in the area. The project includes 27 lakes in two counties and three townships. 10 of these lakes have public access including one of the infested lakes and the three main lakes in the Eau Claire Chain.

Project objectives include: 1. Watercraft inspection in accordance with the "Clean Boats, Clean Waters" program, on all lakes with public access. 2. A public education and information campaign focused on the threat posed by EWM and what the public can do to prevent its spread.
3. Three (June, July, & August) comprehensive aquatic plant surveys to be done on 27 lakes. Special emphasis will be given to the lakes with public access and the Eau Claire Chain lakes.

A part time seasonal coordinator will be hired to direct volunteer support and facilitate the project. Two seasonal aquatic plant surveyors will be hired to facilitate the aquatic plant surveys on the Eau Claire Chain. Volunteers will be used to conduct all other lake surveys.

A final report shall be completed including: 1. A list of lakes named in the project with and without AIS.
2. Maps showing locations of any known aquatic invasive species. 3. Aquatic plant surveys results.
4. Watercraft inspection summary including total time spent and number of people reached. 5. Preliminary findings associated with the CBCW surveys. 6. Education and informational materials.
7. Photos of boat landing signs at the four public access points. 8. Proposed management plan for future EWM management and control. *In addition, all CBCW program activities will be reported in accordance with CBCW guidelines.

Special conditions for this project: *The project sponsor shall immediately report any potential new EWM infestation to Frank Koshere (715/392-0807) or Dave Blumer (715/635-4078).


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Unnamed
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Unnamed
Status
Complete

Village Of Solon Springs: Ais Control For Evasion Of Watermilfoil: The Village of Solon Springs is sponsoring an AIS project on Upper St. Croix Lake which includes monitoring of boat launches by boat inspectors; educating boaters about AIS & prevention; public education through the use of trained volunteers going door to door informing lakeshore property owners about AIS; placing articles in newsletters & local newspapers; presenting AIS information at local meeting of civic & government groups.

The public boat landing inspection program will run from Memorial Day weekend through Labor Day weekend. A part-time supervisor will be hired to train, schedule, & oversee paid & volunteer workers.

Deliverables include a comprehensive report including: 1) Documentation of donated time & services related to grant administration. 2) Watercraft inspection report including time & number of people reached; CB/lCW survey results; survey results will be entered into a CB/CW database. 3) Copies of newsletters, educational materials, & brochures used at the boat landings or distributed to the public. 6) Agenda & minutes of civic or government meetings where AIS presentations are made. 7) AIS related materials generated or paid for by this grant.

Special conditions: The project sponsor shall immediately contact the DNR in the event of a new AIS infestation.

This scope summarizes the scope provided in the grant application & does not supersede application specifics. Data, records, & reports, including GIS-based maps & digital images, must be submitted to the Department in a format specified by the Lake Coordinator. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment. DNR to receive both paper & electronic copies of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Unnamed
Status
Complete

Upper St Croix Lake Association: Eurasian Watermilfoil Monitoring On Upper St. Croix & Headwaters: The Village of Solon Springs is sponsoring a continuation of their AIS project on Upper St. Croix Lake.

Activities include: 1) Hiring a part-time supervisor to train, schedule, & oversee paid & volunteer workers; 2) Monitoring of boat launches by boat inspectors from Memorial Day weekend through Labor Day weekend.; 3) Educating boaters about AIS & prevention; 4) Public education through use of trained volunteers going door to door informing lakeshore property owners about AIS; 5) Placing articles in newsletters & newspapers; presenting AIS information at local meeting of civic & government groups.

Deliverables include a paper and electronic copy of final report including: 1) Watercraft inspection report including time and number of people reached; CB/CW survey results; results will be entered into the DNR CB/CW database; 2) Copies of newsletters, educational materials, & brochures used at the boat landings or distributed to the public; 3) Agenda & minutes of civic or government meetings where AIS presentations are made; 4) AIS related materials generated or paid for by this grant.

Special conditions for this project: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.

This scope summarizes the scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. If the Grantee is developing the final report a draft report/deliverables should be submitted to the regional Lake Coordinator. DNR to receive both paper and electronic.pdf copies of the final report


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Unnamed
Status
Complete

Upper St Croix Lake Association: Ais Education, Prevention & Monitoring On Upper St. Croix Lake & Headwaters Of St. Croix River: The Upper St. Croix Lake Association is sponsoring an AIS prevention and education project including a Clean Boat/Clean Water inspection program at three public boat landings, lake resident education, education workshop, newsletter & brochure distribution, and periodic monitoring for invasive aquatic plants around Upper St. Croix Lake.

Deliverables include a paper and electronic copy of comprehensive Report including: 1) Final Report summarizing accomplishments of the project including watercraft inspection and lake monitoring reports detailing time and number of people reached; 2) CB/CW survey results; daily results will be entered into the DNR CB/CW database; 3) Verification of lake-resident/public education, workshops, and/or inspector training (agendas and attendance lists); 4) Copies of brochures, educational materials, and mailings; 5) Aquatic plant monitoring results including boat and shoreline observations of any detected aquatic invasive species with maps; 6) Report on Purple Loosestrife control program; 7) AIS related materials generated or paid for by this grant.

Special project conditions: Sponsor shall immediately contact the DNR if a new aquatic invasive species is found.

This scope summarizes the project detail in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. If consultant is to provide final report, it is recommended that Grantee withhold final payment to consultant pending DNR comment on report adequacy.


Grant Details
Aquatic Invasives Education
Date
10/1/2010
Waters Involved
Unnamed
Status
Complete

Upper St Croix Lake Association: Ais Education, Prevention & Monitoring On Upper St. Croix Lk & Headwaters Of St. Croix River: The Upper St. Croix Lake Association is sponsoring an AIS prevention and education project including a Clean Boat/Clean Water inspection program at three public boat landings, lake resident education, education workshop, newsletter & brochure distribution, and periodic monitoring for invasive aquatic plants around Upper St. Croix Lake.

Deliverables include: 1) A summary of accomplishments/progress of the project including watercraft inspection and lake monitoring report detailing total time and number of people reached; 2) CB/CW survey results; daily results must be entered into the DNR CB/CW database; 3) Verification of lake-resident/public education, workshops, and/or inspector training such as agendas and attendance lists; 4) Outreach report including copies of news releases, brochures, educational materials, and mailings. 5) Report on aquatic plant monitoring results including boat and shoreline observations of any detected aquatic invasive species with appropriate maps; 6) Report on Purple Loosestrife control program; 7) AIS related materials generated or paid for by this grant.

Special conditions for this project: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report. If consultant is to provide final report, it is recommended that Grantee provide AIS Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant.


Grant Details
Aquatic Invasives Education
Date
10/1/2013
Waters Involved
Unnamed
Status
Complete

Upper St Croix Lake Association: Ais Education, Prevention & Monitoring Project: Upper St. Croix Lake Association is sponsoring a watercraft inspection, monitoring, and community outreach/education project. Project activities include watercraft inspection at 3 boat landings; AIS monitoring throughout the lake; and a community outreach/education partnership with the local school. The deliverables include all watercraft inspection data entered into SWIMS and a summary of other project activities and any examples of education materials developed.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, reports, and education materials, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional lake coordinator.


Grant Details
Aquatic Invasives Education
Date
2/15/2015
Waters Involved
Unnamed
Status
Complete

Upper St Croix Lake Association: Ais Control & Cbcw Project: Upper St. Croix Lake Association is sponsoring a project to complete CBCW at three landings, AIS education & outreach, and support ongoing purple loosestrife control efforts around the lake. The final deliverables include: all CBCW data entered into SWIMS and a project report summarizing education and outreach, planning and control activities. The specific objectives, metrics, and deliverables for the listed activities are included in the application and supporting materials, and this scope is not intended to replace or supersede those documents


Grant Details
Aquatic Invasives Education
Date
4/1/2005
Waters Involved
Upper Eau Claire Lake
Status
Complete

Town Of Barnes: Barnes Eurasian Water Milfoil 2005 Project: The Town of Barnes is sponsoring an aquatic invasive species (AIS) project for 2005 to address concerns about Eurasian Water Milfoil (EWM) in two area lakes and the potential for it's spread to other lakes in the area. The project includes 27 lakes in two counties and three townships. 10 of these lakes have public access including one of the infested lakes and the three main lakes in the Eau Claire Chain.

Project objectives include: 1. Watercraft inspection in accordance with the "Clean Boats, Clean Waters" program, on all lakes with public access. 2. A public education and information campaign focused on the threat posed by EWM and what the public can do to prevent its spread.
3. Three (June, July, & August) comprehensive aquatic plant surveys to be done on 27 lakes. Special emphasis will be given to the lakes with public access and the Eau Claire Chain lakes.

A part time seasonal coordinator will be hired to direct volunteer support and facilitate the project. Two seasonal aquatic plant surveyors will be hired to facilitate the aquatic plant surveys on the Eau Claire Chain. Volunteers will be used to conduct all other lake surveys.

A final report shall be completed including: 1. A list of lakes named in the project with and without AIS.
2. Maps showing locations of any known aquatic invasive species. 3. Aquatic plant surveys results.
4. Watercraft inspection summary including total time spent and number of people reached. 5. Preliminary findings associated with the CBCW surveys. 6. Education and informational materials.
7. Photos of boat landing signs at the four public access points. 8. Proposed management plan for future EWM management and control. *In addition, all CBCW program activities will be reported in accordance with CBCW guidelines.

Special conditions for this project: *The project sponsor shall immediately report any potential new EWM infestation to Frank Koshere (715/392-0807) or Dave Blumer (715/635-4078).


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Upper Eau Claire Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Upper Ox Creek
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Upper Ox Creek -Un Channel
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Upper Ox Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Upper Saint Croix Lake
Status
Complete

Village Of Solon Springs: Ais Control For Evasion Of Watermilfoil: The Village of Solon Springs is sponsoring an AIS project on Upper St. Croix Lake which includes monitoring of boat launches by boat inspectors; educating boaters about AIS & prevention; public education through the use of trained volunteers going door to door informing lakeshore property owners about AIS; placing articles in newsletters & local newspapers; presenting AIS information at local meeting of civic & government groups.

The public boat landing inspection program will run from Memorial Day weekend through Labor Day weekend. A part-time supervisor will be hired to train, schedule, & oversee paid & volunteer workers.

Deliverables include a comprehensive report including: 1) Documentation of donated time & services related to grant administration. 2) Watercraft inspection report including time & number of people reached; CB/lCW survey results; survey results will be entered into a CB/CW database. 3) Copies of newsletters, educational materials, & brochures used at the boat landings or distributed to the public. 6) Agenda & minutes of civic or government meetings where AIS presentations are made. 7) AIS related materials generated or paid for by this grant.

Special conditions: The project sponsor shall immediately contact the DNR in the event of a new AIS infestation.

This scope summarizes the scope provided in the grant application & does not supersede application specifics. Data, records, & reports, including GIS-based maps & digital images, must be submitted to the Department in a format specified by the Lake Coordinator. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment. DNR to receive both paper & electronic copies of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Upper Saint Croix Lake
Status
Proposed

Friends Of The St Croix Headwaters, Inc.: Pilot Aquatic Macrophyte River & Lake Surveys In The Upper St. Croix Watershed: Friends of the St. Croix Headwaters (FOTSCH) is sponsoring an AIS prevention and education project. Project activities include: 1) Field testing and development of aquatic plant survey protocols. 2) Clean Boat/Clean Water program on Upper St. Croix Lake. 3) Aquatic plant surveys of rivers/streams in watershed and mapping. 4) Public Outreach and Education about AIS. 5) Review of protocol and results at public watershed conference.

Deliverables include a comprehensive report including: 1) Watercraft inspection report including time and number of people reached; CB/CW survey results; daily results will be entered into the DNR CB/CW database; 2) Results of development and field testing of macrophyte protocols for flowing waterbodies; 3) Results of Aquatic Plant Surveys with appropriate maps and Arc View forms including maps of AIS locations; 4) Results of Aquatic Plant Vouchers; 5) Report on outreach projects, workshops, and presentations including copies of press releases, newsletters, and educational materials distributed to the public; 6) Report on review of results from public watershed conference; 7) AIS related materials generated or paid for by this grant.

Special conditions for this project: 1) WDNR\2019s Aquatic Plant Management in Wisconsin guidance should be followed for point-intercept survey monitoring and/or aquatic plant management plan development; 2) The project sponsor shall immediately contact proper DNR authorities in the event in the event of a new aquatic invasive species infestation.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. It is recommended that Grantee provide the AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Upper Saint Croix Lake
Status
Proposed

Upper St Croix Lake Association: Ais Education, Prevention & Monitoring On Upper St. Croix Lake & Headwaters Of St. Croix River: The Upper St. Croix Lake Association is sponsoring an AIS prevention and education project including a Clean Boat/Clean Water inspection program at three public boat landings, lake resident education, education workshop, newsletter & brochure distribution, and periodic monitoring for invasive aquatic plants around Upper St. Croix Lake.

Deliverables include a paper and electronic copy of comprehensive Report including: 1) Final Report summarizing accomplishments of the project including watercraft inspection and lake monitoring reports detailing time and number of people reached; 2) CB/CW survey results; daily results will be entered into the DNR CB/CW database; 3) Verification of lake-resident/public education, workshops, and/or inspector training (agendas and attendance lists); 4) Copies of brochures, educational materials, and mailings; 5) Aquatic plant monitoring results including boat and shoreline observations of any detected aquatic invasive species with maps; 6) Report on Purple Loosestrife control program; 7) AIS related materials generated or paid for by this grant.

Special project conditions: Sponsor shall immediately contact the DNR if a new aquatic invasive species is found.

This scope summarizes the project detail in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. If consultant is to provide final report, it is recommended that Grantee withhold final payment to consultant pending DNR comment on report adequacy.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Upper Saint Croix Lake
Status
Proposed

Upper St Croix Lake Association: Ais Education, Prevention & Monitoring On Upper St. Croix Lk & Headwaters Of St. Croix River: The Upper St. Croix Lake Association is sponsoring an AIS prevention and education project including a Clean Boat/Clean Water inspection program at three public boat landings, lake resident education, education workshop, newsletter & brochure distribution, and periodic monitoring for invasive aquatic plants around Upper St. Croix Lake.

Deliverables include: 1) A summary of accomplishments/progress of the project including watercraft inspection and lake monitoring report detailing total time and number of people reached; 2) CB/CW survey results; daily results must be entered into the DNR CB/CW database; 3) Verification of lake-resident/public education, workshops, and/or inspector training such as agendas and attendance lists; 4) Outreach report including copies of news releases, brochures, educational materials, and mailings. 5) Report on aquatic plant monitoring results including boat and shoreline observations of any detected aquatic invasive species with appropriate maps; 6) Report on Purple Loosestrife control program; 7) AIS related materials generated or paid for by this grant.

Special conditions for this project: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report. If consultant is to provide final report, it is recommended that Grantee provide AIS Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Upper Saint Croix Lake
Status
Proposed

Upper St Croix Lake Association: Eurasian Watermilfoil Monitoring On Upper St. Croix & Headwaters: The Village of Solon Springs is sponsoring a continuation of their AIS project on Upper St. Croix Lake.

Activities include: 1) Hiring a part-time supervisor to train, schedule, & oversee paid & volunteer workers; 2) Monitoring of boat launches by boat inspectors from Memorial Day weekend through Labor Day weekend.; 3) Educating boaters about AIS & prevention; 4) Public education through use of trained volunteers going door to door informing lakeshore property owners about AIS; 5) Placing articles in newsletters & newspapers; presenting AIS information at local meeting of civic & government groups.

Deliverables include a paper and electronic copy of final report including: 1) Watercraft inspection report including time and number of people reached; CB/CW survey results; results will be entered into the DNR CB/CW database; 2) Copies of newsletters, educational materials, & brochures used at the boat landings or distributed to the public; 3) Agenda & minutes of civic or government meetings where AIS presentations are made; 4) AIS related materials generated or paid for by this grant.

Special conditions for this project: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.

This scope summarizes the scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. If the Grantee is developing the final report a draft report/deliverables should be submitted to the regional Lake Coordinator. DNR to receive both paper and electronic.pdf copies of the final report


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Upper Saint Croix Lake
Status
Proposed

Village Of Solon Springs: Ais Control For Evasion Of Watermilfoil: The Village of Solon Springs is sponsoring an AIS project on Upper St. Croix Lake which includes monitoring of boat launches by boat inspectors; educating boaters about AIS & prevention; public education through the use of trained volunteers going door to door informing lakeshore property owners about AIS; placing articles in newsletters & local newspapers; presenting AIS information at local meeting of civic & government groups.

The public boat landing inspection program will run from Memorial Day weekend through Labor Day weekend. A part-time supervisor will be hired to train, schedule, & oversee paid & volunteer workers.

Deliverables include a comprehensive report including: 1) Documentation of donated time & services related to grant administration. 2) Watercraft inspection report including time & number of people reached; CB/lCW survey results; survey results will be entered into a CB/CW database. 3) Copies of newsletters, educational materials, & brochures used at the boat landings or distributed to the public. 6) Agenda & minutes of civic or government meetings where AIS presentations are made. 7) AIS related materials generated or paid for by this grant.

Special conditions: The project sponsor shall immediately contact the DNR in the event of a new AIS infestation.

This scope summarizes the scope provided in the grant application & does not supersede application specifics. Data, records, & reports, including GIS-based maps & digital images, must be submitted to the Department in a format specified by the Lake Coordinator. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment. DNR to receive both paper & electronic copies of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Upper Saint Croix Lake
Status
Complete

Upper St Croix Lake Association: Eurasian Watermilfoil Monitoring On Upper St. Croix & Headwaters: The Village of Solon Springs is sponsoring a continuation of their AIS project on Upper St. Croix Lake.

Activities include: 1) Hiring a part-time supervisor to train, schedule, & oversee paid & volunteer workers; 2) Monitoring of boat launches by boat inspectors from Memorial Day weekend through Labor Day weekend.; 3) Educating boaters about AIS & prevention; 4) Public education through use of trained volunteers going door to door informing lakeshore property owners about AIS; 5) Placing articles in newsletters & newspapers; presenting AIS information at local meeting of civic & government groups.

Deliverables include a paper and electronic copy of final report including: 1) Watercraft inspection report including time and number of people reached; CB/CW survey results; results will be entered into the DNR CB/CW database; 2) Copies of newsletters, educational materials, & brochures used at the boat landings or distributed to the public; 3) Agenda & minutes of civic or government meetings where AIS presentations are made; 4) AIS related materials generated or paid for by this grant.

Special conditions for this project: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.

This scope summarizes the scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. If the Grantee is developing the final report a draft report/deliverables should be submitted to the regional Lake Coordinator. DNR to receive both paper and electronic.pdf copies of the final report


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Upper Saint Croix Lake
Status
Complete

Upper St Croix Lake Association: Ais Education, Prevention & Monitoring On Upper St. Croix Lake & Headwaters Of St. Croix River: The Upper St. Croix Lake Association is sponsoring an AIS prevention and education project including a Clean Boat/Clean Water inspection program at three public boat landings, lake resident education, education workshop, newsletter & brochure distribution, and periodic monitoring for invasive aquatic plants around Upper St. Croix Lake.

Deliverables include a paper and electronic copy of comprehensive Report including: 1) Final Report summarizing accomplishments of the project including watercraft inspection and lake monitoring reports detailing time and number of people reached; 2) CB/CW survey results; daily results will be entered into the DNR CB/CW database; 3) Verification of lake-resident/public education, workshops, and/or inspector training (agendas and attendance lists); 4) Copies of brochures, educational materials, and mailings; 5) Aquatic plant monitoring results including boat and shoreline observations of any detected aquatic invasive species with maps; 6) Report on Purple Loosestrife control program; 7) AIS related materials generated or paid for by this grant.

Special project conditions: Sponsor shall immediately contact the DNR if a new aquatic invasive species is found.

This scope summarizes the project detail in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. If consultant is to provide final report, it is recommended that Grantee withhold final payment to consultant pending DNR comment on report adequacy.


Grant Details
Aquatic Invasives Education
Date
10/1/2010
Waters Involved
Upper Saint Croix Lake
Status
Complete

Upper St Croix Lake Association: Ais Education, Prevention & Monitoring On Upper St. Croix Lk & Headwaters Of St. Croix River: The Upper St. Croix Lake Association is sponsoring an AIS prevention and education project including a Clean Boat/Clean Water inspection program at three public boat landings, lake resident education, education workshop, newsletter & brochure distribution, and periodic monitoring for invasive aquatic plants around Upper St. Croix Lake.

Deliverables include: 1) A summary of accomplishments/progress of the project including watercraft inspection and lake monitoring report detailing total time and number of people reached; 2) CB/CW survey results; daily results must be entered into the DNR CB/CW database; 3) Verification of lake-resident/public education, workshops, and/or inspector training such as agendas and attendance lists; 4) Outreach report including copies of news releases, brochures, educational materials, and mailings. 5) Report on aquatic plant monitoring results including boat and shoreline observations of any detected aquatic invasive species with appropriate maps; 6) Report on Purple Loosestrife control program; 7) AIS related materials generated or paid for by this grant.

Special conditions for this project: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report. If consultant is to provide final report, it is recommended that Grantee provide AIS Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant.


Grant Details
Aquatic Invasives Education
Date
10/1/2011
Waters Involved
Upper Saint Croix Lake
Status
Complete

Upper St Croix Lake Association: Ais Education, Prevention & Monitoring On Upper St. Croix Lk & St. Croix River Headwaters: The Upper St. Croix Lake Association is sponsoring an AIS prevention and education project including a Clean Boat/Clean Water inspection program at three public boat landings, lake resident education, education workshop, newsletter & brochure distribution, and periodic monitoring for invasive aquatic plants around Upper St. Croix Lake.

Deliverables include a comprehensive report with: 1) A summary of accomplishments/progress of the project including watercraft inspection and lake monitoring report detailing total time and number of people reached; 2) CB/CW survey results; daily results will be entered into the DNR CB/CW database; 3) Verification of lake-resident/public education, workshops, and/or inspector training such as agendas and attendance lists; 4) Outreach report including copies of news releases, brochures, educational materials, and mailings; 5) Report on aquatic plant monitoring results including boat and shoreline observations of any detected aquatic invasive species with appropriate maps; 6) Report on Purple Loosestrife control program; 7) AIS related materials generated or paid for by this grant.

Special conditions for this project: The sponsor shall immediately contact the DNR if a new aquatic invasive species is found.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. If consultant is to provide final report, it is recommended that Grantee provide AIS Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
10/1/2012
Waters Involved
Upper Saint Croix Lake
Status
Complete

Upper St Croix Lake Association: Ais Education, Prevention & Monitoring On Up. St. Croix Lk & River Headwaters: The Upper St. Croix Lake Association is sponsoring an AIS prevention and education project including a Clean Boat/Clean Water inspection program at three public boat landings, lake resident education, education workshop, newsletter & brochure distribution, and periodic monitoring for invasive aquatic plants around Upper St. Croix Lake.

Deliverables include: 1) Final Report summarizing accomplishments/progress of the project including watercraft inspection and lake monitoring report detailing total time and number of people reached; 2) Daily CB/CW survey results will be entered into the DNR CB/CW database; 3) Verification of lake-resident/public education, workshops, and/or inspector training such as agendas and attendance lists; 4) Outreach report including agenda from workshops, copies of news releases, brochures, educational materials, and mailings; 5) Report on aquatic plant monitoring results including boat and shoreline observations of any detected aquatic invasive species with appropriate maps; 6) Report on Purple Loosestrife control program;
7) AIS related materials generated or paid for by this grant.

Special project conditions: The project sponsor shall immediately contact the DNR isf a new aquatic invasive species is found.

This scope summarizes details provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake/AIS Coordinator. It is recommended that Grantee provide Lake/AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report


Grant Details
Aquatic Invasives Education
Date
10/1/2012
Waters Involved
Upper Saint Croix Lake
Status
Proposed

Douglas County Lwcd: Implementing Douglas Co. Aquatic Invasive Species Program: Douglas County Land & Water Conservation Department is sponsoring a multi-year countywide AIS project and position to implement its strategic plan. The project will fund the county AIS coordinator and a watercraft inspection coordinator.

Project deliverables include: 1) Countywide watercraft inspection summary, including all data entered into SWIMS; 2) List of posted boat landings with data entered into SWIMS; 3) CLMN and Project RED training summary; 4) Smart prevention monitoring summary, maps, and SWIMS data entry; 5) Upper St. Croix Lake yellow iris rapid response plan and control summary; 6) Purple loosestrife biocontrol program summary, including workshops, equipment support, and beetle raising results; 7) Movement for and possible creation of Illegal-to-Transport county ordinance; 8) Description of expanded monitoring efforts, including partnerships with county departments, DNR, and schools; 9) Information and education meeting and workshop summary and examples of any educational/outreach materials developed; 10) Summary and examples of press releases, newsletter articles, and other media contacts; 11) Summary of grant writing assistance and examples of related products/partnerships.

Special Conditions: The Department may provide standardized methods for AIS monitoring.

This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Education
Date
10/1/2013
Waters Involved
Upper Saint Croix Lake
Status
Complete

Upper St Croix Lake Association: Ais Education, Prevention & Monitoring Project: Upper St. Croix Lake Association is sponsoring a watercraft inspection, monitoring, and community outreach/education project. Project activities include watercraft inspection at 3 boat landings; AIS monitoring throughout the lake; and a community outreach/education partnership with the local school. The deliverables include all watercraft inspection data entered into SWIMS and a summary of other project activities and any examples of education materials developed.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, reports, and education materials, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional lake coordinator.


Grant Details
Aquatic Invasives Education
Date
2/15/2015
Waters Involved
Upper Saint Croix Lake
Status
Complete

Upper St Croix Lake Association: Ais Control & Cbcw Project: Upper St. Croix Lake Association is sponsoring a project to complete CBCW at three landings, AIS education & outreach, and support ongoing purple loosestrife control efforts around the lake. The final deliverables include: all CBCW data entered into SWIMS and a project report summarizing education and outreach, planning and control activities. The specific objectives, metrics, and deliverables for the listed activities are included in the application and supporting materials, and this scope is not intended to replace or supersede those documents


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
West Eightmile Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
West Fork Totagatic River
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Whisky Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Whiteside Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Williamson Creek
Status
Complete

Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.

Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.

Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Research Grant
Date
11/5/2007
Waters Involved
Sand Bar Lake
Status
Complete

Town Of Barnes: Tomahawk & Sand Bar Lakes Ewm Research Project: The Town of Barnes in partnership with the WDNR, US Army Corps of Engineers, and volunteers is sponsoring a multi-year research and demonstration project on Tomahawk and Sand Bar Lakes, Bayfield County focusing on treatment of Eurasian Watermillfoil (EWM). The initial and primary control activity will be large-scale application of 2,4-d herbicide to Tomahawk Lake with Sand Bar Lake serving as a no-treatment reference lake. Follow up management will utilize a suite of best management practices, depending on the EWM and lake conditions. The project includes comprehensive study design with frequent monitoring and a sociological component, including limiting recreational use impacts on the lake(s).

Deliverables include: 1)aquatic plant survey results including spreadsheets, maps, and data summaries (WDNR & USACOE), 2) monitoring records, reports, and maps including watercraft inspection data and volunteer monitoring results (Town, volunteers, and WDNR), 3)information and education products, presentations, and meeting notes (all partners), 4) an Aquatic Plant Management Plan for both lakes (WDNR).

Special Conditions: 1) Sand Bar Lake will be a reference lake with very little to no active management occurring until 2011, 2) WDNR's Aquatic Plant Management in Wisconsin guidance will be followed for point-intercept survey monitoring and aquatic plant management plan development, 3) All Clean Boats Clean Waters data must be collected on forms provided by UW-Extension/DNR and entered into the statewide database for reporting.

This scope summarizes the project scope provided in the application and does not supersede the application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the DNR Lake Coordinator.


Grant Details
Aquatic Invasives Research Grant
Date
11/5/2007
Waters Involved
Tomahawk Lake
Status
Complete

Town Of Barnes: Tomahawk & Sand Bar Lakes Ewm Research Project: The Town of Barnes in partnership with the WDNR, US Army Corps of Engineers, and volunteers is sponsoring a multi-year research and demonstration project on Tomahawk and Sand Bar Lakes, Bayfield County focusing on treatment of Eurasian Watermillfoil (EWM). The initial and primary control activity will be large-scale application of 2,4-d herbicide to Tomahawk Lake with Sand Bar Lake serving as a no-treatment reference lake. Follow up management will utilize a suite of best management practices, depending on the EWM and lake conditions. The project includes comprehensive study design with frequent monitoring and a sociological component, including limiting recreational use impacts on the lake(s).

Deliverables include: 1)aquatic plant survey results including spreadsheets, maps, and data summaries (WDNR & USACOE), 2) monitoring records, reports, and maps including watercraft inspection data and volunteer monitoring results (Town, volunteers, and WDNR), 3)information and education products, presentations, and meeting notes (all partners), 4) an Aquatic Plant Management Plan for both lakes (WDNR).

Special Conditions: 1) Sand Bar Lake will be a reference lake with very little to no active management occurring until 2011, 2) WDNR's Aquatic Plant Management in Wisconsin guidance will be followed for point-intercept survey monitoring and aquatic plant management plan development, 3) All Clean Boats Clean Waters data must be collected on forms provided by UW-Extension/DNR and entered into the statewide database for reporting.

This scope summarizes the project scope provided in the application and does not supersede the application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the DNR Lake Coordinator.


Grant Details
Clean Boats, Clean Waters
Date
4/1/2013
Waters Involved
Beauregard Lake
Status
Complete

Town Of Barnes: Upper, Middle And Lower Eau Claire, Robinson And Island Clean Boats Clean Waters Project 2014: Town of Barnes will sponsor a Clean Boats Clean Water landing inspection program at 5 public landings in 2014.


Grant Details
Clean Boats, Clean Waters
Date
4/1/2013
Waters Involved
Eau Claire River
Status
Proposed

Town Of Barnes: Upper, Middle And Lower Eau Claire, Robinson And Island Clean Boats Clean Waters Project 2014: Town of Barnes will sponsor a Clean Boats Clean Water landing inspection program at 5 public landings in 2014.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Eau Claire River
Status
Complete

Town Of Barnes: Town Of Barnes 2015 Clean Boats Clean Waters Project: The Town of Barnes is sponsoring a 2015 Clean Boats Clean Waters project in the town which includes Upper, Middle, Lower Eau Claire Lakes, Robinson and Island Lakes and 5 public landings.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Eau Claire River
Status
Complete

Town Of Barnes: Town Of Barnes 2016 Clean Boats Clean Waters: The Town of Barnes is sponsoring a Clean Boats Clean Waters project in 2016 at five public boat landing on Upper Eau Claire, Middle Eau Claire, Lower Eau Claire, Robinson, and Island Lake.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Eau Claire River
Status
Complete

Town Of Barnes: Barnes 2017 Upper, Middle, Lower Eau Clarie, Robinson, Island/Tomahawk Lks Cbcw: Barnes is sponsoring a Clean Boats Clean Waters project in 2017 at 4 single public boat landings and 1 public boat landing pairs on UPPER EAU CLAIRE, MIDDLE EAU CLAIRE, LOWER EAU CLAIRE, ROBINSON, ISLAND/TOMAHAWK.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2019
Waters Involved
Eau Claire River
Status
Complete

Town Of Barnes: Barnes 2019 Cbcw: Barnes is sponsoring a Clean Boats Clean Waters project in 2019 at 5 single public boat landings and 0 public boat landing pairs on UPPER EAU CLAIRE (PENINSULA RD), MIDDLE EAU CLAIRE(STATE HWY 27), LOWER EAU CLAIRE (FOWLERS CIRCLE), ROBINSON (ROBINSON LK RD), TOMAHAWK (PARK RD).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Eau Claire River
Status
Complete

Town Of Barnes: Town Of Barnes 2020 Cbcw: Barnes is sponsoring a Clean Boats Clean Waters project in 2020 at 5 single public boat landings and 0 public boat landing pairs on UPPER EAU CLAIRE (UEC LANDING, N/A), MIDDLE EAU CLAIRE(MEC LANDING, N/A), LOWER EAU CLAIRE (LEC LANDING, N/A), TOMAHAWK LAKE (TOMAHAWK PARK, N/A), ROBINSON LAKE (ROBINSON LANDING, N/A).


Grant Details
Clean Boats, Clean Waters
Date
4/1/2013
Waters Involved
George Lake
Status
Proposed

Town Of Barnes: Upper, Middle And Lower Eau Claire, Robinson And Island Clean Boats Clean Waters Project 2014: Town of Barnes will sponsor a Clean Boats Clean Water landing inspection program at 5 public landings in 2014.


Grant Details
Clean Boats, Clean Waters
Date
4/1/2013
Waters Involved
Island Lake
Status
Proposed

Town Of Barnes: Upper, Middle And Lower Eau Claire, Robinson And Island Clean Boats Clean Waters Project 2014: Town of Barnes will sponsor a Clean Boats Clean Water landing inspection program at 5 public landings in 2014.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Island Lake
Status
Complete

Town Of Barnes: Town Of Barnes 2015 Clean Boats Clean Waters Project: The Town of Barnes is sponsoring a 2015 Clean Boats Clean Waters project in the town which includes Upper, Middle, Lower Eau Claire Lakes, Robinson and Island Lakes and 5 public landings.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Island Lake
Status
Complete

Town Of Barnes: Barnes 2017 Upper, Middle, Lower Eau Clarie, Robinson, Island/Tomahawk Lks Cbcw: Barnes is sponsoring a Clean Boats Clean Waters project in 2017 at 4 single public boat landings and 1 public boat landing pairs on UPPER EAU CLAIRE, MIDDLE EAU CLAIRE, LOWER EAU CLAIRE, ROBINSON, ISLAND/TOMAHAWK.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Lower Eau Claire Lake
Status
Complete

Town Of Barnes: Town Of Barnes 2015 Clean Boats Clean Waters Project: The Town of Barnes is sponsoring a 2015 Clean Boats Clean Waters project in the town which includes Upper, Middle, Lower Eau Claire Lakes, Robinson and Island Lakes and 5 public landings.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Lower Eau Claire Lake
Status
Complete

Town Of Barnes: Barnes 2017 Upper, Middle, Lower Eau Clarie, Robinson, Island/Tomahawk Lks Cbcw: Barnes is sponsoring a Clean Boats Clean Waters project in 2017 at 4 single public boat landings and 1 public boat landing pairs on UPPER EAU CLAIRE, MIDDLE EAU CLAIRE, LOWER EAU CLAIRE, ROBINSON, ISLAND/TOMAHAWK.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Lower Eau Claire Lake
Status
Complete

Town Of Barnes: Town Of Barnes 2020 Cbcw: Barnes is sponsoring a Clean Boats Clean Waters project in 2020 at 5 single public boat landings and 0 public boat landing pairs on UPPER EAU CLAIRE (UEC LANDING, N/A), MIDDLE EAU CLAIRE(MEC LANDING, N/A), LOWER EAU CLAIRE (LEC LANDING, N/A), TOMAHAWK LAKE (TOMAHAWK PARK, N/A), ROBINSON LAKE (ROBINSON LANDING, N/A).


Grant Details
Clean Boats, Clean Waters
Date
4/1/2013
Waters Involved
Middle Eau Claire Lake
Status
Proposed

Town Of Barnes: Upper, Middle And Lower Eau Claire, Robinson And Island Clean Boats Clean Waters Project 2014: Town of Barnes will sponsor a Clean Boats Clean Water landing inspection program at 5 public landings in 2014.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Middle Eau Claire Lake
Status
Complete

Town Of Barnes: Town Of Barnes 2015 Clean Boats Clean Waters Project: The Town of Barnes is sponsoring a 2015 Clean Boats Clean Waters project in the town which includes Upper, Middle, Lower Eau Claire Lakes, Robinson and Island Lakes and 5 public landings.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Middle Eau Claire Lake
Status
Complete

Town Of Barnes: Town Of Barnes 2016 Clean Boats Clean Waters: The Town of Barnes is sponsoring a Clean Boats Clean Waters project in 2016 at five public boat landing on Upper Eau Claire, Middle Eau Claire, Lower Eau Claire, Robinson, and Island Lake.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Middle Eau Claire Lake
Status
Complete

Town Of Barnes: Barnes 2017 Upper, Middle, Lower Eau Clarie, Robinson, Island/Tomahawk Lks Cbcw: Barnes is sponsoring a Clean Boats Clean Waters project in 2017 at 4 single public boat landings and 1 public boat landing pairs on UPPER EAU CLAIRE, MIDDLE EAU CLAIRE, LOWER EAU CLAIRE, ROBINSON, ISLAND/TOMAHAWK.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Middle Eau Claire Lake
Status
Complete

Town Of Barnes: Town Of Barnes 2020 Cbcw: Barnes is sponsoring a Clean Boats Clean Waters project in 2020 at 5 single public boat landings and 0 public boat landing pairs on UPPER EAU CLAIRE (UEC LANDING, N/A), MIDDLE EAU CLAIRE(MEC LANDING, N/A), LOWER EAU CLAIRE (LEC LANDING, N/A), TOMAHAWK LAKE (TOMAHAWK PARK, N/A), ROBINSON LAKE (ROBINSON LANDING, N/A).


Grant Details
Clean Boats, Clean Waters
Date
4/1/2013
Waters Involved
Mulligan Creek
Status
Proposed

Town Of Barnes: Upper, Middle And Lower Eau Claire, Robinson And Island Clean Boats Clean Waters Project 2014: Town of Barnes will sponsor a Clean Boats Clean Water landing inspection program at 5 public landings in 2014.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Mulligan Creek
Status
Complete

Town Of Barnes: Town Of Barnes 2015 Clean Boats Clean Waters Project: The Town of Barnes is sponsoring a 2015 Clean Boats Clean Waters project in the town which includes Upper, Middle, Lower Eau Claire Lakes, Robinson and Island Lakes and 5 public landings.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Mulligan Creek
Status
Complete

Town Of Barnes: Barnes 2017 Upper, Middle, Lower Eau Clarie, Robinson, Island/Tomahawk Lks Cbcw: Barnes is sponsoring a Clean Boats Clean Waters project in 2017 at 4 single public boat landings and 1 public boat landing pairs on UPPER EAU CLAIRE, MIDDLE EAU CLAIRE, LOWER EAU CLAIRE, ROBINSON, ISLAND/TOMAHAWK.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2019
Waters Involved
Mulligan Creek
Status
Complete

Town Of Barnes: Barnes 2019 Cbcw: Barnes is sponsoring a Clean Boats Clean Waters project in 2019 at 5 single public boat landings and 0 public boat landing pairs on UPPER EAU CLAIRE (PENINSULA RD), MIDDLE EAU CLAIRE(STATE HWY 27), LOWER EAU CLAIRE (FOWLERS CIRCLE), ROBINSON (ROBINSON LK RD), TOMAHAWK (PARK RD).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Mulligan Creek
Status
Complete

Town Of Barnes: Town Of Barnes 2020 Cbcw: Barnes is sponsoring a Clean Boats Clean Waters project in 2020 at 5 single public boat landings and 0 public boat landing pairs on UPPER EAU CLAIRE (UEC LANDING, N/A), MIDDLE EAU CLAIRE(MEC LANDING, N/A), LOWER EAU CLAIRE (LEC LANDING, N/A), TOMAHAWK LAKE (TOMAHAWK PARK, N/A), ROBINSON LAKE (ROBINSON LANDING, N/A).


Grant Details
Clean Boats, Clean Waters
Date
4/1/2013
Waters Involved
Pickerel Lake
Status
Proposed

Town Of Barnes: Upper, Middle And Lower Eau Claire, Robinson And Island Clean Boats Clean Waters Project 2014: Town of Barnes will sponsor a Clean Boats Clean Water landing inspection program at 5 public landings in 2014.


Grant Details
Clean Boats, Clean Waters
Date
4/1/2013
Waters Involved
Robinson Lake
Status
Proposed

Town Of Barnes: Upper, Middle And Lower Eau Claire, Robinson And Island Clean Boats Clean Waters Project 2014: Town of Barnes will sponsor a Clean Boats Clean Water landing inspection program at 5 public landings in 2014.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Robinson Lake
Status
Complete

Town Of Barnes: Town Of Barnes 2015 Clean Boats Clean Waters Project: The Town of Barnes is sponsoring a 2015 Clean Boats Clean Waters project in the town which includes Upper, Middle, Lower Eau Claire Lakes, Robinson and Island Lakes and 5 public landings.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Robinson Lake
Status
Complete

Town Of Barnes: Barnes 2017 Upper, Middle, Lower Eau Clarie, Robinson, Island/Tomahawk Lks Cbcw: Barnes is sponsoring a Clean Boats Clean Waters project in 2017 at 4 single public boat landings and 1 public boat landing pairs on UPPER EAU CLAIRE, MIDDLE EAU CLAIRE, LOWER EAU CLAIRE, ROBINSON, ISLAND/TOMAHAWK.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Robinson Lake
Status
Complete

Town Of Barnes: Town Of Barnes 2020 Cbcw: Barnes is sponsoring a Clean Boats Clean Waters project in 2020 at 5 single public boat landings and 0 public boat landing pairs on UPPER EAU CLAIRE (UEC LANDING, N/A), MIDDLE EAU CLAIRE(MEC LANDING, N/A), LOWER EAU CLAIRE (LEC LANDING, N/A), TOMAHAWK LAKE (TOMAHAWK PARK, N/A), ROBINSON LAKE (ROBINSON LANDING, N/A).


Grant Details
Clean Boats, Clean Waters
Date
4/1/2014
Waters Involved
Saint Croix River
Status
Complete

Gordon/St. Croix Flowage Association: St Croix Flowage Clean Boats Clean Waters Project 2014: Gordon/St Croix Flowage Association will sponsor a Clean Boats Clean Waters landing inspection program at 2 public accesses in 2014.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Saint Croix River
Status
Complete

Gordon/St. Croix Flowage Association: St. Croix Flowage 2015 Clean Boats Clean Waters Project: The Gordon/St. Croix Flowage Association is sponsoring a 2015 Clean Boats Clean Waters project at two public landings on the St. Croix Flowage.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Saint Croix River
Status
Complete

Gordon/St. Croix Flowage Association: Gordon/St. Croix Flowage Association 2016 Clean Boats Clean Water: The Gordon/St. Croix Flowage Association is sponsoring a Clean Boats Clean Waters project in 2016 at two public boat landing on Gordon/St. Croix Flowage.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Saint Croix River
Status
Complete

Upper St Croix Lake Association: Upper St Croix Lk 2016 Cbcw Project: The Upper St. Croix Lake Association is sponsoring a 2016 CBCW project including 3 public launches.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2018
Waters Involved
Saint Croix River
Status
Complete

Upper St Croix Lake Association: Upper St Croix Lake Association 2018 Cbcw: Upper St Croix Lake Association is sponsoring a Clean Boats Clean Waters project in 2018 at 3 single public boat landings and 0 public boat landing pairs on UPPER STCROIX LAKE


Grant Details
Clean Boats, Clean Waters
Date
2/15/2019
Waters Involved
Saint Croix River
Status
Complete

Gordon/St. Croix Flowage Association: Gordon/St. Croix Flowage Association 2019 Cbcw: Gordon/St. Croix Flowage Association is sponsoring a Clean Boats Clean Waters project in 2019 at 0 single public boat landings and 1 public boat landing pairs on ST. CROIX FLOWAGE (NORTH, DAM).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2019
Waters Involved
Saint Croix River
Status
Complete

Upper St Croix Lake Association: Upper St Croix Lake Association 2019 Cbcw: Upper St Croix Lake Association is sponsoring a Clean Boats Clean Waters project in 2019 at 3 single public boat landings and 0 public boat landing pairs on UPPER ST CROIX LAK (PALMER'S LANDING, N/A), UPPER ST CROIX LAK(MAIN ST (INN), N/A), UPPER ST CROIX LAK (LAKE VIEW LODGE, N/A).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Saint Croix River
Status
Complete

Upper St Croix Lake Association: Upper St. Croix Lake Association 2020 Cbcw: Upper St. Croix Lake Association is sponsoring a Clean Boats Clean Waters project in 2020 at 3 single public boat landings and 0 public boat landing pairs on UPPER ST. CROIX LAK (PALMER'S LANDING), UPPER ST. CROIX LAK(LAKEVIEW LODGE), UPPER ST. CROIX LAK (MAIN STREET (INN)).


Grant Details
Clean Boats, Clean Waters
Date
4/1/2014
Waters Involved
St Croix Flowage
Status
Complete

Gordon/St. Croix Flowage Association: St Croix Flowage Clean Boats Clean Waters Project 2014: Gordon/St Croix Flowage Association will sponsor a Clean Boats Clean Waters landing inspection program at 2 public accesses in 2014.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
St Croix Flowage
Status
Complete

Gordon/St. Croix Flowage Association: St. Croix Flowage 2015 Clean Boats Clean Waters Project: The Gordon/St. Croix Flowage Association is sponsoring a 2015 Clean Boats Clean Waters project at two public landings on the St. Croix Flowage.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
St Croix Flowage
Status
Complete

Gordon/St. Croix Flowage Association: Gordon/St. Croix Flowage Association 2016 Clean Boats Clean Water: The Gordon/St. Croix Flowage Association is sponsoring a Clean Boats Clean Waters project in 2016 at two public boat landing on Gordon/St. Croix Flowage.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2019
Waters Involved
St Croix Flowage
Status
Complete

Gordon/St. Croix Flowage Association: Gordon/St. Croix Flowage Association 2019 Cbcw: Gordon/St. Croix Flowage Association is sponsoring a Clean Boats Clean Waters project in 2019 at 0 single public boat landings and 1 public boat landing pairs on ST. CROIX FLOWAGE (NORTH, DAM).


Grant Details
Clean Boats, Clean Waters
Date
4/1/2013
Waters Involved
Tomahawk Lake
Status
Proposed

Town Of Barnes: Upper, Middle And Lower Eau Claire, Robinson And Island Clean Boats Clean Waters Project 2014: Town of Barnes will sponsor a Clean Boats Clean Water landing inspection program at 5 public landings in 2014.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Tomahawk Lake
Status
Complete

Town Of Barnes: Barnes 2017 Upper, Middle, Lower Eau Clarie, Robinson, Island/Tomahawk Lks Cbcw: Barnes is sponsoring a Clean Boats Clean Waters project in 2017 at 4 single public boat landings and 1 public boat landing pairs on UPPER EAU CLAIRE, MIDDLE EAU CLAIRE, LOWER EAU CLAIRE, ROBINSON, ISLAND/TOMAHAWK.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Tomahawk Lake
Status
Complete

Town Of Barnes: Town Of Barnes 2020 Cbcw: Barnes is sponsoring a Clean Boats Clean Waters project in 2020 at 5 single public boat landings and 0 public boat landing pairs on UPPER EAU CLAIRE (UEC LANDING, N/A), MIDDLE EAU CLAIRE(MEC LANDING, N/A), LOWER EAU CLAIRE (LEC LANDING, N/A), TOMAHAWK LAKE (TOMAHAWK PARK, N/A), ROBINSON LAKE (ROBINSON LANDING, N/A).


Grant Details
Clean Boats, Clean Waters
Date
4/1/2013
Waters Involved
Unnamed
Status
Proposed

Town Of Barnes: Upper, Middle And Lower Eau Claire, Robinson And Island Clean Boats Clean Waters Project 2014: Town of Barnes will sponsor a Clean Boats Clean Water landing inspection program at 5 public landings in 2014.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Unnamed
Status
Complete

Town Of Barnes: Town Of Barnes 2015 Clean Boats Clean Waters Project: The Town of Barnes is sponsoring a 2015 Clean Boats Clean Waters project in the town which includes Upper, Middle, Lower Eau Claire Lakes, Robinson and Island Lakes and 5 public landings.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Unnamed
Status
Complete

Town Of Barnes: Town Of Barnes 2016 Clean Boats Clean Waters: The Town of Barnes is sponsoring a Clean Boats Clean Waters project in 2016 at five public boat landing on Upper Eau Claire, Middle Eau Claire, Lower Eau Claire, Robinson, and Island Lake.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Unnamed
Status
Complete

Upper St Croix Lake Association: Upper St Croix Lk 2016 Cbcw Project: The Upper St. Croix Lake Association is sponsoring a 2016 CBCW project including 3 public launches.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Unnamed
Status
Complete

Town Of Barnes: Barnes 2017 Upper, Middle, Lower Eau Clarie, Robinson, Island/Tomahawk Lks Cbcw: Barnes is sponsoring a Clean Boats Clean Waters project in 2017 at 4 single public boat landings and 1 public boat landing pairs on UPPER EAU CLAIRE, MIDDLE EAU CLAIRE, LOWER EAU CLAIRE, ROBINSON, ISLAND/TOMAHAWK.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2018
Waters Involved
Unnamed
Status
Complete

Upper St Croix Lake Association: Upper St Croix Lake Association 2018 Cbcw: Upper St Croix Lake Association is sponsoring a Clean Boats Clean Waters project in 2018 at 3 single public boat landings and 0 public boat landing pairs on UPPER STCROIX LAKE


Grant Details
Clean Boats, Clean Waters
Date
2/15/2019
Waters Involved
Unnamed
Status
Complete

Town Of Barnes: Barnes 2019 Cbcw: Barnes is sponsoring a Clean Boats Clean Waters project in 2019 at 5 single public boat landings and 0 public boat landing pairs on UPPER EAU CLAIRE (PENINSULA RD), MIDDLE EAU CLAIRE(STATE HWY 27), LOWER EAU CLAIRE (FOWLERS CIRCLE), ROBINSON (ROBINSON LK RD), TOMAHAWK (PARK RD).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2019
Waters Involved
Unnamed
Status
Complete

Upper St Croix Lake Association: Upper St Croix Lake Association 2019 Cbcw: Upper St Croix Lake Association is sponsoring a Clean Boats Clean Waters project in 2019 at 3 single public boat landings and 0 public boat landing pairs on UPPER ST CROIX LAK (PALMER'S LANDING, N/A), UPPER ST CROIX LAK(MAIN ST (INN), N/A), UPPER ST CROIX LAK (LAKE VIEW LODGE, N/A).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Unnamed
Status
Complete

Town Of Barnes: Town Of Barnes 2020 Cbcw: Barnes is sponsoring a Clean Boats Clean Waters project in 2020 at 5 single public boat landings and 0 public boat landing pairs on UPPER EAU CLAIRE (UEC LANDING, N/A), MIDDLE EAU CLAIRE(MEC LANDING, N/A), LOWER EAU CLAIRE (LEC LANDING, N/A), TOMAHAWK LAKE (TOMAHAWK PARK, N/A), ROBINSON LAKE (ROBINSON LANDING, N/A).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Unnamed
Status
Complete

Upper St Croix Lake Association: Upper St. Croix Lake Association 2020 Cbcw: Upper St. Croix Lake Association is sponsoring a Clean Boats Clean Waters project in 2020 at 3 single public boat landings and 0 public boat landing pairs on UPPER ST. CROIX LAK (PALMER'S LANDING), UPPER ST. CROIX LAK(LAKEVIEW LODGE), UPPER ST. CROIX LAK (MAIN STREET (INN)).


Grant Details
Clean Boats, Clean Waters
Date
4/1/2013
Waters Involved
Upper Eau Claire Lake
Status
Proposed

Town Of Barnes: Upper, Middle And Lower Eau Claire, Robinson And Island Clean Boats Clean Waters Project 2014: Town of Barnes will sponsor a Clean Boats Clean Water landing inspection program at 5 public landings in 2014.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Upper Eau Claire Lake
Status
Complete

Town Of Barnes: Town Of Barnes 2015 Clean Boats Clean Waters Project: The Town of Barnes is sponsoring a 2015 Clean Boats Clean Waters project in the town which includes Upper, Middle, Lower Eau Claire Lakes, Robinson and Island Lakes and 5 public landings.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Upper Eau Claire Lake
Status
Complete

Town Of Barnes: Barnes 2017 Upper, Middle, Lower Eau Clarie, Robinson, Island/Tomahawk Lks Cbcw: Barnes is sponsoring a Clean Boats Clean Waters project in 2017 at 4 single public boat landings and 1 public boat landing pairs on UPPER EAU CLAIRE, MIDDLE EAU CLAIRE, LOWER EAU CLAIRE, ROBINSON, ISLAND/TOMAHAWK.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2019
Waters Involved
Upper Eau Claire Lake
Status
Complete

Town Of Barnes: Barnes 2019 Cbcw: Barnes is sponsoring a Clean Boats Clean Waters project in 2019 at 5 single public boat landings and 0 public boat landing pairs on UPPER EAU CLAIRE (PENINSULA RD), MIDDLE EAU CLAIRE(STATE HWY 27), LOWER EAU CLAIRE (FOWLERS CIRCLE), ROBINSON (ROBINSON LK RD), TOMAHAWK (PARK RD).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Upper Eau Claire Lake
Status
Complete

Town Of Barnes: Town Of Barnes 2020 Cbcw: Barnes is sponsoring a Clean Boats Clean Waters project in 2020 at 5 single public boat landings and 0 public boat landing pairs on UPPER EAU CLAIRE (UEC LANDING, N/A), MIDDLE EAU CLAIRE(MEC LANDING, N/A), LOWER EAU CLAIRE (LEC LANDING, N/A), TOMAHAWK LAKE (TOMAHAWK PARK, N/A), ROBINSON LAKE (ROBINSON LANDING, N/A).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Upper Saint Croix Lake
Status
Complete

Upper St Croix Lake Association: Upper St Croix Lk 2016 Cbcw Project: The Upper St. Croix Lake Association is sponsoring a 2016 CBCW project including 3 public launches.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2018
Waters Involved
Upper Saint Croix Lake
Status
Complete

Upper St Croix Lake Association: Upper St Croix Lake Association 2018 Cbcw: Upper St Croix Lake Association is sponsoring a Clean Boats Clean Waters project in 2018 at 3 single public boat landings and 0 public boat landing pairs on UPPER STCROIX LAKE


Grant Details
Clean Boats, Clean Waters
Date
2/15/2019
Waters Involved
Upper Saint Croix Lake
Status
Complete

Upper St Croix Lake Association: Upper St Croix Lake Association 2019 Cbcw: Upper St Croix Lake Association is sponsoring a Clean Boats Clean Waters project in 2019 at 3 single public boat landings and 0 public boat landing pairs on UPPER ST CROIX LAK (PALMER'S LANDING, N/A), UPPER ST CROIX LAK(MAIN ST (INN), N/A), UPPER ST CROIX LAK (LAKE VIEW LODGE, N/A).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Upper Saint Croix Lake
Status
Complete

Upper St Croix Lake Association: Upper St. Croix Lake Association 2020 Cbcw: Upper St. Croix Lake Association is sponsoring a Clean Boats Clean Waters project in 2020 at 3 single public boat landings and 0 public boat landing pairs on UPPER ST. CROIX LAK (PALMER'S LANDING), UPPER ST. CROIX LAK(LAKEVIEW LODGE), UPPER ST. CROIX LAK (MAIN STREET (INN)).


Grant Details
Lake Protection Grant
Date
7/1/2007
Waters Involved
Bony Lake
Status
Complete

Bayfield County: Res-Bony Lakewide Restoration & Conservation Project: Bayfield County in partnership with ABDI Land & Water Conservation, Sigurd Olson Environmental Institute, and Bony Lake property owners will implement a lake restoration project. More than 50% of the property owners (resulting in over a mile of linear shoreline) expressed a commitment to shoreline restoration, and additional lake protection activities, such as storm water best management practices (e.g. rain gardens), littoral habitat restoration (e.g. tree drops), and shoreline restorations exceeding minimum county and state standards will be strongly encouraged. Multiple partners will collaborate with the following: technical assistance; restoration cost-share assistance; promotion and education; recognition activities; and enrollment payments. The project also includes collecting pre- and post-restoration monitoring data for baseline and future comparison. These data may include bird, amphibian, terrestrial and aquatic plant community information, and a top/bottom paleoecological sediment core. Project leaders will continually promote media coverage and demonstration opportunities for the surrounding community.

All parcels require a department approved deed restriction that permanently establishes the vegetative buffer on the parcel. Restorations must follow standards set forth in NR 191.24(3).

Project deliverables include: a final report listing all project accomplishments including the number of parcels or lots participating in the program; educational materials developed; media coverage; and monitoring results.

A final report in PDF format summarizing the results of the project as well as copies of databases, maps, GIS files, guidebooks, ordinances or any other products resulting from the project shall be provided to the Department for review prior to final payment.


Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Cranberry Creek
Status
Complete

Minong Flowage Association: Hlk-Minong Flowage: Fish-Sticks Dan Maxwell: Minong Flowage Association will implement best practices described in Wisconsin\2019s 2014-2017 Healthy Lakes Implementation Plan. Practices include: fish sticks 1 lakeshore property.

The best practices require a contract to remain in effect for 10 years and must include minimum operation and maintenance requirements and data collection as described in grant condition #17. If best practice(s) are implemented on land owned by the grant Sponsor, this Lake Protection Grant Agreement serves as the contract. If best practice(s) are implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner that abides by grant condition #17 is required.

The Department may require re-payment of project installation costs if the best practice is disturbed or removed. The Sponsor and/or the Department may perform site inspections and/or monitoring to ensure project success.

Deliverables: Best practice location and design information, if not included in the application; signed 10-year landowner contract; pre and post project installation photographs; summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.
Special conditions: The state share of each best practice cannot exceed $1,000. The state share of grant administration and technical assistance costs may not exceed 10% of the grant award; technical assistance does not include implementation labor. Funding cannot be used for mitigation or regulatory compliance activities. Water regulation and/or county zoning permits must be issued before construction. The Healthy Lakes logo should be used for promotion and publicity, and DNR recognized as a funding source.


Grant Details
Lake Protection Grant
Date
3/15/2021
Waters Involved
Eau Claire River
Status
Complete

Barnes/Eau Claire Lakes Area Property Owners: Hlr - Eau Claire Lakes Area Healthy Lakes & Rivers: Partnering with property owners, Property Owners Assoc Inc Barnes EC Lakes Area is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special conditions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.

Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.

Special conditions: Project management and technical assistance cash costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.


Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Lake Nebagamon
Status
Complete

Village Of Lake Nebagamon: Lmi-Stormwater Runoff Boat Landing Lake Nebagamon: The Village of Lake Nebagamon is sponsoring a project to implement engineered stormwater best practices at the lake\2019s public boat landing downtown. The Project also includes community outreach and tours to share the project results.

Deliverables include: construction specs and plans, 25-year operation & maintenance plan with pre/post photos, and an outreach summary.

The specific objectives, metrics, and deliverables for the listed activities are included in the application and supporting materials, and this scope is not intended to replace or supersede those documents.


Grant Details
Lake Protection Grant
Date
3/15/2021
Waters Involved
Lower Eau Claire Lake
Status
Complete

Barnes/Eau Claire Lakes Area Property Owners: Hlr - Eau Claire Lakes Area Healthy Lakes & Rivers: Partnering with property owners, Property Owners Assoc Inc Barnes EC Lakes Area is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special conditions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.

Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.

Special conditions: Project management and technical assistance cash costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.


Grant Details
Lake Protection Grant
Date
3/15/2021
Waters Involved
Middle Eau Claire Lake
Status
Complete

Barnes/Eau Claire Lakes Area Property Owners: Hlr - Eau Claire Lakes Area Healthy Lakes & Rivers: Partnering with property owners, Property Owners Assoc Inc Barnes EC Lakes Area is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special conditions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.

Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.

Special conditions: Project management and technical assistance cash costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.


Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Minnesuing Creek
Status
Complete

Village Of Lake Nebagamon: Lmi-Stormwater Runoff Boat Landing Lake Nebagamon: The Village of Lake Nebagamon is sponsoring a project to implement engineered stormwater best practices at the lake\2019s public boat landing downtown. The Project also includes community outreach and tours to share the project results.

Deliverables include: construction specs and plans, 25-year operation & maintenance plan with pre/post photos, and an outreach summary.

The specific objectives, metrics, and deliverables for the listed activities are included in the application and supporting materials, and this scope is not intended to replace or supersede those documents.


Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Minong Flowage
Status
Complete

Minong Flowage Association: Hlk-Minong Flowage: Fish-Sticks Dan Maxwell: Minong Flowage Association will implement best practices described in Wisconsin\2019s 2014-2017 Healthy Lakes Implementation Plan. Practices include: fish sticks 1 lakeshore property.

The best practices require a contract to remain in effect for 10 years and must include minimum operation and maintenance requirements and data collection as described in grant condition #17. If best practice(s) are implemented on land owned by the grant Sponsor, this Lake Protection Grant Agreement serves as the contract. If best practice(s) are implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner that abides by grant condition #17 is required.

The Department may require re-payment of project installation costs if the best practice is disturbed or removed. The Sponsor and/or the Department may perform site inspections and/or monitoring to ensure project success.

Deliverables: Best practice location and design information, if not included in the application; signed 10-year landowner contract; pre and post project installation photographs; summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.
Special conditions: The state share of each best practice cannot exceed $1,000. The state share of grant administration and technical assistance costs may not exceed 10% of the grant award; technical assistance does not include implementation labor. Funding cannot be used for mitigation or regulatory compliance activities. Water regulation and/or county zoning permits must be issued before construction. The Healthy Lakes logo should be used for promotion and publicity, and DNR recognized as a funding source.


Grant Details
Lake Protection Grant
Date
3/15/2021
Waters Involved
Mulligan Creek
Status
Complete

Barnes/Eau Claire Lakes Area Property Owners: Hlr - Eau Claire Lakes Area Healthy Lakes & Rivers: Partnering with property owners, Property Owners Assoc Inc Barnes EC Lakes Area is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special conditions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.

Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.

Special conditions: Project management and technical assistance cash costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.


Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Nebagamon Creek
Status
Complete

Village Of Lake Nebagamon: Lmi-Stormwater Runoff Boat Landing Lake Nebagamon: The Village of Lake Nebagamon is sponsoring a project to implement engineered stormwater best practices at the lake\2019s public boat landing downtown. The Project also includes community outreach and tours to share the project results.

Deliverables include: construction specs and plans, 25-year operation & maintenance plan with pre/post photos, and an outreach summary.

The specific objectives, metrics, and deliverables for the listed activities are included in the application and supporting materials, and this scope is not intended to replace or supersede those documents.


Grant Details
Lake Protection Grant
Date
11/27/1996
Waters Involved
St Croix Flowage
Status
Complete

Douglas County: Acq-Upper St Croix Flowage Land Acquisition-Bell Trust/Wilcox Is: Douglas County will acquire approximately 128 acres (six parcels) of land located on the Gordon/St. Croix Flowage to protect the headwaters of the St. Croix Scenic Riverway. The properties include primarily wooded acreage located along both the southern shore of the flowage and Wilcox Island along the northern shore. A legal description of the parcels is attached. The property will be managed by the County Forestry Department as either special use areas to preserve and protect the water quality and wildlife habitat of the flowage or as county forest lands. The primary goals of the property's management plan are 1) to preserve and protect the water quality of the flowage and the high quality fishery and wildlife habitat, rich in both aquatic and terrestial bio-diversity 2) to protect the southern shoreline of the flowage from further development, and 3) to protect and maintain as a unique benchmark stand the old growth red and white pine stand on Wilcox Island. The property will be open for public access and use but intensive access or recreational provisions are not planned.


Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Totagatic River
Status
Complete

Minong Flowage Association: Hlk-Minong Flowage: Fish-Sticks Dan Maxwell: Minong Flowage Association will implement best practices described in Wisconsin\2019s 2014-2017 Healthy Lakes Implementation Plan. Practices include: fish sticks 1 lakeshore property.

The best practices require a contract to remain in effect for 10 years and must include minimum operation and maintenance requirements and data collection as described in grant condition #17. If best practice(s) are implemented on land owned by the grant Sponsor, this Lake Protection Grant Agreement serves as the contract. If best practice(s) are implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner that abides by grant condition #17 is required.

The Department may require re-payment of project installation costs if the best practice is disturbed or removed. The Sponsor and/or the Department may perform site inspections and/or monitoring to ensure project success.

Deliverables: Best practice location and design information, if not included in the application; signed 10-year landowner contract; pre and post project installation photographs; summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.
Special conditions: The state share of each best practice cannot exceed $1,000. The state share of grant administration and technical assistance costs may not exceed 10% of the grant award; technical assistance does not include implementation labor. Funding cannot be used for mitigation or regulatory compliance activities. Water regulation and/or county zoning permits must be issued before construction. The Healthy Lakes logo should be used for promotion and publicity, and DNR recognized as a funding source.


Grant Details
Lake Protection Grant
Date
7/1/2007
Waters Involved
Unnamed
Status
Complete

Bayfield County: Res-Bony Lakewide Restoration & Conservation Project: Bayfield County in partnership with ABDI Land & Water Conservation, Sigurd Olson Environmental Institute, and Bony Lake property owners will implement a lake restoration project. More than 50% of the property owners (resulting in over a mile of linear shoreline) expressed a commitment to shoreline restoration, and additional lake protection activities, such as storm water best management practices (e.g. rain gardens), littoral habitat restoration (e.g. tree drops), and shoreline restorations exceeding minimum county and state standards will be strongly encouraged. Multiple partners will collaborate with the following: technical assistance; restoration cost-share assistance; promotion and education; recognition activities; and enrollment payments. The project also includes collecting pre- and post-restoration monitoring data for baseline and future comparison. These data may include bird, amphibian, terrestrial and aquatic plant community information, and a top/bottom paleoecological sediment core. Project leaders will continually promote media coverage and demonstration opportunities for the surrounding community.

All parcels require a department approved deed restriction that permanently establishes the vegetative buffer on the parcel. Restorations must follow standards set forth in NR 191.24(3).

Project deliverables include: a final report listing all project accomplishments including the number of parcels or lots participating in the program; educational materials developed; media coverage; and monitoring results.

A final report in PDF format summarizing the results of the project as well as copies of databases, maps, GIS files, guidebooks, ordinances or any other products resulting from the project shall be provided to the Department for review prior to final payment.


Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Unnamed
Status
Complete

Village Of Lake Nebagamon: Lmi-Stormwater Runoff Boat Landing Lake Nebagamon: The Village of Lake Nebagamon is sponsoring a project to implement engineered stormwater best practices at the lake\2019s public boat landing downtown. The Project also includes community outreach and tours to share the project results.

Deliverables include: construction specs and plans, 25-year operation & maintenance plan with pre/post photos, and an outreach summary.

The specific objectives, metrics, and deliverables for the listed activities are included in the application and supporting materials, and this scope is not intended to replace or supersede those documents.


Grant Details
Lake Protection Grant
Date
3/15/2021
Waters Involved
Unnamed
Status
Complete

Barnes/Eau Claire Lakes Area Property Owners: Hlr - Eau Claire Lakes Area Healthy Lakes & Rivers: Partnering with property owners, Property Owners Assoc Inc Barnes EC Lakes Area is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special conditions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.

Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.

Special conditions: Project management and technical assistance cash costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.


Grant Details
Lake Protection Grant
Date
3/15/2021
Waters Involved
Upper Eau Claire Lake
Status
Complete

Barnes/Eau Claire Lakes Area Property Owners: Hlr - Eau Claire Lakes Area Healthy Lakes & Rivers: Partnering with property owners, Property Owners Assoc Inc Barnes EC Lakes Area is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special conditions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.

Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.

Special conditions: Project management and technical assistance cash costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Whitefish Lake
Status
Complete

Whitefish Lake Conservation Organization, In: Lmi-Whitefish Lake Diagnostic & Feasibility Study: The Whitefish Lake Conservation Organization, in cooperation with the US Geological Survey, Wis. Dept. of Nat. Res., and private consultants, will conduct a comprehensive diagnostic/feasibility study of Silver Lake and it's watershed and develop a lake management plan.

The project includes the following activities; (1) the USGS will conduct an assessment of the lake's hydrology and water quality and model lake responses to management scenarios, (2) the DNR [Integ. Sci. Serv.] will conduct a lake bottom sediment core study to determine historical conditions and changes in lake water quality over time, (3) consultant Susan Cray Borman will conduct an aquatic plant survey and develop management recommendations, and (4) consultant Eric Olson will coordinate and compile the results of these studies into planning reports and action plans as well as provide for project public communication, input (through surveys and working groups) and education.

Project deliverables include: l. Detailed hydrologic and nutrient budgets, including simulations of alternative development scenarios in a published technical report. 2. Detailed aquatic plant survey and report. 3. A lake core paleoecological study and report. 4. Two interim planning reports synthesizing and summarizing the findings of the other studies, and 5. A comprehensive lake management plan for Whitefish Lake.

Specific conditions for this project include: The installation of all stream and lake gauging stations must receive the approval and/or permit from the Department of Natural Resources water regulation section.

The Department of Natural Resources will be provided with electronic and paper copies of the annual and final reports of the results of this study and the lake management plan. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Whitefish Lake
Status
Complete

West Wisconsin Land Trust: Acq-Whitefish Lake - Griggs Shore: West Wisconsin Land Trust will sponsor a project to acquire a conservation easement on 37 acres including approximately 1/2 mile of shoreland on Whitefish Lake and 4,500 feet of shoreline frontage on a large wetland.


Grant Details
Large Scale Lake Planning
Date
3/24/1994
Waters Involved
Amnicon Lake
Status
Complete

Amnicon/Dowling Lake Management District: Amnicon Lake Management Planning: Conduct water quality sampling. Conduct aquatic plant survey of lake. Conduct an aerial photography survey of lake shoreline. Conduct a periphyton survey in lake. Conduct a shoreline conductivity profile survey. The grantee will disseminateinformation to the public by newsletter, local newspaper articles, public meetings and summary report mailings. Project results will be reposited at Trilakes Civic Club, 7872 S. County Rd. A, Superior, WI, 54880.


Grant Details
Large Scale Lake Planning
Date
4/1/1996
Waters Involved
Amnicon Lake
Status
Complete

Amnicon/Dowling Lake Management District: Amnicon Lake Water Quality Monitoring And Assessment: The Amnicon/Dowling Lake Management and Sanitary District proposes to continue the water quality monitoring on Amnicon lake and continue their lake management planning process. Project activities include 1) monitoring lake water quality from April to November, 2) monitoring and evaluating four "Hot Spot" sites for potential harmful runoff during precipitation events, 3) monitoring eight existing shoreline wells to characterize groundwater quality and potential lake impacts, 4) install eight seepage meters around the lake and monitor quality of groundwater entering the lake, 5) evaluate previously identified areas of concern and make recommendations for the implementation of "Best Management Practices" where indicated, and 6) analyze and characterize the lake sediments. A final report will be prepared describing the project results. A paper copy and an electronic copy of the final report will be provided to the Department of Natural Resources. Information on the project will be disseminated to the public by newsletter, public meeting, and summary report mailing.


Grant Details
Large Scale Lake Planning
Date
4/1/1997
Waters Involved
Amnicon Lake
Status
Complete

Amnicon/Dowling Lake Management District: Amnicon Lake Water Quality Monitoring: The Amnicon/Dowling Lake Management & Sanitation District proposes to conduct water quality monitoring on Amnicon Lake, including the purchase of water quality monitoring equipment. Project activities also include providing water quality sampling training to volunteers, providing a groundtruthing review session to volunteers, analyzing groundtruthing results, and preparing a final report. The Department of Natural Resource will be provided with a paper copy and an electronic copy of the final report. Information about the project will be disseminated to the public by newsletter, public meeting, summary report mailings, and local newspaper article.


Grant Details
Large Scale Lake Planning
Date
4/1/2003
Waters Involved
Amnicon Lake
Status
Complete

Amnicon/Dowling Lake Management District: Amnicon Lake Comprehensive Lake Management Plan Development: The Amnicon/Dowling Lake Management & Sanitary District will conduct a comprehensive lake management planning project involving a study and evaluation of Amnicon Lake in Douglas County. Project activities include; conducting a review and research of all available reports, records, maps, etc., conducting a shoreline inventory, conducting a watershed assessment, conducting a surface runoff assessment, conducting lake and stream water quality monitoring, conducting lake bottom sediment monitoring, calculating a lake water budget, preparing a lake nutrient budget, conducting computer modeling of lake water quality data and information, and preparing a final comprehensive lake Management Plan/Report.

Specific deliverables for this grant project include:
? A comprehensive lake management plan for Amnicon Lake including the project activity results.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Bass Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 1: Inventory & Analysis Of Existing Conditions: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) includes the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase I) include:
1. Review and analysis on survey questionnaire data
2. Attendance at and facilitation of 3 (of 7) Plan Commission meetings
3. Coordination of 1 (of 2) public informational workshops
4. Draft and final versions of Inventory and Trends Report
5. Copy of final inventory report map(s)

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Bass Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 2: Recommendations: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) will include the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase II) include:

1. Attendance at and facilitation of 4 (of &) Plan Commission meetings
2. Coordination of 1 (of 2) public informational workshops
3. Coordination and facilitation of the formal public hearing
4. Copy of draft Comprehensive Plan document
5. Copy of final Comprehensive Plan document
6. Copy of final preferred land use map
7. Copies of report maps on facilities, utility services, recreation sites, transportation, and land use

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Basswood Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 1: Inventory & Analysis Of Existing Conditions: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) includes the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase I) include:
1. Review and analysis on survey questionnaire data
2. Attendance at and facilitation of 3 (of 7) Plan Commission meetings
3. Coordination of 1 (of 2) public informational workshops
4. Draft and final versions of Inventory and Trends Report
5. Copy of final inventory report map(s)

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Basswood Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 2: Recommendations: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) will include the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase II) include:

1. Attendance at and facilitation of 4 (of &) Plan Commission meetings
2. Coordination of 1 (of 2) public informational workshops
3. Coordination and facilitation of the formal public hearing
4. Copy of draft Comprehensive Plan document
5. Copy of final Comprehensive Plan document
6. Copy of final preferred land use map
7. Copies of report maps on facilities, utility services, recreation sites, transportation, and land use

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Bear Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 1: Inventory & Analysis Of Existing Conditions: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) includes the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase I) include:
1. Review and analysis on survey questionnaire data
2. Attendance at and facilitation of 3 (of 7) Plan Commission meetings
3. Coordination of 1 (of 2) public informational workshops
4. Draft and final versions of Inventory and Trends Report
5. Copy of final inventory report map(s)

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Bear Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 2: Recommendations: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) will include the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase II) include:

1. Attendance at and facilitation of 4 (of &) Plan Commission meetings
2. Coordination of 1 (of 2) public informational workshops
3. Coordination and facilitation of the formal public hearing
4. Copy of draft Comprehensive Plan document
5. Copy of final Comprehensive Plan document
6. Copy of final preferred land use map
7. Copies of report maps on facilities, utility services, recreation sites, transportation, and land use

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Beaver Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 1: Inventory & Analysis Of Existing Conditions: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) includes the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase I) include:
1. Review and analysis on survey questionnaire data
2. Attendance at and facilitation of 3 (of 7) Plan Commission meetings
3. Coordination of 1 (of 2) public informational workshops
4. Draft and final versions of Inventory and Trends Report
5. Copy of final inventory report map(s)

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Beaver Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 2: Recommendations: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) will include the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase II) include:

1. Attendance at and facilitation of 4 (of &) Plan Commission meetings
2. Coordination of 1 (of 2) public informational workshops
3. Coordination and facilitation of the formal public hearing
4. Copy of draft Comprehensive Plan document
5. Copy of final Comprehensive Plan document
6. Copy of final preferred land use map
7. Copies of report maps on facilities, utility services, recreation sites, transportation, and land use

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2006
Waters Involved
Beebe Creek
Status
Complete

Upper St Croix Lake Association: A Community Approach To Data Collection, Lake Modeling & Strategic Planning, Phase 1: Upper St. Croix Lake Association is sponsoring a four-phase project to develop a community-based lake management plan. This scope covers the first two phases of the project.

Phase 1 includes tributary water quality and flow with loading estimates, as well as climate data collection. Phase 2 includes in-lake physical and chemical data collection, including water chemistry, clarity, and temperature, as well as groundwater flow and quality. In both phases, citizen volunteers will be trained to collect data (e.g. water quality samples and mapping of open-water areas), and a project steering committee will identify education and communication opportunities, coordinate volunteers, and provide project development input. The monitoring data will be used in modeling (Phase 3) to shape science-based management recommendations. These recommendations will be integrated into the (Phase 4) strategic lake management planning.

The Phase 1 and 2 final deliverables will be a summary of monitoring results and education/communication outreach both in report and presentation formats.

Special Condition: Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Large Scale Lake Planning
Date
10/1/2006
Waters Involved
Beebe Creek
Status
Complete

Upper St Croix Lake Association: A Community Approach To Data Collection, Lake Modeling, & Strategic Planning, Phase 2: Upper St. Croix Lake Association is sponsoring a four-phase project to develop a community-based lake management plan. This scope covers the first two phases of the project.

Phase 1 includes tributary water quality and flow with loading estimates, as well as climate data collection. Phase 2 includes in-lake physical and chemical data collection, including water chemistry, clarity, and temperature, as well as groundwater flow and quality. In both phases, citizen volunteers will be trained to collect data (e.g. water quality samples and mapping of open-water areas), and a project steering committee will identify education and communication opportunities, coordinate volunteers, and provide project development input. The monitoring data will be used in modeling (Phase 3) to shape science-based management recommendations. These recommendations will be integrated into the (Phase 4) strategic lake management planning.

The Phase 1 and 2 final deliverables will be a summary of monitoring results and education/communication outreach both in report and presentation formats.

Special Condition: Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Large Scale Lake Planning
Date
4/1/2007
Waters Involved
Beebe Creek
Status
Complete

Upper St Croix Lake Association: Community Approach To Lake Planning, Etc.-#3: Upper St. Croix Lake Association is sponsoring a multi-phase project to develop a community-based lake management plan. This scope covers the precipitation monitoring, internal loading and modeling phase.

Citizen volunteers will be trained to monitor precipitation daily. Twenty sediment cores will be collected and analyzed for sediment phosphorous release under oxic and anoxic conditions to determine sediment SRP release rates. Surface- and groundwater-sheds will be delineated. Water and nutrient budgets will be developed using monitoring data as well as land use, climate, and previous research information. WiLMS will be used to predict in-lake phosphorous concentrations under various management alternatives. This information will be used in the final project strategic planning and management plan development phase.

Final deliverables include: precipitation logs; sediment phosphorous release rates and study summary; modeling results, and watershed delineations.

This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. Grantee or consultant will provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR shall receive both paper and electronic copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
4/1/2007
Waters Involved
Beebe Creek
Status
Complete

Upper St Croix Lake Association: Community Approach To Lake Planning,Etc.-#4: Upper St. Croix Lake Association is sponsoring a multi-phase project to develop a community-based lake management plan. This scope covers an additional year of tributary monitoring that is necessary because of limited runoff monitoring during drought conditions (i.e. at least two years of monitoring are needed with existing climate variability).

This project includes measuring tributary water quality and flow, including event sampling, and developing loading estimates. Citizen volunteers will be trained to collect data (e.g. water quality samples), and a project steering committee will identify education and communication opportunities, coordinate volunteers, and provide project development input. The monitoring data will be used in the modeling and final strategic lake management planning phases.

Final deliverables include: data collection summary, rating curves, and interim lake management report (spring 2008).

This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. Grantee or consultant will provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR shall receive both paper and electronic copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Bell Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 1: Inventory & Analysis Of Existing Conditions: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) includes the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase I) include:
1. Review and analysis on survey questionnaire data
2. Attendance at and facilitation of 3 (of 7) Plan Commission meetings
3. Coordination of 1 (of 2) public informational workshops
4. Draft and final versions of Inventory and Trends Report
5. Copy of final inventory report map(s)

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Bell Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 2: Recommendations: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) will include the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase II) include:

1. Attendance at and facilitation of 4 (of &) Plan Commission meetings
2. Coordination of 1 (of 2) public informational workshops
3. Coordination and facilitation of the formal public hearing
4. Copy of draft Comprehensive Plan document
5. Copy of final Comprehensive Plan document
6. Copy of final preferred land use map
7. Copies of report maps on facilities, utility services, recreation sites, transportation, and land use

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Bellevue Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 1: Inventory & Analysis Of Existing Conditions: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) includes the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase I) include:
1. Review and analysis on survey questionnaire data
2. Attendance at and facilitation of 3 (of 7) Plan Commission meetings
3. Coordination of 1 (of 2) public informational workshops
4. Draft and final versions of Inventory and Trends Report
5. Copy of final inventory report map(s)

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Bellevue Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 2: Recommendations: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) will include the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase II) include:

1. Attendance at and facilitation of 4 (of &) Plan Commission meetings
2. Coordination of 1 (of 2) public informational workshops
3. Coordination and facilitation of the formal public hearing
4. Copy of draft Comprehensive Plan document
5. Copy of final Comprehensive Plan document
6. Copy of final preferred land use map
7. Copies of report maps on facilities, utility services, recreation sites, transportation, and land use

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Bog Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 1: Inventory & Analysis Of Existing Conditions: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) includes the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase I) include:
1. Review and analysis on survey questionnaire data
2. Attendance at and facilitation of 3 (of 7) Plan Commission meetings
3. Coordination of 1 (of 2) public informational workshops
4. Draft and final versions of Inventory and Trends Report
5. Copy of final inventory report map(s)

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Bog Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 2: Recommendations: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) will include the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase II) include:

1. Attendance at and facilitation of 4 (of &) Plan Commission meetings
2. Coordination of 1 (of 2) public informational workshops
3. Coordination and facilitation of the formal public hearing
4. Copy of draft Comprehensive Plan document
5. Copy of final Comprehensive Plan document
6. Copy of final preferred land use map
7. Copies of report maps on facilities, utility services, recreation sites, transportation, and land use

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Broadax Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 1: Inventory & Analysis Of Existing Conditions: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) includes the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase I) include:
1. Review and analysis on survey questionnaire data
2. Attendance at and facilitation of 3 (of 7) Plan Commission meetings
3. Coordination of 1 (of 2) public informational workshops
4. Draft and final versions of Inventory and Trends Report
5. Copy of final inventory report map(s)

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Broadax Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 2: Recommendations: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) will include the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase II) include:

1. Attendance at and facilitation of 4 (of &) Plan Commission meetings
2. Coordination of 1 (of 2) public informational workshops
3. Coordination and facilitation of the formal public hearing
4. Copy of draft Comprehensive Plan document
5. Copy of final Comprehensive Plan document
6. Copy of final preferred land use map
7. Copies of report maps on facilities, utility services, recreation sites, transportation, and land use

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Camp One Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 1: Inventory & Analysis Of Existing Conditions: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) includes the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase I) include:
1. Review and analysis on survey questionnaire data
2. Attendance at and facilitation of 3 (of 7) Plan Commission meetings
3. Coordination of 1 (of 2) public informational workshops
4. Draft and final versions of Inventory and Trends Report
5. Copy of final inventory report map(s)

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Camp One Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 2: Recommendations: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) will include the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase II) include:

1. Attendance at and facilitation of 4 (of &) Plan Commission meetings
2. Coordination of 1 (of 2) public informational workshops
3. Coordination and facilitation of the formal public hearing
4. Copy of draft Comprehensive Plan document
5. Copy of final Comprehensive Plan document
6. Copy of final preferred land use map
7. Copies of report maps on facilities, utility services, recreation sites, transportation, and land use

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Camp Two Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 1: Inventory & Analysis Of Existing Conditions: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) includes the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase I) include:
1. Review and analysis on survey questionnaire data
2. Attendance at and facilitation of 3 (of 7) Plan Commission meetings
3. Coordination of 1 (of 2) public informational workshops
4. Draft and final versions of Inventory and Trends Report
5. Copy of final inventory report map(s)

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Camp Two Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 2: Recommendations: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) will include the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase II) include:

1. Attendance at and facilitation of 4 (of &) Plan Commission meetings
2. Coordination of 1 (of 2) public informational workshops
3. Coordination and facilitation of the formal public hearing
4. Copy of draft Comprehensive Plan document
5. Copy of final Comprehensive Plan document
6. Copy of final preferred land use map
7. Copies of report maps on facilities, utility services, recreation sites, transportation, and land use

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Canthook Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 1: Inventory & Analysis Of Existing Conditions: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) includes the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase I) include:
1. Review and analysis on survey questionnaire data
2. Attendance at and facilitation of 3 (of 7) Plan Commission meetings
3. Coordination of 1 (of 2) public informational workshops
4. Draft and final versions of Inventory and Trends Report
5. Copy of final inventory report map(s)

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Canthook Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 2: Recommendations: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) will include the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase II) include:

1. Attendance at and facilitation of 4 (of &) Plan Commission meetings
2. Coordination of 1 (of 2) public informational workshops
3. Coordination and facilitation of the formal public hearing
4. Copy of draft Comprehensive Plan document
5. Copy of final Comprehensive Plan document
6. Copy of final preferred land use map
7. Copies of report maps on facilities, utility services, recreation sites, transportation, and land use

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Carson Pond
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 1: Inventory & Analysis Of Existing Conditions: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) includes the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase I) include:
1. Review and analysis on survey questionnaire data
2. Attendance at and facilitation of 3 (of 7) Plan Commission meetings
3. Coordination of 1 (of 2) public informational workshops
4. Draft and final versions of Inventory and Trends Report
5. Copy of final inventory report map(s)

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Carson Pond
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 2: Recommendations: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) will include the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase II) include:

1. Attendance at and facilitation of 4 (of &) Plan Commission meetings
2. Coordination of 1 (of 2) public informational workshops
3. Coordination and facilitation of the formal public hearing
4. Copy of draft Comprehensive Plan document
5. Copy of final Comprehensive Plan document
6. Copy of final preferred land use map
7. Copies of report maps on facilities, utility services, recreation sites, transportation, and land use

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2006
Waters Involved
Catlin Creek
Status
Complete

Upper St Croix Lake Association: A Community Approach To Data Collection, Lake Modeling & Strategic Planning, Phase 1: Upper St. Croix Lake Association is sponsoring a four-phase project to develop a community-based lake management plan. This scope covers the first two phases of the project.

Phase 1 includes tributary water quality and flow with loading estimates, as well as climate data collection. Phase 2 includes in-lake physical and chemical data collection, including water chemistry, clarity, and temperature, as well as groundwater flow and quality. In both phases, citizen volunteers will be trained to collect data (e.g. water quality samples and mapping of open-water areas), and a project steering committee will identify education and communication opportunities, coordinate volunteers, and provide project development input. The monitoring data will be used in modeling (Phase 3) to shape science-based management recommendations. These recommendations will be integrated into the (Phase 4) strategic lake management planning.

The Phase 1 and 2 final deliverables will be a summary of monitoring results and education/communication outreach both in report and presentation formats.

Special Condition: Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Large Scale Lake Planning
Date
10/1/2006
Waters Involved
Catlin Creek
Status
Complete

Upper St Croix Lake Association: A Community Approach To Data Collection, Lake Modeling, & Strategic Planning, Phase 2: Upper St. Croix Lake Association is sponsoring a four-phase project to develop a community-based lake management plan. This scope covers the first two phases of the project.

Phase 1 includes tributary water quality and flow with loading estimates, as well as climate data collection. Phase 2 includes in-lake physical and chemical data collection, including water chemistry, clarity, and temperature, as well as groundwater flow and quality. In both phases, citizen volunteers will be trained to collect data (e.g. water quality samples and mapping of open-water areas), and a project steering committee will identify education and communication opportunities, coordinate volunteers, and provide project development input. The monitoring data will be used in modeling (Phase 3) to shape science-based management recommendations. These recommendations will be integrated into the (Phase 4) strategic lake management planning.

The Phase 1 and 2 final deliverables will be a summary of monitoring results and education/communication outreach both in report and presentation formats.

Special Condition: Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Large Scale Lake Planning
Date
4/1/2007
Waters Involved
Catlin Creek
Status
Complete

Upper St Croix Lake Association: Community Approach To Lake Planning, Etc.-#3: Upper St. Croix Lake Association is sponsoring a multi-phase project to develop a community-based lake management plan. This scope covers the precipitation monitoring, internal loading and modeling phase.

Citizen volunteers will be trained to monitor precipitation daily. Twenty sediment cores will be collected and analyzed for sediment phosphorous release under oxic and anoxic conditions to determine sediment SRP release rates. Surface- and groundwater-sheds will be delineated. Water and nutrient budgets will be developed using monitoring data as well as land use, climate, and previous research information. WiLMS will be used to predict in-lake phosphorous concentrations under various management alternatives. This information will be used in the final project strategic planning and management plan development phase.

Final deliverables include: precipitation logs; sediment phosphorous release rates and study summary; modeling results, and watershed delineations.

This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. Grantee or consultant will provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR shall receive both paper and electronic copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
4/1/2007
Waters Involved
Catlin Creek
Status
Complete

Upper St Croix Lake Association: Community Approach To Lake Planning,Etc.-#4: Upper St. Croix Lake Association is sponsoring a multi-phase project to develop a community-based lake management plan. This scope covers an additional year of tributary monitoring that is necessary because of limited runoff monitoring during drought conditions (i.e. at least two years of monitoring are needed with existing climate variability).

This project includes measuring tributary water quality and flow, including event sampling, and developing loading estimates. Citizen volunteers will be trained to collect data (e.g. water quality samples), and a project steering committee will identify education and communication opportunities, coordinate volunteers, and provide project development input. The monitoring data will be used in the modeling and final strategic lake management planning phases.

Final deliverables include: data collection summary, rating curves, and interim lake management report (spring 2008).

This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. Grantee or consultant will provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR shall receive both paper and electronic copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Deep Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 1: Inventory & Analysis Of Existing Conditions: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) includes the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase I) include:
1. Review and analysis on survey questionnaire data
2. Attendance at and facilitation of 3 (of 7) Plan Commission meetings
3. Coordination of 1 (of 2) public informational workshops
4. Draft and final versions of Inventory and Trends Report
5. Copy of final inventory report map(s)

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Deep Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 2: Recommendations: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) will include the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase II) include:

1. Attendance at and facilitation of 4 (of &) Plan Commission meetings
2. Coordination of 1 (of 2) public informational workshops
3. Coordination and facilitation of the formal public hearing
4. Copy of draft Comprehensive Plan document
5. Copy of final Comprehensive Plan document
6. Copy of final preferred land use map
7. Copies of report maps on facilities, utility services, recreation sites, transportation, and land use

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Eagle Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 1: Inventory & Analysis Of Existing Conditions: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) includes the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase I) include:
1. Review and analysis on survey questionnaire data
2. Attendance at and facilitation of 3 (of 7) Plan Commission meetings
3. Coordination of 1 (of 2) public informational workshops
4. Draft and final versions of Inventory and Trends Report
5. Copy of final inventory report map(s)

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Eagle Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 2: Recommendations: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) will include the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase II) include:

1. Attendance at and facilitation of 4 (of &) Plan Commission meetings
2. Coordination of 1 (of 2) public informational workshops
3. Coordination and facilitation of the formal public hearing
4. Copy of draft Comprehensive Plan document
5. Copy of final Comprehensive Plan document
6. Copy of final preferred land use map
7. Copies of report maps on facilities, utility services, recreation sites, transportation, and land use

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Everett Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 1: Inventory & Analysis Of Existing Conditions: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) includes the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase I) include:
1. Review and analysis on survey questionnaire data
2. Attendance at and facilitation of 3 (of 7) Plan Commission meetings
3. Coordination of 1 (of 2) public informational workshops
4. Draft and final versions of Inventory and Trends Report
5. Copy of final inventory report map(s)

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Everett Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 2: Recommendations: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) will include the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase II) include:

1. Attendance at and facilitation of 4 (of &) Plan Commission meetings
2. Coordination of 1 (of 2) public informational workshops
3. Coordination and facilitation of the formal public hearing
4. Copy of draft Comprehensive Plan document
5. Copy of final Comprehensive Plan document
6. Copy of final preferred land use map
7. Copies of report maps on facilities, utility services, recreation sites, transportation, and land use

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Flynn Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 1: Inventory & Analysis Of Existing Conditions: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) includes the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase I) include:
1. Review and analysis on survey questionnaire data
2. Attendance at and facilitation of 3 (of 7) Plan Commission meetings
3. Coordination of 1 (of 2) public informational workshops
4. Draft and final versions of Inventory and Trends Report
5. Copy of final inventory report map(s)

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Flynn Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 2: Recommendations: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) will include the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase II) include:

1. Attendance at and facilitation of 4 (of &) Plan Commission meetings
2. Coordination of 1 (of 2) public informational workshops
3. Coordination and facilitation of the formal public hearing
4. Copy of draft Comprehensive Plan document
5. Copy of final Comprehensive Plan document
6. Copy of final preferred land use map
7. Copies of report maps on facilities, utility services, recreation sites, transportation, and land use

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Frog Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 1: Inventory & Analysis Of Existing Conditions: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) includes the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase I) include:
1. Review and analysis on survey questionnaire data
2. Attendance at and facilitation of 3 (of 7) Plan Commission meetings
3. Coordination of 1 (of 2) public informational workshops
4. Draft and final versions of Inventory and Trends Report
5. Copy of final inventory report map(s)

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Frog Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 2: Recommendations: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) will include the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase II) include:

1. Attendance at and facilitation of 4 (of &) Plan Commission meetings
2. Coordination of 1 (of 2) public informational workshops
3. Coordination and facilitation of the formal public hearing
4. Copy of draft Comprehensive Plan document
5. Copy of final Comprehensive Plan document
6. Copy of final preferred land use map
7. Copies of report maps on facilities, utility services, recreation sites, transportation, and land use

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Getsey Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 1: Inventory & Analysis Of Existing Conditions: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) includes the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase I) include:
1. Review and analysis on survey questionnaire data
2. Attendance at and facilitation of 3 (of 7) Plan Commission meetings
3. Coordination of 1 (of 2) public informational workshops
4. Draft and final versions of Inventory and Trends Report
5. Copy of final inventory report map(s)

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Getsey Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 2: Recommendations: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) will include the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase II) include:

1. Attendance at and facilitation of 4 (of &) Plan Commission meetings
2. Coordination of 1 (of 2) public informational workshops
3. Coordination and facilitation of the formal public hearing
4. Copy of draft Comprehensive Plan document
5. Copy of final Comprehensive Plan document
6. Copy of final preferred land use map
7. Copies of report maps on facilities, utility services, recreation sites, transportation, and land use

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Happles Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 1: Inventory & Analysis Of Existing Conditions: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) includes the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase I) include:
1. Review and analysis on survey questionnaire data
2. Attendance at and facilitation of 3 (of 7) Plan Commission meetings
3. Coordination of 1 (of 2) public informational workshops
4. Draft and final versions of Inventory and Trends Report
5. Copy of final inventory report map(s)

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Happles Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 2: Recommendations: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) will include the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase II) include:

1. Attendance at and facilitation of 4 (of &) Plan Commission meetings
2. Coordination of 1 (of 2) public informational workshops
3. Coordination and facilitation of the formal public hearing
4. Copy of draft Comprehensive Plan document
5. Copy of final Comprehensive Plan document
6. Copy of final preferred land use map
7. Copies of report maps on facilities, utility services, recreation sites, transportation, and land use

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Hay Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 1: Inventory & Analysis Of Existing Conditions: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) includes the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase I) include:
1. Review and analysis on survey questionnaire data
2. Attendance at and facilitation of 3 (of 7) Plan Commission meetings
3. Coordination of 1 (of 2) public informational workshops
4. Draft and final versions of Inventory and Trends Report
5. Copy of final inventory report map(s)

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Hay Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 2: Recommendations: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) will include the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase II) include:

1. Attendance at and facilitation of 4 (of &) Plan Commission meetings
2. Coordination of 1 (of 2) public informational workshops
3. Coordination and facilitation of the formal public hearing
4. Copy of draft Comprehensive Plan document
5. Copy of final Comprehensive Plan document
6. Copy of final preferred land use map
7. Copies of report maps on facilities, utility services, recreation sites, transportation, and land use

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Heart Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 1: Inventory & Analysis Of Existing Conditions: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) includes the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase I) include:
1. Review and analysis on survey questionnaire data
2. Attendance at and facilitation of 3 (of 7) Plan Commission meetings
3. Coordination of 1 (of 2) public informational workshops
4. Draft and final versions of Inventory and Trends Report
5. Copy of final inventory report map(s)

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Heart Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 2: Recommendations: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) will include the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase II) include:

1. Attendance at and facilitation of 4 (of &) Plan Commission meetings
2. Coordination of 1 (of 2) public informational workshops
3. Coordination and facilitation of the formal public hearing
4. Copy of draft Comprehensive Plan document
5. Copy of final Comprehensive Plan document
6. Copy of final preferred land use map
7. Copies of report maps on facilities, utility services, recreation sites, transportation, and land use

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Hildur Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 1: Inventory & Analysis Of Existing Conditions: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) includes the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase I) include:
1. Review and analysis on survey questionnaire data
2. Attendance at and facilitation of 3 (of 7) Plan Commission meetings
3. Coordination of 1 (of 2) public informational workshops
4. Draft and final versions of Inventory and Trends Report
5. Copy of final inventory report map(s)

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Hildur Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 2: Recommendations: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) will include the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase II) include:

1. Attendance at and facilitation of 4 (of &) Plan Commission meetings
2. Coordination of 1 (of 2) public informational workshops
3. Coordination and facilitation of the formal public hearing
4. Copy of draft Comprehensive Plan document
5. Copy of final Comprehensive Plan document
6. Copy of final preferred land use map
7. Copies of report maps on facilities, utility services, recreation sites, transportation, and land use

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Hollibar Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 1: Inventory & Analysis Of Existing Conditions: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) includes the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase I) include:
1. Review and analysis on survey questionnaire data
2. Attendance at and facilitation of 3 (of 7) Plan Commission meetings
3. Coordination of 1 (of 2) public informational workshops
4. Draft and final versions of Inventory and Trends Report
5. Copy of final inventory report map(s)

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Hollibar Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 2: Recommendations: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) will include the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase II) include:

1. Attendance at and facilitation of 4 (of &) Plan Commission meetings
2. Coordination of 1 (of 2) public informational workshops
3. Coordination and facilitation of the formal public hearing
4. Copy of draft Comprehensive Plan document
5. Copy of final Comprehensive Plan document
6. Copy of final preferred land use map
7. Copies of report maps on facilities, utility services, recreation sites, transportation, and land use

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Inch Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 1: Inventory & Analysis Of Existing Conditions: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) includes the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase I) include:
1. Review and analysis on survey questionnaire data
2. Attendance at and facilitation of 3 (of 7) Plan Commission meetings
3. Coordination of 1 (of 2) public informational workshops
4. Draft and final versions of Inventory and Trends Report
5. Copy of final inventory report map(s)

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Inch Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 2: Recommendations: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) will include the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase II) include:

1. Attendance at and facilitation of 4 (of &) Plan Commission meetings
2. Coordination of 1 (of 2) public informational workshops
3. Coordination and facilitation of the formal public hearing
4. Copy of draft Comprehensive Plan document
5. Copy of final Comprehensive Plan document
6. Copy of final preferred land use map
7. Copies of report maps on facilities, utility services, recreation sites, transportation, and land use

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Kern Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 1: Inventory & Analysis Of Existing Conditions: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) includes the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase I) include:
1. Review and analysis on survey questionnaire data
2. Attendance at and facilitation of 3 (of 7) Plan Commission meetings
3. Coordination of 1 (of 2) public informational workshops
4. Draft and final versions of Inventory and Trends Report
5. Copy of final inventory report map(s)

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Kern Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 2: Recommendations: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) will include the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase II) include:

1. Attendance at and facilitation of 4 (of &) Plan Commission meetings
2. Coordination of 1 (of 2) public informational workshops
3. Coordination and facilitation of the formal public hearing
4. Copy of draft Comprehensive Plan document
5. Copy of final Comprehensive Plan document
6. Copy of final preferred land use map
7. Copies of report maps on facilities, utility services, recreation sites, transportation, and land use

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Lake Bullhead
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 1: Inventory & Analysis Of Existing Conditions: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) includes the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase I) include:
1. Review and analysis on survey questionnaire data
2. Attendance at and facilitation of 3 (of 7) Plan Commission meetings
3. Coordination of 1 (of 2) public informational workshops
4. Draft and final versions of Inventory and Trends Report
5. Copy of final inventory report map(s)

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Lake Bullhead
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 2: Recommendations: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) will include the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase II) include:

1. Attendance at and facilitation of 4 (of &) Plan Commission meetings
2. Coordination of 1 (of 2) public informational workshops
3. Coordination and facilitation of the formal public hearing
4. Copy of draft Comprehensive Plan document
5. Copy of final Comprehensive Plan document
6. Copy of final preferred land use map
7. Copies of report maps on facilities, utility services, recreation sites, transportation, and land use

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Lake Delta
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 1: Inventory & Analysis Of Existing Conditions: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) includes the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase I) include:
1. Review and analysis on survey questionnaire data
2. Attendance at and facilitation of 3 (of 7) Plan Commission meetings
3. Coordination of 1 (of 2) public informational workshops
4. Draft and final versions of Inventory and Trends Report
5. Copy of final inventory report map(s)

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Lake Delta
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 2: Recommendations: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) will include the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase II) include:

1. Attendance at and facilitation of 4 (of &) Plan Commission meetings
2. Coordination of 1 (of 2) public informational workshops
3. Coordination and facilitation of the formal public hearing
4. Copy of draft Comprehensive Plan document
5. Copy of final Comprehensive Plan document
6. Copy of final preferred land use map
7. Copies of report maps on facilities, utility services, recreation sites, transportation, and land use

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Lake Ruth
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 1: Inventory & Analysis Of Existing Conditions: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) includes the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase I) include:
1. Review and analysis on survey questionnaire data
2. Attendance at and facilitation of 3 (of 7) Plan Commission meetings
3. Coordination of 1 (of 2) public informational workshops
4. Draft and final versions of Inventory and Trends Report
5. Copy of final inventory report map(s)

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Lake Ruth
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 2: Recommendations: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) will include the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase II) include:

1. Attendance at and facilitation of 4 (of &) Plan Commission meetings
2. Coordination of 1 (of 2) public informational workshops
3. Coordination and facilitation of the formal public hearing
4. Copy of draft Comprehensive Plan document
5. Copy of final Comprehensive Plan document
6. Copy of final preferred land use map
7. Copies of report maps on facilities, utility services, recreation sites, transportation, and land use

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Lake Two
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 1: Inventory & Analysis Of Existing Conditions: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) includes the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase I) include:
1. Review and analysis on survey questionnaire data
2. Attendance at and facilitation of 3 (of 7) Plan Commission meetings
3. Coordination of 1 (of 2) public informational workshops
4. Draft and final versions of Inventory and Trends Report
5. Copy of final inventory report map(s)

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Lake Two
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 2: Recommendations: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) will include the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase II) include:

1. Attendance at and facilitation of 4 (of &) Plan Commission meetings
2. Coordination of 1 (of 2) public informational workshops
3. Coordination and facilitation of the formal public hearing
4. Copy of draft Comprehensive Plan document
5. Copy of final Comprehensive Plan document
6. Copy of final preferred land use map
7. Copies of report maps on facilities, utility services, recreation sites, transportation, and land use

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Lemon Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 1: Inventory & Analysis Of Existing Conditions: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) includes the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase I) include:
1. Review and analysis on survey questionnaire data
2. Attendance at and facilitation of 3 (of 7) Plan Commission meetings
3. Coordination of 1 (of 2) public informational workshops
4. Draft and final versions of Inventory and Trends Report
5. Copy of final inventory report map(s)

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Lemon Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 2: Recommendations: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) will include the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase II) include:

1. Attendance at and facilitation of 4 (of &) Plan Commission meetings
2. Coordination of 1 (of 2) public informational workshops
3. Coordination and facilitation of the formal public hearing
4. Copy of draft Comprehensive Plan document
5. Copy of final Comprehensive Plan document
6. Copy of final preferred land use map
7. Copies of report maps on facilities, utility services, recreation sites, transportation, and land use

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2006
Waters Involved
Leo Creek
Status
Complete

Upper St Croix Lake Association: A Community Approach To Data Collection, Lake Modeling & Strategic Planning, Phase 1: Upper St. Croix Lake Association is sponsoring a four-phase project to develop a community-based lake management plan. This scope covers the first two phases of the project.

Phase 1 includes tributary water quality and flow with loading estimates, as well as climate data collection. Phase 2 includes in-lake physical and chemical data collection, including water chemistry, clarity, and temperature, as well as groundwater flow and quality. In both phases, citizen volunteers will be trained to collect data (e.g. water quality samples and mapping of open-water areas), and a project steering committee will identify education and communication opportunities, coordinate volunteers, and provide project development input. The monitoring data will be used in modeling (Phase 3) to shape science-based management recommendations. These recommendations will be integrated into the (Phase 4) strategic lake management planning.

The Phase 1 and 2 final deliverables will be a summary of monitoring results and education/communication outreach both in report and presentation formats.

Special Condition: Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Large Scale Lake Planning
Date
10/1/2006
Waters Involved
Leo Creek
Status
Complete

Upper St Croix Lake Association: A Community Approach To Data Collection, Lake Modeling, & Strategic Planning, Phase 2: Upper St. Croix Lake Association is sponsoring a four-phase project to develop a community-based lake management plan. This scope covers the first two phases of the project.

Phase 1 includes tributary water quality and flow with loading estimates, as well as climate data collection. Phase 2 includes in-lake physical and chemical data collection, including water chemistry, clarity, and temperature, as well as groundwater flow and quality. In both phases, citizen volunteers will be trained to collect data (e.g. water quality samples and mapping of open-water areas), and a project steering committee will identify education and communication opportunities, coordinate volunteers, and provide project development input. The monitoring data will be used in modeling (Phase 3) to shape science-based management recommendations. These recommendations will be integrated into the (Phase 4) strategic lake management planning.

The Phase 1 and 2 final deliverables will be a summary of monitoring results and education/communication outreach both in report and presentation formats.

Special Condition: Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Large Scale Lake Planning
Date
4/1/2007
Waters Involved
Leo Creek
Status
Complete

Upper St Croix Lake Association: Community Approach To Lake Planning, Etc.-#3: Upper St. Croix Lake Association is sponsoring a multi-phase project to develop a community-based lake management plan. This scope covers the precipitation monitoring, internal loading and modeling phase.

Citizen volunteers will be trained to monitor precipitation daily. Twenty sediment cores will be collected and analyzed for sediment phosphorous release under oxic and anoxic conditions to determine sediment SRP release rates. Surface- and groundwater-sheds will be delineated. Water and nutrient budgets will be developed using monitoring data as well as land use, climate, and previous research information. WiLMS will be used to predict in-lake phosphorous concentrations under various management alternatives. This information will be used in the final project strategic planning and management plan development phase.

Final deliverables include: precipitation logs; sediment phosphorous release rates and study summary; modeling results, and watershed delineations.

This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. Grantee or consultant will provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR shall receive both paper and electronic copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
4/1/2007
Waters Involved
Leo Creek
Status
Complete

Upper St Croix Lake Association: Community Approach To Lake Planning,Etc.-#4: Upper St. Croix Lake Association is sponsoring a multi-phase project to develop a community-based lake management plan. This scope covers an additional year of tributary monitoring that is necessary because of limited runoff monitoring during drought conditions (i.e. at least two years of monitoring are needed with existing climate variability).

This project includes measuring tributary water quality and flow, including event sampling, and developing loading estimates. Citizen volunteers will be trained to collect data (e.g. water quality samples), and a project steering committee will identify education and communication opportunities, coordinate volunteers, and provide project development input. The monitoring data will be used in the modeling and final strategic lake management planning phases.

Final deliverables include: data collection summary, rating curves, and interim lake management report (spring 2008).

This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. Grantee or consultant will provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR shall receive both paper and electronic copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Lester Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 1: Inventory & Analysis Of Existing Conditions: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) includes the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase I) include:
1. Review and analysis on survey questionnaire data
2. Attendance at and facilitation of 3 (of 7) Plan Commission meetings
3. Coordination of 1 (of 2) public informational workshops
4. Draft and final versions of Inventory and Trends Report
5. Copy of final inventory report map(s)

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Lester Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 2: Recommendations: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) will include the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase II) include:

1. Attendance at and facilitation of 4 (of &) Plan Commission meetings
2. Coordination of 1 (of 2) public informational workshops
3. Coordination and facilitation of the formal public hearing
4. Copy of draft Comprehensive Plan document
5. Copy of final Comprehensive Plan document
6. Copy of final preferred land use map
7. Copies of report maps on facilities, utility services, recreation sites, transportation, and land use

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Line Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 1: Inventory & Analysis Of Existing Conditions: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) includes the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase I) include:
1. Review and analysis on survey questionnaire data
2. Attendance at and facilitation of 3 (of 7) Plan Commission meetings
3. Coordination of 1 (of 2) public informational workshops
4. Draft and final versions of Inventory and Trends Report
5. Copy of final inventory report map(s)

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Line Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 2: Recommendations: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) will include the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase II) include:

1. Attendance at and facilitation of 4 (of &) Plan Commission meetings
2. Coordination of 1 (of 2) public informational workshops
3. Coordination and facilitation of the formal public hearing
4. Copy of draft Comprehensive Plan document
5. Copy of final Comprehensive Plan document
6. Copy of final preferred land use map
7. Copies of report maps on facilities, utility services, recreation sites, transportation, and land use

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
4/1/2004
Waters Involved
Lower Eau Claire Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes Management Plan-Lower Eau Claire: In combination with two other planning grant applications for Middle and Upper Lake Eau Claire, the Town of Barnes proposes to develop a management plan for the lake system that integrates with the town comprehensive land use plan. The scope includes an investigation of shoreland buffer areas and recommend best management practices, review of town and county ordinances with recommendations for revisions, delineation and digital mapping of the lake watershed, watershed modeling, compilation of existing water quality and environmental information about the lakes, conducting and analyzing a social survey.

The deliverable will be a Lake Plan and Land Use document that identifies and lake and watershed management strategies, prioritizes needs and goals to reduce nonpoint source pollutant loading.


Grant Details
Large Scale Lake Planning
Date
4/1/2004
Waters Involved
Middle Eau Claire Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes Management Plan - Middle Eau Claire Lake: In combination with two other planning grant applications for Upper and Lower Lake Eau Claire, the Town of Barnes proposes to develop a management plan for the lake system that integrates with the town comprehensive land use plan. The scope includes an investigation of shoreland buffer areas and recommend best management practices, review of town and county ordinances with recommendations for revisions, delineation and digital mapping of the lake watershed, watershed modeling, compilation of existing water quality and environmental information about the lakes, conducting and analyzing a social survey.

The deliverable will be a Lake Plan and Land Use document that identifies and lake and watershed management strategies, prioritizes needs and goals to reduce nonpoint source pollutant loading.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Mud Flat Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 1: Inventory & Analysis Of Existing Conditions: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) includes the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase I) include:
1. Review and analysis on survey questionnaire data
2. Attendance at and facilitation of 3 (of 7) Plan Commission meetings
3. Coordination of 1 (of 2) public informational workshops
4. Draft and final versions of Inventory and Trends Report
5. Copy of final inventory report map(s)

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Mud Flat Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 2: Recommendations: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) will include the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase II) include:

1. Attendance at and facilitation of 4 (of &) Plan Commission meetings
2. Coordination of 1 (of 2) public informational workshops
3. Coordination and facilitation of the formal public hearing
4. Copy of draft Comprehensive Plan document
5. Copy of final Comprehensive Plan document
6. Copy of final preferred land use map
7. Copies of report maps on facilities, utility services, recreation sites, transportation, and land use

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Mud Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 1: Inventory & Analysis Of Existing Conditions: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) includes the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase I) include:
1. Review and analysis on survey questionnaire data
2. Attendance at and facilitation of 3 (of 7) Plan Commission meetings
3. Coordination of 1 (of 2) public informational workshops
4. Draft and final versions of Inventory and Trends Report
5. Copy of final inventory report map(s)

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Mud Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 2: Recommendations: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) will include the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase II) include:

1. Attendance at and facilitation of 4 (of &) Plan Commission meetings
2. Coordination of 1 (of 2) public informational workshops
3. Coordination and facilitation of the formal public hearing
4. Copy of draft Comprehensive Plan document
5. Copy of final Comprehensive Plan document
6. Copy of final preferred land use map
7. Copies of report maps on facilities, utility services, recreation sites, transportation, and land use

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Muskellunge Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 1: Inventory & Analysis Of Existing Conditions: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) includes the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase I) include:
1. Review and analysis on survey questionnaire data
2. Attendance at and facilitation of 3 (of 7) Plan Commission meetings
3. Coordination of 1 (of 2) public informational workshops
4. Draft and final versions of Inventory and Trends Report
5. Copy of final inventory report map(s)

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Muskellunge Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 2: Recommendations: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) will include the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase II) include:

1. Attendance at and facilitation of 4 (of &) Plan Commission meetings
2. Coordination of 1 (of 2) public informational workshops
3. Coordination and facilitation of the formal public hearing
4. Copy of draft Comprehensive Plan document
5. Copy of final Comprehensive Plan document
6. Copy of final preferred land use map
7. Copies of report maps on facilities, utility services, recreation sites, transportation, and land use

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Mystery Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 1: Inventory & Analysis Of Existing Conditions: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) includes the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase I) include:
1. Review and analysis on survey questionnaire data
2. Attendance at and facilitation of 3 (of 7) Plan Commission meetings
3. Coordination of 1 (of 2) public informational workshops
4. Draft and final versions of Inventory and Trends Report
5. Copy of final inventory report map(s)

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Mystery Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 2: Recommendations: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) will include the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase II) include:

1. Attendance at and facilitation of 4 (of &) Plan Commission meetings
2. Coordination of 1 (of 2) public informational workshops
3. Coordination and facilitation of the formal public hearing
4. Copy of draft Comprehensive Plan document
5. Copy of final Comprehensive Plan document
6. Copy of final preferred land use map
7. Copies of report maps on facilities, utility services, recreation sites, transportation, and land use

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2006
Waters Involved
Park Creek
Status
Complete

Upper St Croix Lake Association: A Community Approach To Data Collection, Lake Modeling & Strategic Planning, Phase 1: Upper St. Croix Lake Association is sponsoring a four-phase project to develop a community-based lake management plan. This scope covers the first two phases of the project.

Phase 1 includes tributary water quality and flow with loading estimates, as well as climate data collection. Phase 2 includes in-lake physical and chemical data collection, including water chemistry, clarity, and temperature, as well as groundwater flow and quality. In both phases, citizen volunteers will be trained to collect data (e.g. water quality samples and mapping of open-water areas), and a project steering committee will identify education and communication opportunities, coordinate volunteers, and provide project development input. The monitoring data will be used in modeling (Phase 3) to shape science-based management recommendations. These recommendations will be integrated into the (Phase 4) strategic lake management planning.

The Phase 1 and 2 final deliverables will be a summary of monitoring results and education/communication outreach both in report and presentation formats.

Special Condition: Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Large Scale Lake Planning
Date
10/1/2006
Waters Involved
Park Creek
Status
Complete

Upper St Croix Lake Association: A Community Approach To Data Collection, Lake Modeling, & Strategic Planning, Phase 2: Upper St. Croix Lake Association is sponsoring a four-phase project to develop a community-based lake management plan. This scope covers the first two phases of the project.

Phase 1 includes tributary water quality and flow with loading estimates, as well as climate data collection. Phase 2 includes in-lake physical and chemical data collection, including water chemistry, clarity, and temperature, as well as groundwater flow and quality. In both phases, citizen volunteers will be trained to collect data (e.g. water quality samples and mapping of open-water areas), and a project steering committee will identify education and communication opportunities, coordinate volunteers, and provide project development input. The monitoring data will be used in modeling (Phase 3) to shape science-based management recommendations. These recommendations will be integrated into the (Phase 4) strategic lake management planning.

The Phase 1 and 2 final deliverables will be a summary of monitoring results and education/communication outreach both in report and presentation formats.

Special Condition: Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Large Scale Lake Planning
Date
4/1/2007
Waters Involved
Park Creek
Status
Complete

Upper St Croix Lake Association: Community Approach To Lake Planning, Etc.-#3: Upper St. Croix Lake Association is sponsoring a multi-phase project to develop a community-based lake management plan. This scope covers the precipitation monitoring, internal loading and modeling phase.

Citizen volunteers will be trained to monitor precipitation daily. Twenty sediment cores will be collected and analyzed for sediment phosphorous release under oxic and anoxic conditions to determine sediment SRP release rates. Surface- and groundwater-sheds will be delineated. Water and nutrient budgets will be developed using monitoring data as well as land use, climate, and previous research information. WiLMS will be used to predict in-lake phosphorous concentrations under various management alternatives. This information will be used in the final project strategic planning and management plan development phase.

Final deliverables include: precipitation logs; sediment phosphorous release rates and study summary; modeling results, and watershed delineations.

This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. Grantee or consultant will provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR shall receive both paper and electronic copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
4/1/2007
Waters Involved
Park Creek
Status
Complete

Upper St Croix Lake Association: Community Approach To Lake Planning,Etc.-#4: Upper St. Croix Lake Association is sponsoring a multi-phase project to develop a community-based lake management plan. This scope covers an additional year of tributary monitoring that is necessary because of limited runoff monitoring during drought conditions (i.e. at least two years of monitoring are needed with existing climate variability).

This project includes measuring tributary water quality and flow, including event sampling, and developing loading estimates. Citizen volunteers will be trained to collect data (e.g. water quality samples), and a project steering committee will identify education and communication opportunities, coordinate volunteers, and provide project development input. The monitoring data will be used in the modeling and final strategic lake management planning phases.

Final deliverables include: data collection summary, rating curves, and interim lake management report (spring 2008).

This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. Grantee or consultant will provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR shall receive both paper and electronic copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Phantom Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 1: Inventory & Analysis Of Existing Conditions: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) includes the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase I) include:
1. Review and analysis on survey questionnaire data
2. Attendance at and facilitation of 3 (of 7) Plan Commission meetings
3. Coordination of 1 (of 2) public informational workshops
4. Draft and final versions of Inventory and Trends Report
5. Copy of final inventory report map(s)

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Phantom Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 2: Recommendations: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) will include the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase II) include:

1. Attendance at and facilitation of 4 (of &) Plan Commission meetings
2. Coordination of 1 (of 2) public informational workshops
3. Coordination and facilitation of the formal public hearing
4. Copy of draft Comprehensive Plan document
5. Copy of final Comprehensive Plan document
6. Copy of final preferred land use map
7. Copies of report maps on facilities, utility services, recreation sites, transportation, and land use

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Rainbow Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 1: Inventory & Analysis Of Existing Conditions: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) includes the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase I) include:
1. Review and analysis on survey questionnaire data
2. Attendance at and facilitation of 3 (of 7) Plan Commission meetings
3. Coordination of 1 (of 2) public informational workshops
4. Draft and final versions of Inventory and Trends Report
5. Copy of final inventory report map(s)

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Rainbow Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 2: Recommendations: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) will include the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase II) include:

1. Attendance at and facilitation of 4 (of &) Plan Commission meetings
2. Coordination of 1 (of 2) public informational workshops
3. Coordination and facilitation of the formal public hearing
4. Copy of draft Comprehensive Plan document
5. Copy of final Comprehensive Plan document
6. Copy of final preferred land use map
7. Copies of report maps on facilities, utility services, recreation sites, transportation, and land use

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Saint Croix River
Status
Complete

River Country Rc&D Council, Inc: Green Development Conference: River Country RC&D proposes to conduct a conference entitled "The Nuts and Bolts of Green Development" in conjunction with the St. Croix Basin Partnership Team. Objective of the conference and associated bus tours will be to provide riparian owners, interested citizens, and municipal operators and engineers with information useful to the development of small-scale and community-wide stormwater management practices.


Grant Details
Large Scale Lake Planning
Date
10/1/2006
Waters Involved
Saint Croix River
Status
Complete

Upper St Croix Lake Association: A Community Approach To Data Collection, Lake Modeling & Strategic Planning, Phase 1: Upper St. Croix Lake Association is sponsoring a four-phase project to develop a community-based lake management plan. This scope covers the first two phases of the project.

Phase 1 includes tributary water quality and flow with loading estimates, as well as climate data collection. Phase 2 includes in-lake physical and chemical data collection, including water chemistry, clarity, and temperature, as well as groundwater flow and quality. In both phases, citizen volunteers will be trained to collect data (e.g. water quality samples and mapping of open-water areas), and a project steering committee will identify education and communication opportunities, coordinate volunteers, and provide project development input. The monitoring data will be used in modeling (Phase 3) to shape science-based management recommendations. These recommendations will be integrated into the (Phase 4) strategic lake management planning.

The Phase 1 and 2 final deliverables will be a summary of monitoring results and education/communication outreach both in report and presentation formats.

Special Condition: Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Large Scale Lake Planning
Date
10/1/2006
Waters Involved
Saint Croix River
Status
Complete

Upper St Croix Lake Association: A Community Approach To Data Collection, Lake Modeling, & Strategic Planning, Phase 2: Upper St. Croix Lake Association is sponsoring a four-phase project to develop a community-based lake management plan. This scope covers the first two phases of the project.

Phase 1 includes tributary water quality and flow with loading estimates, as well as climate data collection. Phase 2 includes in-lake physical and chemical data collection, including water chemistry, clarity, and temperature, as well as groundwater flow and quality. In both phases, citizen volunteers will be trained to collect data (e.g. water quality samples and mapping of open-water areas), and a project steering committee will identify education and communication opportunities, coordinate volunteers, and provide project development input. The monitoring data will be used in modeling (Phase 3) to shape science-based management recommendations. These recommendations will be integrated into the (Phase 4) strategic lake management planning.

The Phase 1 and 2 final deliverables will be a summary of monitoring results and education/communication outreach both in report and presentation formats.

Special Condition: Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Large Scale Lake Planning
Date
4/1/2007
Waters Involved
Saint Croix River
Status
Complete

Upper St Croix Lake Association: Community Approach To Lake Planning, Etc.-#3: Upper St. Croix Lake Association is sponsoring a multi-phase project to develop a community-based lake management plan. This scope covers the precipitation monitoring, internal loading and modeling phase.

Citizen volunteers will be trained to monitor precipitation daily. Twenty sediment cores will be collected and analyzed for sediment phosphorous release under oxic and anoxic conditions to determine sediment SRP release rates. Surface- and groundwater-sheds will be delineated. Water and nutrient budgets will be developed using monitoring data as well as land use, climate, and previous research information. WiLMS will be used to predict in-lake phosphorous concentrations under various management alternatives. This information will be used in the final project strategic planning and management plan development phase.

Final deliverables include: precipitation logs; sediment phosphorous release rates and study summary; modeling results, and watershed delineations.

This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. Grantee or consultant will provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR shall receive both paper and electronic copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
4/1/2007
Waters Involved
Saint Croix River
Status
Complete

Upper St Croix Lake Association: Community Approach To Lake Planning,Etc.-#4: Upper St. Croix Lake Association is sponsoring a multi-phase project to develop a community-based lake management plan. This scope covers an additional year of tributary monitoring that is necessary because of limited runoff monitoring during drought conditions (i.e. at least two years of monitoring are needed with existing climate variability).

This project includes measuring tributary water quality and flow, including event sampling, and developing loading estimates. Citizen volunteers will be trained to collect data (e.g. water quality samples), and a project steering committee will identify education and communication opportunities, coordinate volunteers, and provide project development input. The monitoring data will be used in the modeling and final strategic lake management planning phases.

Final deliverables include: data collection summary, rating curves, and interim lake management report (spring 2008).

This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. Grantee or consultant will provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR shall receive both paper and electronic copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2007
Waters Involved
Saint Croix River
Status
Complete

Upper St Croix Lake Association: A Community Management Approach: Grant 5: Upper St. Croix Lake Association is sponsoring a multi-phase project to develop a community-based lake management plan. This project includes additional lake monitoring, WiLMS modeling, science-based strategic planning, and a final report, including synthesizing current and historic studies.

Final deliverables include: monitoring data summaries and final lake management plan/report that integrates the information collected from the previous phase and historic studies and a strategic plan that includes an implementation schedule.

This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. Grantee or consultant will provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR shall receive both paper and electronic copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Sand Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 1: Inventory & Analysis Of Existing Conditions: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) includes the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase I) include:
1. Review and analysis on survey questionnaire data
2. Attendance at and facilitation of 3 (of 7) Plan Commission meetings
3. Coordination of 1 (of 2) public informational workshops
4. Draft and final versions of Inventory and Trends Report
5. Copy of final inventory report map(s)

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Sand Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 2: Recommendations: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) will include the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase II) include:

1. Attendance at and facilitation of 4 (of &) Plan Commission meetings
2. Coordination of 1 (of 2) public informational workshops
3. Coordination and facilitation of the formal public hearing
4. Copy of draft Comprehensive Plan document
5. Copy of final Comprehensive Plan document
6. Copy of final preferred land use map
7. Copies of report maps on facilities, utility services, recreation sites, transportation, and land use

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Sawmill Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 1: Inventory & Analysis Of Existing Conditions: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) includes the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase I) include:
1. Review and analysis on survey questionnaire data
2. Attendance at and facilitation of 3 (of 7) Plan Commission meetings
3. Coordination of 1 (of 2) public informational workshops
4. Draft and final versions of Inventory and Trends Report
5. Copy of final inventory report map(s)

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Sawmill Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 2: Recommendations: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) will include the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase II) include:

1. Attendance at and facilitation of 4 (of &) Plan Commission meetings
2. Coordination of 1 (of 2) public informational workshops
3. Coordination and facilitation of the formal public hearing
4. Copy of draft Comprehensive Plan document
5. Copy of final Comprehensive Plan document
6. Copy of final preferred land use map
7. Copies of report maps on facilities, utility services, recreation sites, transportation, and land use

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Silver Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 1: Inventory & Analysis Of Existing Conditions: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) includes the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase I) include:
1. Review and analysis on survey questionnaire data
2. Attendance at and facilitation of 3 (of 7) Plan Commission meetings
3. Coordination of 1 (of 2) public informational workshops
4. Draft and final versions of Inventory and Trends Report
5. Copy of final inventory report map(s)

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Silver Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 2: Recommendations: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) will include the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase II) include:

1. Attendance at and facilitation of 4 (of &) Plan Commission meetings
2. Coordination of 1 (of 2) public informational workshops
3. Coordination and facilitation of the formal public hearing
4. Copy of draft Comprehensive Plan document
5. Copy of final Comprehensive Plan document
6. Copy of final preferred land use map
7. Copies of report maps on facilities, utility services, recreation sites, transportation, and land use

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Spirit Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 1: Inventory & Analysis Of Existing Conditions: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) includes the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase I) include:
1. Review and analysis on survey questionnaire data
2. Attendance at and facilitation of 3 (of 7) Plan Commission meetings
3. Coordination of 1 (of 2) public informational workshops
4. Draft and final versions of Inventory and Trends Report
5. Copy of final inventory report map(s)

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Spirit Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 2: Recommendations: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) will include the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase II) include:

1. Attendance at and facilitation of 4 (of &) Plan Commission meetings
2. Coordination of 1 (of 2) public informational workshops
3. Coordination and facilitation of the formal public hearing
4. Copy of draft Comprehensive Plan document
5. Copy of final Comprehensive Plan document
6. Copy of final preferred land use map
7. Copies of report maps on facilities, utility services, recreation sites, transportation, and land use

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Square Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 1: Inventory & Analysis Of Existing Conditions: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) includes the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase I) include:
1. Review and analysis on survey questionnaire data
2. Attendance at and facilitation of 3 (of 7) Plan Commission meetings
3. Coordination of 1 (of 2) public informational workshops
4. Draft and final versions of Inventory and Trends Report
5. Copy of final inventory report map(s)

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Square Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 2: Recommendations: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) will include the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase II) include:

1. Attendance at and facilitation of 4 (of &) Plan Commission meetings
2. Coordination of 1 (of 2) public informational workshops
3. Coordination and facilitation of the formal public hearing
4. Copy of draft Comprehensive Plan document
5. Copy of final Comprehensive Plan document
6. Copy of final preferred land use map
7. Copies of report maps on facilities, utility services, recreation sites, transportation, and land use

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2006
Waters Involved
St Croix Creek
Status
Complete

Upper St Croix Lake Association: A Community Approach To Data Collection, Lake Modeling & Strategic Planning, Phase 1: Upper St. Croix Lake Association is sponsoring a four-phase project to develop a community-based lake management plan. This scope covers the first two phases of the project.

Phase 1 includes tributary water quality and flow with loading estimates, as well as climate data collection. Phase 2 includes in-lake physical and chemical data collection, including water chemistry, clarity, and temperature, as well as groundwater flow and quality. In both phases, citizen volunteers will be trained to collect data (e.g. water quality samples and mapping of open-water areas), and a project steering committee will identify education and communication opportunities, coordinate volunteers, and provide project development input. The monitoring data will be used in modeling (Phase 3) to shape science-based management recommendations. These recommendations will be integrated into the (Phase 4) strategic lake management planning.

The Phase 1 and 2 final deliverables will be a summary of monitoring results and education/communication outreach both in report and presentation formats.

Special Condition: Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Large Scale Lake Planning
Date
10/1/2006
Waters Involved
St Croix Creek
Status
Complete

Upper St Croix Lake Association: A Community Approach To Data Collection, Lake Modeling, & Strategic Planning, Phase 2: Upper St. Croix Lake Association is sponsoring a four-phase project to develop a community-based lake management plan. This scope covers the first two phases of the project.

Phase 1 includes tributary water quality and flow with loading estimates, as well as climate data collection. Phase 2 includes in-lake physical and chemical data collection, including water chemistry, clarity, and temperature, as well as groundwater flow and quality. In both phases, citizen volunteers will be trained to collect data (e.g. water quality samples and mapping of open-water areas), and a project steering committee will identify education and communication opportunities, coordinate volunteers, and provide project development input. The monitoring data will be used in modeling (Phase 3) to shape science-based management recommendations. These recommendations will be integrated into the (Phase 4) strategic lake management planning.

The Phase 1 and 2 final deliverables will be a summary of monitoring results and education/communication outreach both in report and presentation formats.

Special Condition: Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Large Scale Lake Planning
Date
4/1/2007
Waters Involved
St Croix Creek
Status
Complete

Upper St Croix Lake Association: Community Approach To Lake Planning, Etc.-#3: Upper St. Croix Lake Association is sponsoring a multi-phase project to develop a community-based lake management plan. This scope covers the precipitation monitoring, internal loading and modeling phase.

Citizen volunteers will be trained to monitor precipitation daily. Twenty sediment cores will be collected and analyzed for sediment phosphorous release under oxic and anoxic conditions to determine sediment SRP release rates. Surface- and groundwater-sheds will be delineated. Water and nutrient budgets will be developed using monitoring data as well as land use, climate, and previous research information. WiLMS will be used to predict in-lake phosphorous concentrations under various management alternatives. This information will be used in the final project strategic planning and management plan development phase.

Final deliverables include: precipitation logs; sediment phosphorous release rates and study summary; modeling results, and watershed delineations.

This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. Grantee or consultant will provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR shall receive both paper and electronic copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
4/1/2007
Waters Involved
St Croix Creek
Status
Complete

Upper St Croix Lake Association: Community Approach To Lake Planning,Etc.-#4: Upper St. Croix Lake Association is sponsoring a multi-phase project to develop a community-based lake management plan. This scope covers an additional year of tributary monitoring that is necessary because of limited runoff monitoring during drought conditions (i.e. at least two years of monitoring are needed with existing climate variability).

This project includes measuring tributary water quality and flow, including event sampling, and developing loading estimates. Citizen volunteers will be trained to collect data (e.g. water quality samples), and a project steering committee will identify education and communication opportunities, coordinate volunteers, and provide project development input. The monitoring data will be used in the modeling and final strategic lake management planning phases.

Final deliverables include: data collection summary, rating curves, and interim lake management report (spring 2008).

This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. Grantee or consultant will provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR shall receive both paper and electronic copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
St Croix Flowage
Status
Complete

Upper St Croix Lake Association: Surface And Groundwater Hydro. Study, For St. Croix Lakes: The Upper St. Croix Lake Association and the St. Croix Flowage Association are proposing a joint project to study the meteorilogical, hydrologic, and wetland ecosystem characteristics of the Upper Lake St. Croix and St. Croix Flowage wateshed that will provide a framework for establishing a long-term study that quantifies the water budget (inflow, outflow, and storage components) of the watershed hydrologic system.

Specific deliverables for this project will include a project report, community presentations and an educational outreach program for local lake associations and community/school groups that focuses on the hydrologic cycle as a dynamic component of the Northland environment.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Steelhead Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 1: Inventory & Analysis Of Existing Conditions: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) includes the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase I) include:
1. Review and analysis on survey questionnaire data
2. Attendance at and facilitation of 3 (of 7) Plan Commission meetings
3. Coordination of 1 (of 2) public informational workshops
4. Draft and final versions of Inventory and Trends Report
5. Copy of final inventory report map(s)

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Steelhead Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 2: Recommendations: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) will include the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase II) include:

1. Attendance at and facilitation of 4 (of &) Plan Commission meetings
2. Coordination of 1 (of 2) public informational workshops
3. Coordination and facilitation of the formal public hearing
4. Copy of draft Comprehensive Plan document
5. Copy of final Comprehensive Plan document
6. Copy of final preferred land use map
7. Copies of report maps on facilities, utility services, recreation sites, transportation, and land use

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Swede Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 1: Inventory & Analysis Of Existing Conditions: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) includes the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase I) include:
1. Review and analysis on survey questionnaire data
2. Attendance at and facilitation of 3 (of 7) Plan Commission meetings
3. Coordination of 1 (of 2) public informational workshops
4. Draft and final versions of Inventory and Trends Report
5. Copy of final inventory report map(s)

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Swede Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 2: Recommendations: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) will include the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase II) include:

1. Attendance at and facilitation of 4 (of &) Plan Commission meetings
2. Coordination of 1 (of 2) public informational workshops
3. Coordination and facilitation of the formal public hearing
4. Copy of draft Comprehensive Plan document
5. Copy of final Comprehensive Plan document
6. Copy of final preferred land use map
7. Copies of report maps on facilities, utility services, recreation sites, transportation, and land use

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Teacup Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 1: Inventory & Analysis Of Existing Conditions: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) includes the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase I) include:
1. Review and analysis on survey questionnaire data
2. Attendance at and facilitation of 3 (of 7) Plan Commission meetings
3. Coordination of 1 (of 2) public informational workshops
4. Draft and final versions of Inventory and Trends Report
5. Copy of final inventory report map(s)

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Teacup Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 2: Recommendations: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) will include the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase II) include:

1. Attendance at and facilitation of 4 (of &) Plan Commission meetings
2. Coordination of 1 (of 2) public informational workshops
3. Coordination and facilitation of the formal public hearing
4. Copy of draft Comprehensive Plan document
5. Copy of final Comprehensive Plan document
6. Copy of final preferred land use map
7. Copies of report maps on facilities, utility services, recreation sites, transportation, and land use

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Toothpick Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 1: Inventory & Analysis Of Existing Conditions: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) includes the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase I) include:
1. Review and analysis on survey questionnaire data
2. Attendance at and facilitation of 3 (of 7) Plan Commission meetings
3. Coordination of 1 (of 2) public informational workshops
4. Draft and final versions of Inventory and Trends Report
5. Copy of final inventory report map(s)

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Toothpick Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 2: Recommendations: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) will include the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase II) include:

1. Attendance at and facilitation of 4 (of &) Plan Commission meetings
2. Coordination of 1 (of 2) public informational workshops
3. Coordination and facilitation of the formal public hearing
4. Copy of draft Comprehensive Plan document
5. Copy of final Comprehensive Plan document
6. Copy of final preferred land use map
7. Copies of report maps on facilities, utility services, recreation sites, transportation, and land use

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Tower Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 1: Inventory & Analysis Of Existing Conditions: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) includes the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase I) include:
1. Review and analysis on survey questionnaire data
2. Attendance at and facilitation of 3 (of 7) Plan Commission meetings
3. Coordination of 1 (of 2) public informational workshops
4. Draft and final versions of Inventory and Trends Report
5. Copy of final inventory report map(s)

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Tower Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 2: Recommendations: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) will include the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase II) include:

1. Attendance at and facilitation of 4 (of &) Plan Commission meetings
2. Coordination of 1 (of 2) public informational workshops
3. Coordination and facilitation of the formal public hearing
4. Copy of draft Comprehensive Plan document
5. Copy of final Comprehensive Plan document
6. Copy of final preferred land use map
7. Copies of report maps on facilities, utility services, recreation sites, transportation, and land use

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Trout Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 1: Inventory & Analysis Of Existing Conditions: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) includes the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase I) include:
1. Review and analysis on survey questionnaire data
2. Attendance at and facilitation of 3 (of 7) Plan Commission meetings
3. Coordination of 1 (of 2) public informational workshops
4. Draft and final versions of Inventory and Trends Report
5. Copy of final inventory report map(s)

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Trout Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 2: Recommendations: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) will include the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase II) include:

1. Attendance at and facilitation of 4 (of &) Plan Commission meetings
2. Coordination of 1 (of 2) public informational workshops
3. Coordination and facilitation of the formal public hearing
4. Copy of draft Comprehensive Plan document
5. Copy of final Comprehensive Plan document
6. Copy of final preferred land use map
7. Copies of report maps on facilities, utility services, recreation sites, transportation, and land use

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Tub Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 1: Inventory & Analysis Of Existing Conditions: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) includes the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase I) include:
1. Review and analysis on survey questionnaire data
2. Attendance at and facilitation of 3 (of 7) Plan Commission meetings
3. Coordination of 1 (of 2) public informational workshops
4. Draft and final versions of Inventory and Trends Report
5. Copy of final inventory report map(s)

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Tub Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 2: Recommendations: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) will include the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase II) include:

1. Attendance at and facilitation of 4 (of &) Plan Commission meetings
2. Coordination of 1 (of 2) public informational workshops
3. Coordination and facilitation of the formal public hearing
4. Copy of draft Comprehensive Plan document
5. Copy of final Comprehensive Plan document
6. Copy of final preferred land use map
7. Copies of report maps on facilities, utility services, recreation sites, transportation, and land use

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Twin Bear Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 1: Inventory & Analysis Of Existing Conditions: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) includes the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase I) include:
1. Review and analysis on survey questionnaire data
2. Attendance at and facilitation of 3 (of 7) Plan Commission meetings
3. Coordination of 1 (of 2) public informational workshops
4. Draft and final versions of Inventory and Trends Report
5. Copy of final inventory report map(s)

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Twin Bear Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 2: Recommendations: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) will include the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase II) include:

1. Attendance at and facilitation of 4 (of &) Plan Commission meetings
2. Coordination of 1 (of 2) public informational workshops
3. Coordination and facilitation of the formal public hearing
4. Copy of draft Comprehensive Plan document
5. Copy of final Comprehensive Plan document
6. Copy of final preferred land use map
7. Copies of report maps on facilities, utility services, recreation sites, transportation, and land use

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Un Spring
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 1: Inventory & Analysis Of Existing Conditions: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) includes the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase I) include:
1. Review and analysis on survey questionnaire data
2. Attendance at and facilitation of 3 (of 7) Plan Commission meetings
3. Coordination of 1 (of 2) public informational workshops
4. Draft and final versions of Inventory and Trends Report
5. Copy of final inventory report map(s)

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Un Spring
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 2: Recommendations: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) will include the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase II) include:

1. Attendance at and facilitation of 4 (of &) Plan Commission meetings
2. Coordination of 1 (of 2) public informational workshops
3. Coordination and facilitation of the formal public hearing
4. Copy of draft Comprehensive Plan document
5. Copy of final Comprehensive Plan document
6. Copy of final preferred land use map
7. Copies of report maps on facilities, utility services, recreation sites, transportation, and land use

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Unnamed
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 1: Inventory & Analysis Of Existing Conditions: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) includes the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase I) include:
1. Review and analysis on survey questionnaire data
2. Attendance at and facilitation of 3 (of 7) Plan Commission meetings
3. Coordination of 1 (of 2) public informational workshops
4. Draft and final versions of Inventory and Trends Report
5. Copy of final inventory report map(s)

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Unnamed
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 2: Recommendations: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) will include the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase II) include:

1. Attendance at and facilitation of 4 (of &) Plan Commission meetings
2. Coordination of 1 (of 2) public informational workshops
3. Coordination and facilitation of the formal public hearing
4. Copy of draft Comprehensive Plan document
5. Copy of final Comprehensive Plan document
6. Copy of final preferred land use map
7. Copies of report maps on facilities, utility services, recreation sites, transportation, and land use

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Unnamed
Status
Complete

River Country Rc&D Council, Inc: Green Development Conference: River Country RC&D proposes to conduct a conference entitled "The Nuts and Bolts of Green Development" in conjunction with the St. Croix Basin Partnership Team. Objective of the conference and associated bus tours will be to provide riparian owners, interested citizens, and municipal operators and engineers with information useful to the development of small-scale and community-wide stormwater management practices.


Grant Details
Large Scale Lake Planning
Date
10/1/2006
Waters Involved
Unnamed
Status
Complete

Upper St Croix Lake Association: A Community Approach To Data Collection, Lake Modeling & Strategic Planning, Phase 1: Upper St. Croix Lake Association is sponsoring a four-phase project to develop a community-based lake management plan. This scope covers the first two phases of the project.

Phase 1 includes tributary water quality and flow with loading estimates, as well as climate data collection. Phase 2 includes in-lake physical and chemical data collection, including water chemistry, clarity, and temperature, as well as groundwater flow and quality. In both phases, citizen volunteers will be trained to collect data (e.g. water quality samples and mapping of open-water areas), and a project steering committee will identify education and communication opportunities, coordinate volunteers, and provide project development input. The monitoring data will be used in modeling (Phase 3) to shape science-based management recommendations. These recommendations will be integrated into the (Phase 4) strategic lake management planning.

The Phase 1 and 2 final deliverables will be a summary of monitoring results and education/communication outreach both in report and presentation formats.

Special Condition: Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Large Scale Lake Planning
Date
10/1/2006
Waters Involved
Unnamed
Status
Complete

Upper St Croix Lake Association: A Community Approach To Data Collection, Lake Modeling, & Strategic Planning, Phase 2: Upper St. Croix Lake Association is sponsoring a four-phase project to develop a community-based lake management plan. This scope covers the first two phases of the project.

Phase 1 includes tributary water quality and flow with loading estimates, as well as climate data collection. Phase 2 includes in-lake physical and chemical data collection, including water chemistry, clarity, and temperature, as well as groundwater flow and quality. In both phases, citizen volunteers will be trained to collect data (e.g. water quality samples and mapping of open-water areas), and a project steering committee will identify education and communication opportunities, coordinate volunteers, and provide project development input. The monitoring data will be used in modeling (Phase 3) to shape science-based management recommendations. These recommendations will be integrated into the (Phase 4) strategic lake management planning.

The Phase 1 and 2 final deliverables will be a summary of monitoring results and education/communication outreach both in report and presentation formats.

Special Condition: Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Large Scale Lake Planning
Date
4/1/2007
Waters Involved
Unnamed
Status
Complete

Upper St Croix Lake Association: Community Approach To Lake Planning, Etc.-#3: Upper St. Croix Lake Association is sponsoring a multi-phase project to develop a community-based lake management plan. This scope covers the precipitation monitoring, internal loading and modeling phase.

Citizen volunteers will be trained to monitor precipitation daily. Twenty sediment cores will be collected and analyzed for sediment phosphorous release under oxic and anoxic conditions to determine sediment SRP release rates. Surface- and groundwater-sheds will be delineated. Water and nutrient budgets will be developed using monitoring data as well as land use, climate, and previous research information. WiLMS will be used to predict in-lake phosphorous concentrations under various management alternatives. This information will be used in the final project strategic planning and management plan development phase.

Final deliverables include: precipitation logs; sediment phosphorous release rates and study summary; modeling results, and watershed delineations.

This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. Grantee or consultant will provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR shall receive both paper and electronic copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
4/1/2007
Waters Involved
Unnamed
Status
Complete

Upper St Croix Lake Association: Community Approach To Lake Planning,Etc.-#4: Upper St. Croix Lake Association is sponsoring a multi-phase project to develop a community-based lake management plan. This scope covers an additional year of tributary monitoring that is necessary because of limited runoff monitoring during drought conditions (i.e. at least two years of monitoring are needed with existing climate variability).

This project includes measuring tributary water quality and flow, including event sampling, and developing loading estimates. Citizen volunteers will be trained to collect data (e.g. water quality samples), and a project steering committee will identify education and communication opportunities, coordinate volunteers, and provide project development input. The monitoring data will be used in the modeling and final strategic lake management planning phases.

Final deliverables include: data collection summary, rating curves, and interim lake management report (spring 2008).

This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. Grantee or consultant will provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR shall receive both paper and electronic copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2007
Waters Involved
Unnamed
Status
Complete

Upper St Croix Lake Association: A Community Management Approach: Grant 5: Upper St. Croix Lake Association is sponsoring a multi-phase project to develop a community-based lake management plan. This project includes additional lake monitoring, WiLMS modeling, science-based strategic planning, and a final report, including synthesizing current and historic studies.

Final deliverables include: monitoring data summaries and final lake management plan/report that integrates the information collected from the previous phase and historic studies and a strategic plan that includes an implementation schedule.

This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. Grantee or consultant will provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR shall receive both paper and electronic copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
4/1/2004
Waters Involved
Upper Eau Claire Lake
Status
Complete

Town Of Barnes: Eau Claire Lakes Management Plan - Upper Eau Claire: In combination with two other planning grant applications for Middle and Lower Lake Eau Claire, the Town of Barnes proposes to develop a management plan for the lake system that integrates with the town comprehensive land use plan. The scope includes an investigation of shoreland buffer areas and recommend best management practices, review of town and county ordinances with recommendations for revisions, delineation and digital mapping of the lake watershed, watershed modeling, compilation of existing water quality and environmental information about the lakes, conducting and analyzing a social survey.

The deliverable will be a Lake Plan and Land Use document that identifies and lake and watershed management strategies, prioritizes needs and goals to reduce nonpoint source pollutant loading.


Grant Details
Large Scale Lake Planning
Date
10/1/2006
Waters Involved
Upper Saint Croix Lake
Status
Complete

Upper St Croix Lake Association: A Community Approach To Data Collection, Lake Modeling & Strategic Planning, Phase 1: Upper St. Croix Lake Association is sponsoring a four-phase project to develop a community-based lake management plan. This scope covers the first two phases of the project.

Phase 1 includes tributary water quality and flow with loading estimates, as well as climate data collection. Phase 2 includes in-lake physical and chemical data collection, including water chemistry, clarity, and temperature, as well as groundwater flow and quality. In both phases, citizen volunteers will be trained to collect data (e.g. water quality samples and mapping of open-water areas), and a project steering committee will identify education and communication opportunities, coordinate volunteers, and provide project development input. The monitoring data will be used in modeling (Phase 3) to shape science-based management recommendations. These recommendations will be integrated into the (Phase 4) strategic lake management planning.

The Phase 1 and 2 final deliverables will be a summary of monitoring results and education/communication outreach both in report and presentation formats.

Special Condition: Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Large Scale Lake Planning
Date
10/1/2006
Waters Involved
Upper Saint Croix Lake
Status
Complete

Upper St Croix Lake Association: A Community Approach To Data Collection, Lake Modeling, & Strategic Planning, Phase 2: Upper St. Croix Lake Association is sponsoring a four-phase project to develop a community-based lake management plan. This scope covers the first two phases of the project.

Phase 1 includes tributary water quality and flow with loading estimates, as well as climate data collection. Phase 2 includes in-lake physical and chemical data collection, including water chemistry, clarity, and temperature, as well as groundwater flow and quality. In both phases, citizen volunteers will be trained to collect data (e.g. water quality samples and mapping of open-water areas), and a project steering committee will identify education and communication opportunities, coordinate volunteers, and provide project development input. The monitoring data will be used in modeling (Phase 3) to shape science-based management recommendations. These recommendations will be integrated into the (Phase 4) strategic lake management planning.

The Phase 1 and 2 final deliverables will be a summary of monitoring results and education/communication outreach both in report and presentation formats.

Special Condition: Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Large Scale Lake Planning
Date
4/1/2007
Waters Involved
Upper Saint Croix Lake
Status
Complete

Upper St Croix Lake Association: Community Approach To Lake Planning, Etc.-#3: Upper St. Croix Lake Association is sponsoring a multi-phase project to develop a community-based lake management plan. This scope covers the precipitation monitoring, internal loading and modeling phase.

Citizen volunteers will be trained to monitor precipitation daily. Twenty sediment cores will be collected and analyzed for sediment phosphorous release under oxic and anoxic conditions to determine sediment SRP release rates. Surface- and groundwater-sheds will be delineated. Water and nutrient budgets will be developed using monitoring data as well as land use, climate, and previous research information. WiLMS will be used to predict in-lake phosphorous concentrations under various management alternatives. This information will be used in the final project strategic planning and management plan development phase.

Final deliverables include: precipitation logs; sediment phosphorous release rates and study summary; modeling results, and watershed delineations.

This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. Grantee or consultant will provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR shall receive both paper and electronic copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
4/1/2007
Waters Involved
Upper Saint Croix Lake
Status
Complete

Upper St Croix Lake Association: Community Approach To Lake Planning,Etc.-#4: Upper St. Croix Lake Association is sponsoring a multi-phase project to develop a community-based lake management plan. This scope covers an additional year of tributary monitoring that is necessary because of limited runoff monitoring during drought conditions (i.e. at least two years of monitoring are needed with existing climate variability).

This project includes measuring tributary water quality and flow, including event sampling, and developing loading estimates. Citizen volunteers will be trained to collect data (e.g. water quality samples), and a project steering committee will identify education and communication opportunities, coordinate volunteers, and provide project development input. The monitoring data will be used in the modeling and final strategic lake management planning phases.

Final deliverables include: data collection summary, rating curves, and interim lake management report (spring 2008).

This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. Grantee or consultant will provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR shall receive both paper and electronic copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2007
Waters Involved
Upper Saint Croix Lake
Status
Complete

Upper St Croix Lake Association: A Community Management Approach: Grant 5: Upper St. Croix Lake Association is sponsoring a multi-phase project to develop a community-based lake management plan. This project includes additional lake monitoring, WiLMS modeling, science-based strategic planning, and a final report, including synthesizing current and historic studies.

Final deliverables include: monitoring data summaries and final lake management plan/report that integrates the information collected from the previous phase and historic studies and a strategic plan that includes an implementation schedule.

This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. Grantee or consultant will provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR shall receive both paper and electronic copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
West Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 1: Inventory & Analysis Of Existing Conditions: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) includes the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase I) include:
1. Review and analysis on survey questionnaire data
2. Attendance at and facilitation of 3 (of 7) Plan Commission meetings
3. Coordination of 1 (of 2) public informational workshops
4. Draft and final versions of Inventory and Trends Report
5. Copy of final inventory report map(s)

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
West Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 2: Recommendations: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) will include the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase II) include:

1. Attendance at and facilitation of 4 (of &) Plan Commission meetings
2. Coordination of 1 (of 2) public informational workshops
3. Coordination and facilitation of the formal public hearing
4. Copy of draft Comprehensive Plan document
5. Copy of final Comprehensive Plan document
6. Copy of final preferred land use map
7. Copies of report maps on facilities, utility services, recreation sites, transportation, and land use

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Wolf Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 1: Inventory & Analysis Of Existing Conditions: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) includes the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase I) include:
1. Review and analysis on survey questionnaire data
2. Attendance at and facilitation of 3 (of 7) Plan Commission meetings
3. Coordination of 1 (of 2) public informational workshops
4. Draft and final versions of Inventory and Trends Report
5. Copy of final inventory report map(s)

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Wolf Lake
Status
Complete

Town Of Delta: Town Of Delta Comprehensive Plan - Phase 2: Recommendations: The Town of Delta will conduct a two-phase comprehensive planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Delta in Bayfield County. Phase I (Inventory and Analysis of Existing Conditions) will include the public outreach and data analysis that will become the foundation for Phase II. Phase II (Recommendations for Preferred Future Conditions) will result in recommendations for the future of the town relative to all of the required elements of a "Smart Growth" comprehensive plan.

Specific deliverables for this grant project (Phase II) include:

1. Attendance at and facilitation of 4 (of &) Plan Commission meetings
2. Coordination of 1 (of 2) public informational workshops
3. Coordination and facilitation of the formal public hearing
4. Copy of draft Comprehensive Plan document
5. Copy of final Comprehensive Plan document
6. Copy of final preferred land use map
7. Copies of report maps on facilities, utility services, recreation sites, transportation, and land use

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Small Scale Lake Planning
Date
4/1/2013
Waters Involved
Barnes Lake
Status
Complete

Barnes/Eau Claire Lakes Area Property Owners: Lake Eco Education Program: The Barnes/Eau Claire Lakes Area Property Owners Association is expanding their Eco Education project to include additional 7th grade curriculum and supplies and an adult component. The adult component entails a seminar on lake ecology with a field trip.

Specific deliverables for this project include a summary report of tasks described above and examples (electronic and paper) of educational tools / curriculum developed as part of this grant.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Small Scale Lake Planning
Date
4/1/2008
Waters Involved
Beauregard Lake
Status
Complete

Barnes/Eau Claire Lakes Area Property Owners: Dissolved Oxygen Monitoring On The Barnes Area/Eau Claire Chain Of Lakes: The Barnes-Eau Claire Property Owners Association is purchasing a temperature/dissolved oxygen (DO) meter to be used by several lakes included in the association to record full lake profiles of both of these parameters. More accurate and credible information will result from purchase of this meter. The specific meter purchased must be approved by the WI-DNR Lakes Program before reimbursement can take place. All DO and temperature information collected as a part of the Citizen Lake Monitoring Network must be entered into Wisconsin's Surface Water Inventory Management System (SWIMS) for as long as the given body of water is officially part of this program. Data entered into SWIMS is available to any who wish to access it.


Grant Details
Small Scale Lake Planning
Date
4/1/2008
Waters Involved
Birch Lake
Status
Complete

Barnes/Eau Claire Lakes Area Property Owners: Dissolved Oxygen Monitoring On The Barnes Area/Eau Claire Chain Of Lakes: The Barnes-Eau Claire Property Owners Association is purchasing a temperature/dissolved oxygen (DO) meter to be used by several lakes included in the association to record full lake profiles of both of these parameters. More accurate and credible information will result from purchase of this meter. The specific meter purchased must be approved by the WI-DNR Lakes Program before reimbursement can take place. All DO and temperature information collected as a part of the Citizen Lake Monitoring Network must be entered into Wisconsin's Surface Water Inventory Management System (SWIMS) for as long as the given body of water is officially part of this program. Data entered into SWIMS is available to any who wish to access it.


Grant Details
Small Scale Lake Planning
Date
10/1/2010
Waters Involved
Birch Lake
Status
Complete

Barnes/Eau Claire Lakes Area Property Owners: Eco Education/Pontoon Classroom: The Eau Claire Lakes Area Property Owners Association is sponsoring a small scale planning grant to educate Drummond 7th graders about a wide range of lake characteristics and issues including biology, chemistry, geology, and the physics of lakes. The science will be applied to human impacts on water resources and emphasize the need to protect these resources.

Specific deliverables for this project include a summary report of tasks described above and examples (electronic and paper) of educational tools / curriculum developed as part of this grant. Receipts must be included for all equipment purchased as a part of this grant.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Small Scale Lake Planning
Date
4/1/2008
Waters Involved
Bony Lake
Status
Complete

Barnes/Eau Claire Lakes Area Property Owners: Dissolved Oxygen Monitoring On The Barnes Area/Eau Claire Chain Of Lakes: The Barnes-Eau Claire Property Owners Association is purchasing a temperature/dissolved oxygen (DO) meter to be used by several lakes included in the association to record full lake profiles of both of these parameters. More accurate and credible information will result from purchase of this meter. The specific meter purchased must be approved by the WI-DNR Lakes Program before reimbursement can take place. All DO and temperature information collected as a part of the Citizen Lake Monitoring Network must be entered into Wisconsin's Surface Water Inventory Management System (SWIMS) for as long as the given body of water is officially part of this program. Data entered into SWIMS is available to any who wish to access it.


Grant Details
Small Scale Lake Planning
Date
10/1/2010
Waters Involved
Bony Lake
Status
Complete

Barnes/Eau Claire Lakes Area Property Owners: Eco Education/Pontoon Classroom: The Eau Claire Lakes Area Property Owners Association is sponsoring a small scale planning grant to educate Drummond 7th graders about a wide range of lake characteristics and issues including biology, chemistry, geology, and the physics of lakes. The science will be applied to human impacts on water resources and emphasize the need to protect these resources.

Specific deliverables for this project include a summary report of tasks described above and examples (electronic and paper) of educational tools / curriculum developed as part of this grant. Receipts must be included for all equipment purchased as a part of this grant.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Small Scale Lake Planning
Date
4/1/2008
Waters Involved
Cranberry Lake
Status
Complete

Barnes/Eau Claire Lakes Area Property Owners: Dissolved Oxygen Monitoring On The Barnes Area/Eau Claire Chain Of Lakes: The Barnes-Eau Claire Property Owners Association is purchasing a temperature/dissolved oxygen (DO) meter to be used by several lakes included in the association to record full lake profiles of both of these parameters. More accurate and credible information will result from purchase of this meter. The specific meter purchased must be approved by the WI-DNR Lakes Program before reimbursement can take place. All DO and temperature information collected as a part of the Citizen Lake Monitoring Network must be entered into Wisconsin's Surface Water Inventory Management System (SWIMS) for as long as the given body of water is officially part of this program. Data entered into SWIMS is available to any who wish to access it.


Grant Details
Small Scale Lake Planning
Date
10/1/2010
Waters Involved
Cranberry Lake
Status
Complete

Barnes/Eau Claire Lakes Area Property Owners: Eco Education/Pontoon Classroom: The Eau Claire Lakes Area Property Owners Association is sponsoring a small scale planning grant to educate Drummond 7th graders about a wide range of lake characteristics and issues including biology, chemistry, geology, and the physics of lakes. The science will be applied to human impacts on water resources and emphasize the need to protect these resources.

Specific deliverables for this project include a summary report of tasks described above and examples (electronic and paper) of educational tools / curriculum developed as part of this grant. Receipts must be included for all equipment purchased as a part of this grant.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Small Scale Lake Planning
Date
4/1/2008
Waters Involved
Devils Lake
Status
Complete

Barnes/Eau Claire Lakes Area Property Owners: Dissolved Oxygen Monitoring On The Barnes Area/Eau Claire Chain Of Lakes: The Barnes-Eau Claire Property Owners Association is purchasing a temperature/dissolved oxygen (DO) meter to be used by several lakes included in the association to record full lake profiles of both of these parameters. More accurate and credible information will result from purchase of this meter. The specific meter purchased must be approved by the WI-DNR Lakes Program before reimbursement can take place. All DO and temperature information collected as a part of the Citizen Lake Monitoring Network must be entered into Wisconsin's Surface Water Inventory Management System (SWIMS) for as long as the given body of water is officially part of this program. Data entered into SWIMS is available to any who wish to access it.


Grant Details
Small Scale Lake Planning
Date
10/1/2010
Waters Involved
Devils Lake
Status
Complete

Barnes/Eau Claire Lakes Area Property Owners: Eco Education/Pontoon Classroom: The Eau Claire Lakes Area Property Owners Association is sponsoring a small scale planning grant to educate Drummond 7th graders about a wide range of lake characteristics and issues including biology, chemistry, geology, and the physics of lakes. The science will be applied to human impacts on water resources and emphasize the need to protect these resources.

Specific deliverables for this project include a summary report of tasks described above and examples (electronic and paper) of educational tools / curriculum developed as part of this grant. Receipts must be included for all equipment purchased as a part of this grant.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Small Scale Lake Planning
Date
4/1/2008
Waters Involved
Eau Claire River
Status
Complete

Barnes/Eau Claire Lakes Area Property Owners: Dissolved Oxygen Monitoring On The Barnes Area/Eau Claire Chain Of Lakes: The Barnes-Eau Claire Property Owners Association is purchasing a temperature/dissolved oxygen (DO) meter to be used by several lakes included in the association to record full lake profiles of both of these parameters. More accurate and credible information will result from purchase of this meter. The specific meter purchased must be approved by the WI-DNR Lakes Program before reimbursement can take place. All DO and temperature information collected as a part of the Citizen Lake Monitoring Network must be entered into Wisconsin's Surface Water Inventory Management System (SWIMS) for as long as the given body of water is officially part of this program. Data entered into SWIMS is available to any who wish to access it.


Grant Details
Small Scale Lake Planning
Date
10/1/2010
Waters Involved
Eau Claire River
Status
Complete

Barnes/Eau Claire Lakes Area Property Owners: Eco Education/Pontoon Classroom: The Eau Claire Lakes Area Property Owners Association is sponsoring a small scale planning grant to educate Drummond 7th graders about a wide range of lake characteristics and issues including biology, chemistry, geology, and the physics of lakes. The science will be applied to human impacts on water resources and emphasize the need to protect these resources.

Specific deliverables for this project include a summary report of tasks described above and examples (electronic and paper) of educational tools / curriculum developed as part of this grant. Receipts must be included for all equipment purchased as a part of this grant.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Small Scale Lake Planning
Date
4/1/2013
Waters Involved
Eau Claire River
Status
Complete

Barnes/Eau Claire Lakes Area Property Owners: Lake Eco Education Program: The Barnes/Eau Claire Lakes Area Property Owners Association is expanding their Eco Education project to include additional 7th grade curriculum and supplies and an adult component. The adult component entails a seminar on lake ecology with a field trip.

Specific deliverables for this project include a summary report of tasks described above and examples (electronic and paper) of educational tools / curriculum developed as part of this grant.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Small Scale Lake Planning
Date
4/1/2013
Waters Involved
Eau Claire River Flowage
Status
Complete

Barnes/Eau Claire Lakes Area Property Owners: Lake Eco Education Program: The Barnes/Eau Claire Lakes Area Property Owners Association is expanding their Eco Education project to include additional 7th grade curriculum and supplies and an adult component. The adult component entails a seminar on lake ecology with a field trip.

Specific deliverables for this project include a summary report of tasks described above and examples (electronic and paper) of educational tools / curriculum developed as part of this grant.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Small Scale Lake Planning
Date
4/1/2008
Waters Involved
George Lake
Status
Complete

Barnes/Eau Claire Lakes Area Property Owners: Dissolved Oxygen Monitoring On The Barnes Area/Eau Claire Chain Of Lakes: The Barnes-Eau Claire Property Owners Association is purchasing a temperature/dissolved oxygen (DO) meter to be used by several lakes included in the association to record full lake profiles of both of these parameters. More accurate and credible information will result from purchase of this meter. The specific meter purchased must be approved by the WI-DNR Lakes Program before reimbursement can take place. All DO and temperature information collected as a part of the Citizen Lake Monitoring Network must be entered into Wisconsin's Surface Water Inventory Management System (SWIMS) for as long as the given body of water is officially part of this program. Data entered into SWIMS is available to any who wish to access it.


Grant Details
Small Scale Lake Planning
Date
4/1/2008
Waters Involved
Island Lake
Status
Complete

Barnes/Eau Claire Lakes Area Property Owners: Dissolved Oxygen Monitoring On The Barnes Area/Eau Claire Chain Of Lakes: The Barnes-Eau Claire Property Owners Association is purchasing a temperature/dissolved oxygen (DO) meter to be used by several lakes included in the association to record full lake profiles of both of these parameters. More accurate and credible information will result from purchase of this meter. The specific meter purchased must be approved by the WI-DNR Lakes Program before reimbursement can take place. All DO and temperature information collected as a part of the Citizen Lake Monitoring Network must be entered into Wisconsin's Surface Water Inventory Management System (SWIMS) for as long as the given body of water is officially part of this program. Data entered into SWIMS is available to any who wish to access it.


Grant Details
Small Scale Lake Planning
Date
4/1/2008
Waters Involved
Lower Eau Claire Lake
Status
Complete

Barnes/Eau Claire Lakes Area Property Owners: Dissolved Oxygen Monitoring On The Barnes Area/Eau Claire Chain Of Lakes: The Barnes-Eau Claire Property Owners Association is purchasing a temperature/dissolved oxygen (DO) meter to be used by several lakes included in the association to record full lake profiles of both of these parameters. More accurate and credible information will result from purchase of this meter. The specific meter purchased must be approved by the WI-DNR Lakes Program before reimbursement can take place. All DO and temperature information collected as a part of the Citizen Lake Monitoring Network must be entered into Wisconsin's Surface Water Inventory Management System (SWIMS) for as long as the given body of water is officially part of this program. Data entered into SWIMS is available to any who wish to access it.


Grant Details
Small Scale Lake Planning
Date
10/1/2010
Waters Involved
Lower Eau Claire Lake
Status
Complete

Barnes/Eau Claire Lakes Area Property Owners: Eco Education/Pontoon Classroom: The Eau Claire Lakes Area Property Owners Association is sponsoring a small scale planning grant to educate Drummond 7th graders about a wide range of lake characteristics and issues including biology, chemistry, geology, and the physics of lakes. The science will be applied to human impacts on water resources and emphasize the need to protect these resources.

Specific deliverables for this project include a summary report of tasks described above and examples (electronic and paper) of educational tools / curriculum developed as part of this grant. Receipts must be included for all equipment purchased as a part of this grant.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Small Scale Lake Planning
Date
4/1/2008
Waters Involved
Middle Eau Claire Lake
Status
Complete

Barnes/Eau Claire Lakes Area Property Owners: Dissolved Oxygen Monitoring On The Barnes Area/Eau Claire Chain Of Lakes: The Barnes-Eau Claire Property Owners Association is purchasing a temperature/dissolved oxygen (DO) meter to be used by several lakes included in the association to record full lake profiles of both of these parameters. More accurate and credible information will result from purchase of this meter. The specific meter purchased must be approved by the WI-DNR Lakes Program before reimbursement can take place. All DO and temperature information collected as a part of the Citizen Lake Monitoring Network must be entered into Wisconsin's Surface Water Inventory Management System (SWIMS) for as long as the given body of water is officially part of this program. Data entered into SWIMS is available to any who wish to access it.


Grant Details
Small Scale Lake Planning
Date
10/1/2010
Waters Involved
Middle Eau Claire Lake
Status
Complete

Barnes/Eau Claire Lakes Area Property Owners: Eco Education/Pontoon Classroom: The Eau Claire Lakes Area Property Owners Association is sponsoring a small scale planning grant to educate Drummond 7th graders about a wide range of lake characteristics and issues including biology, chemistry, geology, and the physics of lakes. The science will be applied to human impacts on water resources and emphasize the need to protect these resources.

Specific deliverables for this project include a summary report of tasks described above and examples (electronic and paper) of educational tools / curriculum developed as part of this grant. Receipts must be included for all equipment purchased as a part of this grant.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Small Scale Lake Planning
Date
4/1/2013
Waters Involved
Middle Eau Claire Lake
Status
Complete

Barnes/Eau Claire Lakes Area Property Owners: Lake Eco Education Program: The Barnes/Eau Claire Lakes Area Property Owners Association is expanding their Eco Education project to include additional 7th grade curriculum and supplies and an adult component. The adult component entails a seminar on lake ecology with a field trip.

Specific deliverables for this project include a summary report of tasks described above and examples (electronic and paper) of educational tools / curriculum developed as part of this grant.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Small Scale Lake Planning
Date
4/1/2008
Waters Involved
Mulligan Creek
Status
Complete

Barnes/Eau Claire Lakes Area Property Owners: Dissolved Oxygen Monitoring On The Barnes Area/Eau Claire Chain Of Lakes: The Barnes-Eau Claire Property Owners Association is purchasing a temperature/dissolved oxygen (DO) meter to be used by several lakes included in the association to record full lake profiles of both of these parameters. More accurate and credible information will result from purchase of this meter. The specific meter purchased must be approved by the WI-DNR Lakes Program before reimbursement can take place. All DO and temperature information collected as a part of the Citizen Lake Monitoring Network must be entered into Wisconsin's Surface Water Inventory Management System (SWIMS) for as long as the given body of water is officially part of this program. Data entered into SWIMS is available to any who wish to access it.


Grant Details
Small Scale Lake Planning
Date
10/1/2010
Waters Involved
Mulligan Creek
Status
Complete

Barnes/Eau Claire Lakes Area Property Owners: Eco Education/Pontoon Classroom: The Eau Claire Lakes Area Property Owners Association is sponsoring a small scale planning grant to educate Drummond 7th graders about a wide range of lake characteristics and issues including biology, chemistry, geology, and the physics of lakes. The science will be applied to human impacts on water resources and emphasize the need to protect these resources.

Specific deliverables for this project include a summary report of tasks described above and examples (electronic and paper) of educational tools / curriculum developed as part of this grant. Receipts must be included for all equipment purchased as a part of this grant.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Small Scale Lake Planning
Date
4/1/2013
Waters Involved
Mulligan Creek
Status
Complete

Barnes/Eau Claire Lakes Area Property Owners: Lake Eco Education Program: The Barnes/Eau Claire Lakes Area Property Owners Association is expanding their Eco Education project to include additional 7th grade curriculum and supplies and an adult component. The adult component entails a seminar on lake ecology with a field trip.

Specific deliverables for this project include a summary report of tasks described above and examples (electronic and paper) of educational tools / curriculum developed as part of this grant.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Small Scale Lake Planning
Date
4/1/2008
Waters Involved
Pickerel Lake
Status
Complete

Barnes/Eau Claire Lakes Area Property Owners: Dissolved Oxygen Monitoring On The Barnes Area/Eau Claire Chain Of Lakes: The Barnes-Eau Claire Property Owners Association is purchasing a temperature/dissolved oxygen (DO) meter to be used by several lakes included in the association to record full lake profiles of both of these parameters. More accurate and credible information will result from purchase of this meter. The specific meter purchased must be approved by the WI-DNR Lakes Program before reimbursement can take place. All DO and temperature information collected as a part of the Citizen Lake Monitoring Network must be entered into Wisconsin's Surface Water Inventory Management System (SWIMS) for as long as the given body of water is officially part of this program. Data entered into SWIMS is available to any who wish to access it.


Grant Details
Small Scale Lake Planning
Date
4/1/2008
Waters Involved
Robinson Lake
Status
Complete

Barnes/Eau Claire Lakes Area Property Owners: Dissolved Oxygen Monitoring On The Barnes Area/Eau Claire Chain Of Lakes: The Barnes-Eau Claire Property Owners Association is purchasing a temperature/dissolved oxygen (DO) meter to be used by several lakes included in the association to record full lake profiles of both of these parameters. More accurate and credible information will result from purchase of this meter. The specific meter purchased must be approved by the WI-DNR Lakes Program before reimbursement can take place. All DO and temperature information collected as a part of the Citizen Lake Monitoring Network must be entered into Wisconsin's Surface Water Inventory Management System (SWIMS) for as long as the given body of water is officially part of this program. Data entered into SWIMS is available to any who wish to access it.


Grant Details
Small Scale Lake Planning
Date
10/1/2010
Waters Involved
Robinson Lake
Status
Complete

Barnes/Eau Claire Lakes Area Property Owners: Eco Education/Pontoon Classroom: The Eau Claire Lakes Area Property Owners Association is sponsoring a small scale planning grant to educate Drummond 7th graders about a wide range of lake characteristics and issues including biology, chemistry, geology, and the physics of lakes. The science will be applied to human impacts on water resources and emphasize the need to protect these resources.

Specific deliverables for this project include a summary report of tasks described above and examples (electronic and paper) of educational tools / curriculum developed as part of this grant. Receipts must be included for all equipment purchased as a part of this grant.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Small Scale Lake Planning
Date
10/1/2003
Waters Involved
Saint Croix River
Status
Complete

St. Croix County: St. Croix Nutrient River Conference: St. Croix County Land and Water Conservation Department proposes to sponsor a conference in Februrary of 2004 to identify and begin to address factors contributing to the pollution of Lake St. Croix. The goal is to bring together wastewater treatment managers, local officials, water resource professionals, land developers and watershed manager to allow networking and sharing of information associated with nutrient and sediment loading in the lake. The DNR will be provided with both a paper copy and electronic copy of the final report.


Grant Details
Small Scale Lake Planning
Date
10/1/2004
Waters Involved
Saint Croix River
Status
Complete

St. Croix County: St. Croix Basin Conference: St Croix County proposes to sponsor an informational and educational conference relating to the protection and management of Lake St. Croix.


Grant Details
Small Scale Lake Planning
Date
4/1/2006
Waters Involved
Saint Croix River
Status
Complete

St. Croix County: St. Croix Conference '06: St. Croix County proposes to sponsor an informational and educational conference relating to the protection and management of Lake St. Croix. Major project elements to include: 1) conference costs associated with printing mailing, provision of lunch and transportation, 2) staff coordination.


Grant Details
Small Scale Lake Planning
Date
10/1/2010
Waters Involved
Saint Croix River
Status
Complete

Upper St Croix Lake Association: Upper St. Croix Lake Protection Grant App/Proposal: Upper St. Croix Lake Association, in partnership with the Town and Village of Solon Springs, is sponsoring a project to plan for future runoff and habitat improvements along Main Street. The grant proposal(s) will address the specific ranking criteria, including modeling water quality benefits. The final deliverables will be lake protection and targeted runoff management grant applications with enough detail to qualify as complete project proposals.

Special conditions: Lake Protection \2013 Plan Implementation project eligibility should be requested in writing prior to 1 March 2011, and DNR to review grant application proposals BEFORE final reimbursement is paid to contractor.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, reports, and education materials, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional lake coordinator.


Grant Details
Small Scale Lake Planning
Date
4/1/2008
Waters Involved
Shunenberg Lake
Status
Complete

Barnes/Eau Claire Lakes Area Property Owners: Dissolved Oxygen Monitoring On The Barnes Area/Eau Claire Chain Of Lakes: The Barnes-Eau Claire Property Owners Association is purchasing a temperature/dissolved oxygen (DO) meter to be used by several lakes included in the association to record full lake profiles of both of these parameters. More accurate and credible information will result from purchase of this meter. The specific meter purchased must be approved by the WI-DNR Lakes Program before reimbursement can take place. All DO and temperature information collected as a part of the Citizen Lake Monitoring Network must be entered into Wisconsin's Surface Water Inventory Management System (SWIMS) for as long as the given body of water is officially part of this program. Data entered into SWIMS is available to any who wish to access it.


Grant Details
Small Scale Lake Planning
Date
10/1/2010
Waters Involved
Shunenberg Lake
Status
Complete

Barnes/Eau Claire Lakes Area Property Owners: Eco Education/Pontoon Classroom: The Eau Claire Lakes Area Property Owners Association is sponsoring a small scale planning grant to educate Drummond 7th graders about a wide range of lake characteristics and issues including biology, chemistry, geology, and the physics of lakes. The science will be applied to human impacts on water resources and emphasize the need to protect these resources.

Specific deliverables for this project include a summary report of tasks described above and examples (electronic and paper) of educational tools / curriculum developed as part of this grant. Receipts must be included for all equipment purchased as a part of this grant.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Small Scale Lake Planning
Date
4/1/2008
Waters Involved
Smith Lake
Status
Complete

Barnes/Eau Claire Lakes Area Property Owners: Dissolved Oxygen Monitoring On The Barnes Area/Eau Claire Chain Of Lakes: The Barnes-Eau Claire Property Owners Association is purchasing a temperature/dissolved oxygen (DO) meter to be used by several lakes included in the association to record full lake profiles of both of these parameters. More accurate and credible information will result from purchase of this meter. The specific meter purchased must be approved by the WI-DNR Lakes Program before reimbursement can take place. All DO and temperature information collected as a part of the Citizen Lake Monitoring Network must be entered into Wisconsin's Surface Water Inventory Management System (SWIMS) for as long as the given body of water is officially part of this program. Data entered into SWIMS is available to any who wish to access it.


Grant Details
Small Scale Lake Planning
Date
10/1/2010
Waters Involved
Smith Lake
Status
Complete

Barnes/Eau Claire Lakes Area Property Owners: Eco Education/Pontoon Classroom: The Eau Claire Lakes Area Property Owners Association is sponsoring a small scale planning grant to educate Drummond 7th graders about a wide range of lake characteristics and issues including biology, chemistry, geology, and the physics of lakes. The science will be applied to human impacts on water resources and emphasize the need to protect these resources.

Specific deliverables for this project include a summary report of tasks described above and examples (electronic and paper) of educational tools / curriculum developed as part of this grant. Receipts must be included for all equipment purchased as a part of this grant.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Small Scale Lake Planning
Date
4/1/2008
Waters Involved
Sweet Lake
Status
Complete

Barnes/Eau Claire Lakes Area Property Owners: Dissolved Oxygen Monitoring On The Barnes Area/Eau Claire Chain Of Lakes: The Barnes-Eau Claire Property Owners Association is purchasing a temperature/dissolved oxygen (DO) meter to be used by several lakes included in the association to record full lake profiles of both of these parameters. More accurate and credible information will result from purchase of this meter. The specific meter purchased must be approved by the WI-DNR Lakes Program before reimbursement can take place. All DO and temperature information collected as a part of the Citizen Lake Monitoring Network must be entered into Wisconsin's Surface Water Inventory Management System (SWIMS) for as long as the given body of water is officially part of this program. Data entered into SWIMS is available to any who wish to access it.


Grant Details
Small Scale Lake Planning
Date
10/1/2010
Waters Involved
Sweet Lake
Status
Complete

Barnes/Eau Claire Lakes Area Property Owners: Eco Education/Pontoon Classroom: The Eau Claire Lakes Area Property Owners Association is sponsoring a small scale planning grant to educate Drummond 7th graders about a wide range of lake characteristics and issues including biology, chemistry, geology, and the physics of lakes. The science will be applied to human impacts on water resources and emphasize the need to protect these resources.

Specific deliverables for this project include a summary report of tasks described above and examples (electronic and paper) of educational tools / curriculum developed as part of this grant. Receipts must be included for all equipment purchased as a part of this grant.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Small Scale Lake Planning
Date
4/1/2008
Waters Involved
Tomahawk Lake
Status
Complete

Barnes/Eau Claire Lakes Area Property Owners: Dissolved Oxygen Monitoring On The Barnes Area/Eau Claire Chain Of Lakes: The Barnes-Eau Claire Property Owners Association is purchasing a temperature/dissolved oxygen (DO) meter to be used by several lakes included in the association to record full lake profiles of both of these parameters. More accurate and credible information will result from purchase of this meter. The specific meter purchased must be approved by the WI-DNR Lakes Program before reimbursement can take place. All DO and temperature information collected as a part of the Citizen Lake Monitoring Network must be entered into Wisconsin's Surface Water Inventory Management System (SWIMS) for as long as the given body of water is officially part of this program. Data entered into SWIMS is available to any who wish to access it.


Grant Details
Small Scale Lake Planning
Date
2/15/2018
Waters Involved
Tomahawk Lake
Status
Complete

Town Of Barnes: Tomahawk Lake Park Engineering/Design Study: The Town of Barnes is contracting an engineering/design study of Tomahawk Lake Park. The purpose of the project is to ensure park improvement projects reduce runoff and erosion and restore native habitat to the park. The project also includes sign/kiosk construction and a partnership with the Barnes Garden Club to develop rain garden plans.

Final deliverables include: an engineering/design study with stormwater management recommendations, rain garden planting plans, and photo of park sign/kiosk. Note: stormwater management recommendations should go above and beyond those required for regulatory purposes.

The specific objectives, metrics, and deliverables for the listed activities are included in the application and supporting materials, and this scope is not intended to replace or supersede those documents.


Grant Details
Small Scale Lake Planning
Date
10/1/2003
Waters Involved
Unnamed
Status
Complete

St. Croix County: St. Croix Nutrient River Conference: St. Croix County Land and Water Conservation Department proposes to sponsor a conference in Februrary of 2004 to identify and begin to address factors contributing to the pollution of Lake St. Croix. The goal is to bring together wastewater treatment managers, local officials, water resource professionals, land developers and watershed manager to allow networking and sharing of information associated with nutrient and sediment loading in the lake. The DNR will be provided with both a paper copy and electronic copy of the final report.


Grant Details
Small Scale Lake Planning
Date
10/1/2004
Waters Involved
Unnamed
Status
Complete

St. Croix County: St. Croix Basin Conference: St Croix County proposes to sponsor an informational and educational conference relating to the protection and management of Lake St. Croix.


Grant Details
Small Scale Lake Planning
Date
4/1/2006
Waters Involved
Unnamed
Status
Complete

St. Croix County: St. Croix Conference '06: St. Croix County proposes to sponsor an informational and educational conference relating to the protection and management of Lake St. Croix. Major project elements to include: 1) conference costs associated with printing mailing, provision of lunch and transportation, 2) staff coordination.


Grant Details
Small Scale Lake Planning
Date
4/1/2008
Waters Involved
Unnamed
Status
Complete

Barnes/Eau Claire Lakes Area Property Owners: Dissolved Oxygen Monitoring On The Barnes Area/Eau Claire Chain Of Lakes: The Barnes-Eau Claire Property Owners Association is purchasing a temperature/dissolved oxygen (DO) meter to be used by several lakes included in the association to record full lake profiles of both of these parameters. More accurate and credible information will result from purchase of this meter. The specific meter purchased must be approved by the WI-DNR Lakes Program before reimbursement can take place. All DO and temperature information collected as a part of the Citizen Lake Monitoring Network must be entered into Wisconsin's Surface Water Inventory Management System (SWIMS) for as long as the given body of water is officially part of this program. Data entered into SWIMS is available to any who wish to access it.


Grant Details
Small Scale Lake Planning
Date
10/1/2010
Waters Involved
Unnamed
Status
Complete

Barnes/Eau Claire Lakes Area Property Owners: Eco Education/Pontoon Classroom: The Eau Claire Lakes Area Property Owners Association is sponsoring a small scale planning grant to educate Drummond 7th graders about a wide range of lake characteristics and issues including biology, chemistry, geology, and the physics of lakes. The science will be applied to human impacts on water resources and emphasize the need to protect these resources.

Specific deliverables for this project include a summary report of tasks described above and examples (electronic and paper) of educational tools / curriculum developed as part of this grant. Receipts must be included for all equipment purchased as a part of this grant.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Small Scale Lake Planning
Date
10/1/2010
Waters Involved
Unnamed
Status
Complete

Upper St Croix Lake Association: Upper St. Croix Lake Protection Grant App/Proposal: Upper St. Croix Lake Association, in partnership with the Town and Village of Solon Springs, is sponsoring a project to plan for future runoff and habitat improvements along Main Street. The grant proposal(s) will address the specific ranking criteria, including modeling water quality benefits. The final deliverables will be lake protection and targeted runoff management grant applications with enough detail to qualify as complete project proposals.

Special conditions: Lake Protection \2013 Plan Implementation project eligibility should be requested in writing prior to 1 March 2011, and DNR to review grant application proposals BEFORE final reimbursement is paid to contractor.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, reports, and education materials, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional lake coordinator.


Grant Details
Small Scale Lake Planning
Date
4/1/2013
Waters Involved
Unnamed
Status
Complete

Barnes/Eau Claire Lakes Area Property Owners: Lake Eco Education Program: The Barnes/Eau Claire Lakes Area Property Owners Association is expanding their Eco Education project to include additional 7th grade curriculum and supplies and an adult component. The adult component entails a seminar on lake ecology with a field trip.

Specific deliverables for this project include a summary report of tasks described above and examples (electronic and paper) of educational tools / curriculum developed as part of this grant.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Small Scale Lake Planning
Date
4/1/2008
Waters Involved
Upper Eau Claire Lake
Status
Complete

Barnes/Eau Claire Lakes Area Property Owners: Dissolved Oxygen Monitoring On The Barnes Area/Eau Claire Chain Of Lakes: The Barnes-Eau Claire Property Owners Association is purchasing a temperature/dissolved oxygen (DO) meter to be used by several lakes included in the association to record full lake profiles of both of these parameters. More accurate and credible information will result from purchase of this meter. The specific meter purchased must be approved by the WI-DNR Lakes Program before reimbursement can take place. All DO and temperature information collected as a part of the Citizen Lake Monitoring Network must be entered into Wisconsin's Surface Water Inventory Management System (SWIMS) for as long as the given body of water is officially part of this program. Data entered into SWIMS is available to any who wish to access it.


Grant Details
Small Scale Lake Planning
Date
10/1/2010
Waters Involved
Upper Eau Claire Lake
Status
Complete

Barnes/Eau Claire Lakes Area Property Owners: Eco Education/Pontoon Classroom: The Eau Claire Lakes Area Property Owners Association is sponsoring a small scale planning grant to educate Drummond 7th graders about a wide range of lake characteristics and issues including biology, chemistry, geology, and the physics of lakes. The science will be applied to human impacts on water resources and emphasize the need to protect these resources.

Specific deliverables for this project include a summary report of tasks described above and examples (electronic and paper) of educational tools / curriculum developed as part of this grant. Receipts must be included for all equipment purchased as a part of this grant.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Small Scale Lake Planning
Date
4/1/2013
Waters Involved
Upper Eau Claire Lake
Status
Complete

Barnes/Eau Claire Lakes Area Property Owners: Lake Eco Education Program: The Barnes/Eau Claire Lakes Area Property Owners Association is expanding their Eco Education project to include additional 7th grade curriculum and supplies and an adult component. The adult component entails a seminar on lake ecology with a field trip.

Specific deliverables for this project include a summary report of tasks described above and examples (electronic and paper) of educational tools / curriculum developed as part of this grant.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Small Scale Lake Planning
Date
10/1/2010
Waters Involved
Upper Saint Croix Lake
Status
Complete

Upper St Croix Lake Association: Upper St. Croix Lake Protection Grant App/Proposal: Upper St. Croix Lake Association, in partnership with the Town and Village of Solon Springs, is sponsoring a project to plan for future runoff and habitat improvements along Main Street. The grant proposal(s) will address the specific ranking criteria, including modeling water quality benefits. The final deliverables will be lake protection and targeted runoff management grant applications with enough detail to qualify as complete project proposals.

Special conditions: Lake Protection \2013 Plan Implementation project eligibility should be requested in writing prior to 1 March 2011, and DNR to review grant application proposals BEFORE final reimbursement is paid to contractor.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, reports, and education materials, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional lake coordinator.


Grant Details
River Planning Grant
Date
7/1/2005
Waters Involved
Saint Croix River
Status
Complete

Friends Of The St Croix Headwaters, Inc.: Building The Capacity Of The Friends Of The St. Croix Headwaters: The Friends of the St. Croix Headwaters (FOTSCH) will sponsor a project to build the capacity of the organization through increased membership and stakeholder support. With this project FOTSCH will conduct water quality monitoring on the Upper St. Croix River, conduct an educational outreach program, develop a river protection strategy including the identification of areas needing remediation, and become an advocacy group for river protection through local zoning, best management practices and statewide protective designations.

A membership committee will be established to plan and implement member/volunteer initiatives. Opportunities for citizen involvement in river oriented events will be provided including development of a video, canoe/kayak trips, participation in Water Action Volunteer (WAV) monitoring, identification of invasive species etc. Water quality monitoring will be conducted through the citizen based WAV program and monitoring conducted by the UW Stevens Point CWSE including two tributary and four river sites, baseflow, spring runoff and event sampling.

Project deliverables include: 1) copies of all educational materials developed, 2) organization effectiveness assessment results, 3) CWSE report on water quality monitoring results, and 4) Copy of the river protection strategy

Project results will be share through press releases, public meetings, public mailings and web site information. The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
River Planning Grant
Date
7/1/2008
Waters Involved
Saint Croix River
Status
Complete

Friends Of The St Croix Headwaters, Inc.: Building The Outreach Capacity Of Fotsch: Friends of the St. Croix Headwaters (FOTSCH) is initiating a project to expand community outreach, learn from and grow the first St. Croix Riverfest, and conduct an organizational assessment. Grant funds will be used to pay a staff person (i.e. Executive Director) who will be a liaison to community groups and local government, evaluate St. Croix Riverfest, and build sustainable tourism partnerships in the watershed.

Project deliverables include: 1) a final report on the project, including St. Croix Rivefest evaluation results and recommendations, organizational assessment overview, and community outreach summary and 2) educational/publicity materials developed.

This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, reports, and education materials, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional lake coordinator. Grantee or consultant will provide DNR lake coordinator with a draft for comment on report adequacy. DNR shall receive both paper and electronic copies of the deliverables along with, or prior to submission of grantee's final payment request.


Grant Details
River Planning Grant
Date
7/1/2009
Waters Involved
Saint Croix River
Status
Complete

Friends Of The St Croix Headwaters, Inc.: Aquatic Macrophyte And Ais Survey In The Upper St. Croix Watershed: Friends of the St. Croix Headwaters (FOTSCH) is initiating a project to complete aquatic plant and aquatic invasive species monitoring in the St. Croix River, including the headwaters between Upper St. Croix Lake and the St. Croix Flowage and below the Gordon Dam to Hwy T. The project includes a 2010 community information/education event as well as a visual field guide that describes the local aquatic plant community.

Project deliverables include: 1) aquatic plant survey results and report, including spreadsheets and GIS files; 2) one set aquatic plant vouchers; 3) aquatic plant visual field guide; 4) AIS survey maps and reports; 5) information/education event summary; and 6) any other presentations or information/education tools developed.

This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, reports, and education materials, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional lake coordinator.


Monitoring & Projects

Projects including grants, restoration work and studies shown below have occurred in this watershed. Click the links below to read through the text. While these are not an exhaustive list of activities, they provide insight into the management activities happening in this watershed.

Grants and Management Projects
Upper St. Croix and Eau Claire Rivers Watershed
Watershed Recommendations
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Control Invasive Species
 
Date
Status
2747300 Upper Saint Croix Lake
10/1/2012
Proposed
Projects
 
Information and Education
Hydrological Atlas of Bayfield County
Date
Status
Bayfield County is sponsoring a project to develop an online and interactive Hydrogeologic Atlas, including funding an expert to assist in developing this tool.
2/15/2017
In Progress
Projects
Documents
 
Monitor Water Quality or Sediment
Eau Claire River Temp
Date
Status
Do not want to use data this old to list. Recommend further monitoring. AU: 17087; ID: 10021045
5/1/2018
Proposed
Projects
 
Monitor Water Quality or Sediment
Eau Claire River Temp
Date
Status
Do not want to use data this old to list. Recommend further monitoring. AU: 17089; ID: 10012566
5/1/2018
Proposed
Projects
 
Nine Key Element Plan
Upper St. Croix - Eau Clair Rivers PWS Plan
Date
Status
Upper St. Croix - Eau Clair Rivers PWS Plan - Nine Key Element Plan - The Upper St. Croix - Eau Clair Rivers Priority Watershed is at the headwaters of the St. Croix River and the Mississippi River system. The historical significance of this resource is well documented in many accounts referring to the beauty and abundance of this outstanding resource. In 1988, the St. Croix River was designated as an Outstanding Resource Water by the State of Wisconsin. The Upper St. Croix - Eau Clair Rivers watershed project has a protection orientation, as opposed to the more traditional remediation based watershed projects, and takes a proactive approach to prevent nonpoint pollution before it happens.
6/1/1997
In Progress
Projects
Documents
 
Stormwater Planning, Implementation
City of Superior Green Infrastructure Code Audit
Date
Status
This project is an installation of nonpoint source best management practices to contribute to the restoration of Wisconsin?s waters and was funded by the 319 grant. Storm water planning activities will be undertaken by the municipality and will result in the following products: updated low impact development/conservation subdivision ordinance; updated storm water management plan for the entire developed urban area; and an updated storm water management plan for new development.
1/1/2018
In Progress
Projects
 
Train Volunteers to Monitor Loosestrife Biocontrol Success
 
Date
Status
4/28/2012
Proposed
Projects
 
Train Volunteers to Monitor Loosestrife Biocontrol Success
 
Date
Status
4/28/2012
Proposed
Projects
 
Train Volunteers to Raise Loosestrife Beetles
 
Date
Status
4/28/2012
Proposed
Projects
 
Water Quality Planning
AWQMP Program Overview Project
Date
Status
AWQMP Program Overview Project
12/1/1975
In Progress
Projects
 
Watercraft Inspections Clean Boats, Clean Waters
 
Date
Status
2747300 Upper Saint Croix Lake
4/1/2007
Proposed
Projects
 
Upper St. Croix and Eau Claire Rivers WatershedWatershed History Note

Upper Lake St. Croix is the center of the water highway which first brought the European explorers, missionaries and fur traders to the interior of the American continent. Over three hundred years ago explorers and traders came from Montreal in birch bark canoes by way of the Great Lakes. In 1852, four years after Wisconsin became a state, George Stuntz, who was employed to survey the Wisconsin - Minnesota boundary line, came to the head of the lakes. He later helped to plat the village of Solon Springs which was then known as White Birch. Charles Lord was the first settler in White Birch and many of his descendants still reside in the area. In 1886 White Birch became the headquarters for the area logging companies. One of the first to locate here was the Musser Sauntry Company of Stillwater. They built a logging camp at what is now the Main Street area of Solon Springs. Lake St. Croix was used as a giant holding pond with logs reaching from shore to shore. Logs were driven down river by "drivers" or "riverhogs" to Stillwater, or beyond. When the Dobie Brothers Lumber Company came in about 1894, they built a railroad from Solon Springs to Lake Minnesung. Their landing was at the head of the lake. The railroad grade ran along what is now County Road A. In 1891 Nick Lucius and three other parties purchased approximately 40 acres of land on the shores of Lake St. Croix. Eventually Lucius bought out the other parties. Lucius operated the land as a park for day use and camping. The land was sold to the State of Wisconsin and then deeded to Douglas County. The park was officially named Lucius Woods County Park in recognition of Mr. Lucius for his efforts in conserving the virgin growth pine woods. Near the end of the 1800s, Tom F. Solon proposed a water bottling factory to White Birch. He invented a liquid vending machine and patented it November 4, 1902, and began the Solon Springs Bottling Company. White Birch residents got behind the new bottling company, and in 1896 White Birch was renamed Solon Springs in honor of Thomas Solon and his contributions to the community.

Date  2011